Ben Richardson, CEO at SulNOx, confident they can cost-effectively decarbonise commercial shipping. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBHP Group Regulatory News (BHP)

Share Price Information for BHP Group (BHP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2,250.00
Bid: 2,249.00
Ask: 2,252.00
Change: 0.00 (0.00%)
Spread: 3.00 (0.133%)
Open: 2,249.00
High: 2,268.00
Low: 2,214.00
Prev. Close: 2,250.00
BHP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Review Half Year Ended 31 Dec 2017

18 Jan 2018 07:00

RNS Number : 2002C
BHP Billiton PLC
17 January 2018
 

 

Release Time

IMMEDIATE

Date

18 January 2018

Release Number

01/18

 

BHP OPERATIONAL REVIEWFOR THE HALF YEAR ENDED 31 DECEMBER 2017

 

· Full year production and unit cost guidance(1) maintained for Petroleum, Copper, Iron Ore and Energy Coal. At Western Australia Iron Ore (WAIO), a record annualised production rate of 284 Mt (100 per cent basis) was achieved for the December 2017 quarter.

· Production guidance for Metallurgical Coal reduced to between 41 and 43 Mt as a result of challenging roof conditions at Broadmeadow, which are expected to continue through the March 2018 quarter, and geotechnical issues triggered by wet weather impacts at Blackwater. Unit cost guidance is also expected to be negatively impacted and is currently under review.

· We continue to release latent capacity across our portfolio, with the Los Colorados Extension project successfully ramped up during the December 2017 quarter.

· In Onshore US, our operated rig count remained at nine during the December 2017 quarter but is expected to fall as we tailor plans to maximise value in the exit process. We continue to progress a number of alternatives to divest our Onshore US assets for value.

· All major projects under development are tracking to plan.

· Underlying EBIT(2) in the December 2017 half year is expected to include impairment charges, predominately related to conveyors at Escondida, in a range of US$250 million to US$350 million.

 

Production

 

Dec H17

 

vs Dec H16

 

Petroleum (MMboe)

99

(7%)

Lower volumes reflect the impact of Hurricane Harvey and Hurricane Nate on US petroleum assets and natural field decline.

Copper (kt)

833

17%

Increased volumes at Escondida supported by the ramp-up of the Los Colorados Extension project.

Iron ore(3) (Mt)

117

0%

Record production at Jimblebar and Mining Area C offset by planned maintenance and lower opening stockpile levels following the Mt Whaleback fire in June 2017.

Metallurgical coal(3) (Mt)

20

(4%)

Record production at four Queensland Coal mines offset by the lower volumes at Broadmeadow (roof conditions) and Blackwater (geotechnical issues).

Energy coal(3) (Mt)

14

4%

Strong performance at New South Wales Energy Coal offset by the impacts of unfavourable wet weather at Cerrejón.

BHP Chief Executive Officer, Andrew Mackenzie, said: "A strong operating performance in the first half allowed us to capture the benefit of higher prices. The successful Los Colorados Extension project ramp-up contributed to a 17 per cent increase in copper output and production records were achieved at a number of Western Australia Iron Ore and Queensland Coal mines. We have revised down our metallurgical coal production forecast for the full year as a result of geotechnical issues at both Broadmeadow and Blackwater. The momentum we've built across the wider portfolio during the second quarter will flow through to an expected stronger second half operating performance. Together with incremental production from latent capacity projects in iron ore and copper, we expect volume growth of six per cent for the full year."

 

1

SummaryOperational performance

Production for the December 2017 half year and guidance for the 2018 financial year are summarised in the table below.

 

Production

 

 

Dec H17

 

 

Dec Q17

 

 

Dec H17vsDec H16

 

 

Dec Q17vsDec Q16

 

 

Dec Q17vsSep Q17

 

 

PreviousFY18guidance

 

 

CurrentFY18guidance

 

 

Petroleum (MMboe)

99

48

(7%)

(6%)

(4%)

180 -190

180 -190

Onshore US (MMboe)

35

18

(13%)

(10%)

1%

61 - 67

61 - 67

Conventional (MMboe)

64

31

(3%)

(3%)

(6%)

119 - 123

119 - 123

Copper (kt)

833

429

17%

20%

6%

1,655 - 1,790

1,655 - 1,790

Escondida (kt)

583

315

29%

34%

17%

1,130 - 1,230

1,130 - 1,230

Other copper(i) (kt)

250

114

(4%)

(7%)

(16%)

525 - 560

525 - 560

Iron ore(ii) (Mt)

117

62

0%

3%

11%

239 - 243

239 - 243

WAIO (100% basis) (Mt)

136

72

0%

3%

11%

275 - 280(iii)

275 - 280(iii)

Metallurgical coal(ii) (Mt)

20

10

(4%)

(9%)

(8%)

44 - 46

41 - 43

Energy coal(ii) (Mt)

14

7

4%

10%

8%

29 - 30

29 - 30

 

(i) Other copper comprises Pampa Norte, Olympic Dam and Antamina.

(ii) Excludes production from Samarco, Haju (IndoMet Coal) and New Mexico Coal.

(iii) Subject to regulatory approvals to increase capacity above 270 Mt.

 

Major development projects

 

During the December 2017 half year, the BHP Board approved an investment of US$2.5 billion for the development of the Spence Growth Option.

BHP has four major projects under development in Petroleum, Copper and Potash, with a combined budget of US$7.5 billion over the life of the projects. All projects remain on time and on budget.

 

Corporate update

 

BHP expects Underlying EBIT in the December 2017 half year to include impairment charges (predominately related to conveyors at Escondida that are no longer planned to be utilised due to the successful completion of the Los Colorados Extension project) in a range of US$250 million to US$350 million.

The Group's adjusted effective tax rate(4) for the December 2017 half year is currently being finalised and is expected to be below the full year guidance range of 32 to 37 per cent.

As previously highlighted, during the December 2017 half year we made final corporate income tax cash payments in Australia of approximately US$1.3 billion relating to the prior year. We also successfully concluded a US$2.9 billion multi-currency bond repurchase plan, with total costs in relation to the repurchase program of approximately US$100 million to be reported in net finance costs in the December 2017 half year financial results.

On 16 November 2017, Samarco and its shareholders, Vale S.A. and BHP Billiton Brasil, entered into an agreement with the Federal Prosecutors' Office in Brazil and the Minas Gerais State Prosecutors Office (Amendment Agreement). The Amendment Agreement, subject to ratification by the 12th Federal Court of Minas Gerais, amends the Preliminary Agreement(5) entered into on 18 January 2017 in relation to the Samarco dam failure (Preliminary Agreement). The Amendment Agreement provides for the State Prosecutors to become a party to the Preliminary Agreement and provides for additional community consultation.

 

2

Samarco, Vale S.A., BHP Billiton Brasil and the Federal Prosecutors also jointly requested, and the 12th Federal Court has approved, an additional 150 days, ending on 20 April 2018, for the parties to continue negotiations for the settlement of the Public Civil Claims.

On 22 December 2017, BHP announced a total of US$181 million in further financial support for the Renova Foundation and Samarco until 30 June 2018. This comprises US$133 million to fund the Renova Foundation which will be offset against the Group's provision for the Samarco dam failure, US$6 million of fees payable to experts appointed in connection with remediation and compensation programs and a short-term facility of up to US$42 million to be made available to Samarco.

As at the date of this Operational Review, we are not in a position to provide an update, for the purpose of the December 2017 half year financial results, on the ongoing potential financial impacts on BHP Billiton Brasil of the Samarco dam failure. Any financial impacts will continue to be classified as an exceptional item.

On 22 December 2017, the US President signed a new US tax law (H.R. 1). BHP is currently working through the financial impacts of the tax reform, which will include a non-cash revaluation of the Group's US net deferred tax assets. The financial impact is expected to give rise to an exceptional item in the December 2017 half year financial results. Longer term, we expect US attributable profits to be positively impacted by the lower US corporate income tax rate.

Marketing update

The average realised prices achieved for our major commodities are summarised in the table below. The majority of iron ore shipments were linked to the index price for the month of shipment, with price differentials predominantly a reflection of product quality and market fundamentals. The majority of metallurgical coal and energy coal exports were linked to the index price for the month of shipment or sold on the spot market at fixed or index-linked prices, with price differentials reflecting product quality.

Average realised prices(i)

 

Dec H17

 

Dec H16

 

Jun H17

 

FY17

 

Dec H17vsDec H16

 

Dec H17vsJun H17

 

Dec H17vsFY17

 

Oil (crude and condensate) (US$/bbl)

54

45

50

48

20%

8%

13%

Natural gas (US$/Mscf)(ii)

3.54

3.21

3.48

3.34

10%

2%

6%

US natural gas (US$/Mscf)

2.84

2.79

2.98

2.88

2%

(5%)

(1%)

LNG (US$/Mscf)

7.48

6.35

7.37

6.84

18%

1%

9%

Copper (US$/lb)

3.20

2.41

2.70

2.54

33%

19%

26%

Iron ore (US$/wmt, FOB)

57

55

62

58

4%

(8%)

(2%)

Hard coking coal (US$/t)

182

179

180

180

2%

1%

1%

Weak coking coal (US$/t)

121

122

121

121

(1%)

0%

0%

Thermal coal (US$/t)(iii)

87

74

75

75

18%

16%

16%

Nickel metal (US$/t)

11,083

10,581

9,799

10,184

5%

13%

9%

 

(i) Based on provisional, unaudited estimates. Prices exclude sales from equity accounted investments, third party product and internal sales, and represent the weighted average of various sales terms (for example: FOB, CIF and CFR), unless otherwise noted. Includes the impact of provisional pricing and finalisation adjustments.

(ii) Includes internal sales.

(iii) Export sales only. Includes thermal coal sales from metallurgical coal mines.

 

At 31 December 2017, the Group had 348 kt of outstanding copper sales that were revalued at a weighted average price of US$3.28 per pound. The final price of these sales will be determined over the remainder of the 2018 financial year. In addition, 254 kt of copper sales from the 2017 financial year were subject to a finalisation adjustment in the current period. The provisional pricing and finalisation adjustments will increase Underlying EBITDA(2) by US$246 million in the December 2017 half year.

 

 

 

3

PetroleumProduction

Dec H17

 

Dec Q17

 

Dec H17vsDec H16

 

Dec Q17vsDec Q16

 

Dec Q17vsSep Q17

 

Crude oil, condensate and natural gas liquids (MMboe)

45

22

(8%)

(7%)

1%

Natural gas (bcf)

325

157

(6%)

(5%)

(7%)

Total petroleum production (MMboe)

99

48

(7%)

(6%)

(4%)

 

Petroleum - Total petroleum production for the December 2017 half year decreased by seven per cent to 99 MMboe. Guidance for the 2018 financial year remains unchanged at between 180 and 190 MMboe, comprising Conventional volumes between 119 and 123 MMboe and Onshore US volumes between 61 and 67 MMboe.

 

Production breakdown

 

Dec H17

 

vs Dec H16

 

Crude oil, condensate and natural gas liquids (MMboe)

Conventional

30

(6%)

Decrease due to the impact of Hurricane Harvey and Hurricane Nate in the Gulf of Mexico and natural field decline across the portfolio.

Onshore US

15

(12%)

Decrease due to the impact of Hurricane Harvey and natural field decline, which more than offset additional wells put online in the Black Hawk and Permian.

Total

45

(8%)

Natural gas (bcf)

Conventional

203

(1%)

Production broadly unchanged.

Onshore US

122

(14%)

Decrease due to the impact of Hurricane Harvey and natural field decline, partially offset by additional wells put online in the Eagle Ford, Permian and Haynesville.

Total

325

(6%)

 

Completion of the agreement with Chevron and ExxonMobil to withdraw from our 4.95 per cent interest in the Genesis deepwater asset in the Gulf of Mexico occurred in December 2017, with an effective date of 1 January 2017.

 

Projects

 

Project andownership

 

Capital expenditure (US$m)

 

Initial production target date

 

Capacity

 

Progress

 

North West Shelf Greater Western Flank-B(Australia)16.67% (non-operator)

314

CY19

To maintain LNG plant throughput from the North West Shelf operations.

On schedule and budget. The overall project is 66% complete.

Mad Dog Phase 2(US Gulf of Mexico)23.9% (non-operator)

2,154

CY22

New floating production facility with the capacity to produce up to 140,000 gross barrels of crude oil per day.

On schedule and budget. The overall project is 10% complete.

Petroleum capital expenditure of approximately US$1.9 billion is now planned in the 2018 financial year, a reduction from our previous guidance of US$2.0 billion. Onshore US capital expenditure is expected to be lower at US$1.1 billion, reflecting development activity tailored to support value in the exit process and meet Hold by Production obligations. Conventional capital expenditure of US$0.8 billion remains unchanged, focused on high-return infill drilling opportunities in the Gulf of Mexico, a life extension project at North West Shelf and investment in the Mad Dog Phase 2 project.

 

 

4

Onshore US development activity

Onshore US drilling and development expenditure for the December 2017 half year was US$336 million (US$511 million on an activity basis). Our operated rig count remained at nine during the December 2017 quarter.

· We have adjusted our Onshore US capital plans to optimise value for our planned exit.

· In the Permian, sub-surface trials have confirmed first year production improvements associated with larger completions. We reduced our rig count from three to two (in December 2017 quarter) as we focused on meeting Hold by Production obligations and progressing sub-surface trials.

· In the Eagle Ford, we increased our rig count from two to three in the December 2017 quarter to test the Austin Chalk horizon and trial larger completions in Hawkville. We anticipate a return to two rigs during the March 2018 quarter.

· In the Haynesville, we recently incorporated larger completions and have been operating new wells with larger chokes, both of which have improved results. We will continue to implement these changes in future wells, but expect to lower our rig count during the second half of the 2018 financial year as rig contracts expire and we optimise future investments ahead of our planned exit.

· In the Fayetteville, our plans remain unchanged at this time. We continue to assess the potential of the Moorefield horizon based on data from the new non-operated wells.

December 2017 half year

Liquids focused areas

 

Gas focused areas

 

(December 2016 half year)

 

Eagle Ford

 

Permian

 

Haynesville

 

Fayetteville

 

Total

 

Capital expenditure(i)

US$ billion

0.1 (0.1)

0.1 (0.1)

0.1 (0.0)

0.0 (0.0)

0.3 (0.3)

Rig allocation

At period end

3 (1)

2 (1)

4 (1)

0 (0)

9 (3)

Net wells drilled and completed(ii)

Period total

9 (43)

10 (15)

10 (0)

0 (2)

29 (60)

Net productive wells

At period end

931 (942)

136 (118)

405 (394)

1,043 (1,042)

2,515 (2,496)

 

(i) Includes land acquisition, site preparation, drilling, completions, well site facilities, mid-stream infrastructure and pipelines.

(ii) Can vary between periods based on changes in rig activity and the inventory of wells drilled but not yet completed at period end.

We continue to progress a number of alternatives to exit our Onshore US assets for value. We are preparing all appropriate documentation ahead of data rooms being opened to potential trade sale buyers by the end of the March 2018 quarter. In parallel, we continue to explore a potential exit via demerger or Initial Public Offering.

 

Petroleum exploration

Exploration and appraisal wells drilled during the December 2017 quarter are summarised below.

 

Well

 

Location

 

Target

 

BHP equity

 

Spud date

 

Water depth

 

Total well depth

 

Status

 

Scimitar

US Gulf of Mexico GC392

Oil

65%

1 October 2017

1,289 m

9,386 m

Drilling ahead

In the US Gulf of Mexico, the Scimitar well was spud on 1 October 2017, with results expected in the March 2018 quarter. BHP holds a 65 per cent working interest and is the operator of the Scimitar prospect, with partner Repsol (20 per cent working interest) and Statoil (15 per cent working interest).

In Mexico, an Exploration and Appraisal plan for the Trion contractual area licence number CNH-A1-Trion/2016 (formerly referred to as blocks AE-0092 and AE-0093) was submitted to the Comisión Nacional de Hidrocarburos of Mexico by BHP and Pemex on 29 August 2017, in line with regulatory requirements. We have received positive feedback and planning continues for the exploration and appraisal wells which are expected to be drilled in the 2019 financial year.

5

In Trinidad and Tobago, we continued appraisal work to assess the potential commercialisation of the gas discovery at LeClerc. Preparations continued for Phase 2 deepwater exploration which is expected to commence in the second half of the 2018 financial year.

Petroleum exploration expenditure for the December 2017 half year was US$378 million, of which US$137 million was expensed. A US$715 million exploration program is planned for the 2018 financial year. This program comprises the Wildling-2 side track and Scimitar exploration well in the US Gulf of Mexico and two wells in Trinidad and Tobago, with the third well now expected to be drilled at the beginning of the 2019 financial year.

 

Copper

 Production

 

Dec H17

 

Dec Q17

 

Dec H17vsDec H16

 

Dec Q17vsDec Q16

 

Dec Q17vsSep Q17

 

Copper (kt)

833

429

17%

20%

6%

Zinc (t)

58,255

29,054

54%

30%

(1%)

Uranium oxide concentrate (t)

1,123

243

(43%)

(77%)

(72%)

Copper - Total copper production for the December 2017 half year increased by 17 per cent to 833 kt. Guidance for the 2018 financial year remains unchanged at between 1,655 and 1,790 kt.

Escondida copper production for the December 2017 half year increased by 29 per cent to 583 kt, supported by the start-up of the Los Colorados Extension (LCE) project on 10 September 2017. LCE successfully ramped up during the December 2017 quarter, enabling utilisation of the three concentrators. Production guidance for the 2018 financial year remains unchanged at between 1,130 and 1,230 kt. Escondida and Union N°2 of Supervisors and Staff signed a new Collective Agreement, valid from 1 October 2017, which has a duration of 36 months. The existing agreement with Union N°1 will expire on 1 August 2018, with planning underway for early negotiations.

Pampa Norte copper production for the December 2017 half year increased by nine per cent to 126 kt, supported by record material mined at Cerro Colorado and rapid ramp-up at the Spence tank house post unplanned maintenance during the September 2017 quarter. Pampa Norte production guidance for the 2018 financial year remains unchanged and is expected to be higher than the prior year.

Olympic Dam copper production for the December 2017 half year decreased by 31 per cent to 54 kt as a result of the planned major smelter maintenance campaign recently completed. Smelting operations have now resumed with the first anode cast from the flash furnace on 23 December 2017. Operations will continue to ramp-up to full capacity in the March 2018 quarter, with production guidance unchanged at 150 kt for the 2018 financial year. We expect production to increase to approximately 215 kt in the 2019 financial year, underpinned by improved operating performance and higher ore grades from the Southern Mine Area.

Antamina copper production for the December 2017 half year increased by five per cent to 70 kt and zinc production increased 54 per cent to 58 kt due to higher head grades and mining progressing through a zinc-rich ore zone consistent with the mine plan. Guidance for the 2018 financial year remains unchanged, with copper production of approximately 125 kt and zinc production of approximately 100 kt.

 

 

 

 

 

 

 

 

 

 

6

Projects

 

Project andownership

 

Capital expenditure (US$m)

 

Initial production target date

 

Capacity

 

Progress

 

Spence Growth Option(Chile)100%

 2,460

FY21

New 95 ktpd concentrator is expected to increase Spence's payable copper in concentrate production by approximately 185 ktpa in the first 10 years of operation and extend the mining operations by more than 50 years.

On schedule and budget. The overall project is 4% complete.

 

Iron Ore

 Production

 

Dec H17

 

Dec Q17

 

Dec H17vsDec H16

 

Dec Q17vsDec Q16

 

Dec Q17vsSep Q17

 

Iron ore(i) (kt)

117,144

61,557

0%

3%

11%

 

(i) Represents Western Australia Iron Ore (WAIO). Excludes production from Samarco.

Iron ore - Total iron ore production for the December 2017 half year was in line with the same period last year at 117 Mt, or 136 Mt on a 100 per cent basis. Guidance for the 2018 financial year remains unchanged at between 239 and 243 Mt, or between 275 and 280 Mt on a 100 per cent basis, with volumes weighted to the second half of the financial year as expected.

At WAIO, record production at Jimblebar and Mining Area C was offset by the impact of lower opening stockpile levels following the fire at the Mt Whaleback screening plant in June 2017, and planned maintenance in the previous quarter. Volumes increased by 11 per cent from the September 2017 quarter with a record annualised rate of 284 Mt (100 per cent basis) achieved for the December 2017 quarter. The higher volumes reflect increased plant availability and improved rail performance. Port debottlenecking activities were completed in the December 2017 quarter and will support higher volumes in the second half of the financial year.

BHP continues to work with the relevant authorities in relation to the necessary approvals to increase system capacity to 290 Mtpa (100 per cent basis).

Mining and processing operations at Samarco remain suspended following the failure of the Fundão tailings dam and Santarém water dam on 5 November 2015.

 

Coal

Production 

Dec H17

 

Dec Q17

 

Dec H17vsDec H16

 

Dec Q17vsDec Q16

 

Dec Q17vsSep Q17

 

Metallurgical coal (kt)

20,252

9,685

(4%)

(9%)

(8%)

Energy coal (kt)

14,029

7,297

4%

10%

8%

 

 

 

7

Metallurgical coal - Metallurgical coal production for the December 2017 half year decreased by four per cent to 20 Mt. Guidance for the 2018 financial year has been reduced to between 41 and 43 Mt and reflects lower volumes now expected at Broadmeadow and Blackwater. As a result of the reduced Broadmeadow and Blackwater volumes and compensatory increased production from higher cost pits, unit cost guidance is also expected to be negatively impacted and is currently under review.

At Queensland Coal, production for the December 2017 half year was lower due to the impacts of ongoing challenging roof conditions at Broadmeadow and geotechnical issues brought on by wet weather at Blackwater. This was partially offset by record production at South Walker Creek, Saraji, Caval Ridge and Daunia, underpinned by improved truck and shovel performance, utilisation of latent dragline capacity at Caval Ridge and increased wash-plant feed rates.

The Caval Ridge Southern Circuit project is progressing according to plan, with production expected to ramp-up early in the 2019 financial year.

Energy coal - Energy coal production for the December 2017 half year increased by four per cent to 14 Mt. Guidance for the 2018 financial year remains unchanged at 29 to 30 Mt.

New South Wales Energy Coal production increased by 10 per cent as it benefitted from improved stripping performance, higher truck utilisation and additional bypass coal. This was partially offset by a six per cent decline in Cerrejón production, which was impacted by wet weather conditions during the September 2017 quarter.

 

Other

 Nickel production

 

Dec H17

 

Dec Q17

 

Dec H17vsDec H16

 

Dec Q17vsDec Q16

 

Dec Q17vsSep Q17

 

Nickel (kt)

45.2

22.4

11%

1%

(2%)

Nickel - Nickel West production for the December 2017 half year increased by 11 per cent to 45 kt of nickel primarily due to improved performance at the Kalgoorlie smelter. Nickel production guidance for the 2018 financial year remains unchanged and is expected to be broadly in line with the 2017 financial year.

Potash project

 

Project and ownership

 

Investment(US$m)

 

Scope

 

Progress

 

Jansen Potash(Canada)100%

2,600

Investment to finish the excavation and lining of the production and service shafts, and to continue the installation of essential surface infrastructure and utilities.

The project is 75% complete and within the approved budget. Shaft excavation is progressing.

 

Minerals exploration

Minerals exploration expenditure for the December 2017 half year was US$86 million, of which US$55 million was expensed. Greenfield minerals exploration is predominantly focused on advancing copper targets within Chile, Ecuador, Peru, Canada, South Australia and the South-West United States.

Variance analysis relates to the relative performance of BHP and/or its operations during the December 2017 half year compared with the December 2016 half year, unless otherwise noted. Production volumes, sales volumes and capital and exploration expenditure from subsidiaries are reported on a 100 per cent basis; production and sales volumes from equity accounted investments and other operations are reported on a proportionate consolidation basis. Copper equivalent production based on 2017 financial year average realised prices.

 

 

8

The following footnotes apply to this Operational Review:

 

(1) 2018 financial year unit cost guidance is based on exchange rates of AUD/USD 0.75 and USD/CLP 663.

(2) Underlying EBIT and Underlying EBITDA are used to reflect the underlying performance of BHP. Underlying EBIT is earnings before net finance costs, taxation and any exceptional items. Underlying EBITDA is Underlying EBIT before depreciation, amortisation and impairment.

(3) Excludes production from Samarco, Haju (IndoMet Coal) and New Mexico Coal.

(4) Adjusted effective tax rate comprises Total taxation (expense)/benefit excluding exceptional items and exchange rate movements included in taxation (expense)/benefit divided by Profit/(loss) before taxation and exceptional items.

(5) The Preliminary Agreement outlines the process and timeline for negotiation of a settlement of the BRL 155 billion (approximately US$47 billion) and BRL 20 billion (approximately US$6 billion) Public Civil Claims relating to the dam failure.

 

The following abbreviations may have been used throughout this report: barrels (bbl); billion cubic feet (bcf); cost and freight (CFR); cost, insurance and freight (CIF); dry metric tonne unit (dmtu); free on board (FOB); grams per tonne (g/t); kilograms per tonne (kg/t); kilometre (km); metre (m); million barrels of oil equivalent (MMboe); million cubic feet per day (MMcf/d); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); pounds (lb); thousand barrels of oil equivalent (Mboe); thousand ounces (koz); thousand standard cubic feet (Mscf); thousand tonnes (kt); thousand tonnes per annum (ktpa); thousand tonnes per day (ktpd); tonnes (t); and wet metric tonnes (wmt).

 

  

9

Further information on BHP can be found at: bhp.com

 

Media Relations

Investor Relations

Email: media.relations@bhpbilliton.com

Email: investor.relations@bhpbilliton.com

Australia and Asia

Australia and Asia

Ben Pratt

Tara Dines

Tel: +61 3 9609 3672 Mobile: +61 419 968 734

Tel: +61 3 9609 2222 Mobile: +61 499 249 005

United Kingdom and South Africa

United Kingdom and South Africa

Neil Burrows

Rob Clifford

Tel: +44 20 7802 7484 Mobile: +44 7786 661 683

Tel: +44 20 7802 4131 Mobile: +44 7788 308 844

North America

Americas

Judy Dane

James Wear

Tel: +1 713 961 8283 Mobile: +1 713 299 5342

Tel: +1 713 993 3737 Mobile: +1 347 882 3011

 

BHP Billiton Limited ABN 49 004 028 077

BHP Billiton Plc Registration number 3196209

LEI WZE1WSENV6JSZFK0JC28

LEI 549300C116EOWV835768

Registered in Australia

Registered in England and Wales

Registered Office: Level 18, 171 Collins Street

Registered Office: Nova South, 160 Victoria Street

Melbourne Victoria 3000 Australia

London SW1E 5LB United Kingdom

Tel +61 1300 55 4757 Fax +61 3 9609 3015

Tel +44 20 7802 4000 Fax +44 20 7802 4111

 

Members of BHP which is

headquartered in Australia

 

Follow us on social media

 

 

 

 

10

 

Production summary

Quarter ended

 

Year to date

 

BHPinterest

 

Dec2016

 

Mar2017

 

Jun 2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Petroleum (1)

Petroleum

Crude oil, condensate and NGL (Mboe)

Onshore US

8,143

9,439

8,501

7,079

7,423

14,502

16,431

Conventional

15,768

15,369

15,612

15,090

14,869

29,959

31,727

 

 

 

 

 

 

 

Total

23,911

24,808

24,113

22,169

22,292

44,461

48,158

 

 

 

 

 

 

 

Natural gas (bcf)

Onshore US

67.8

66.1

67.2

61.4

60.5

121.9

141.7

Conventional

97.1

88.4

99.5

107.3

96.1

203.4

204.9

 

 

 

 

 

 

 

Total

164.9

154.5

166.7

168.7

156.6

325.3

346.6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total petroleum production (MMboe)

51.4

50.6

51.9

50.3

48.4

98.7

105.9

 

 

 

 

 

 

 

Copper (2)

Copper

Payable metal in concentrate (kt)

Escondida (3)

57.5%

162.6

67.6

162.4

196.3

238.5

434.8

309.6

Antamina

33.8%

32.0

29.2

38.5

35.9

33.8

69.7

66.1

 

 

 

 

 

 

 

Total

194.6

96.8

200.9

232.2

272.3

504.5

375.7

 

 

 

 

 

 

 

Cathode (kt)

Escondida (3)

57.5%

71.5

27.2

62.8

71.9

76.1

148.0

142.0

Pampa Norte (4)

100%

53.8

66.1

72.3

58.0

68.4

126.4

115.9

Olympic Dam

100%

37.2

36.8

51.4

42.0

12.2

54.2

78.1

 

 

 

 

 

 

 

Total

162.5

130.1

186.5

171.9

156.7

328.6

336.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total copper (kt)

357.1

226.9

387.4

404.1

429.0

833.1

711.7

 

 

 

 

 

 

 

Lead

Payable metal in concentrate (t)

Antamina

33.8%

1,220

1,308

1,799

1,415

1,009

2,424

2,366

 

 

 

 

 

 

 

Total

1,220

1,308

1,799

1,415

1,009

2,424

2,366

 

 

 

 

 

 

 

Zinc

Payable metal in concentrate (t)

Antamina

33.8%

22,406

20,653

29,076

29,201

29,054

58,255

37,773

 

 

 

 

 

 

 

Total

22,406

20,653

29,076

29,201

29,054

58,255

37,773

 

 

 

 

 

 

 

Gold

Payable metal in concentrate (troy oz)

Escondida (3)

57.5%

37,784

11,572

33,941

50,525

50,279

100,804

65,345

Olympic Dam (refined gold)

100%

29,651

21,941

28,188

13,101

15,969

29,070

54,017

 

 

 

 

 

 

 

Total

67,435

33,513

62,129

63,626

66,248

129,874

119,362

 

 

 

 

 

 

 

 

 

 

11

Quarter ended

 

Year to date

 

BHPinterest

 

Dec2016

 

Mar2017

 

Jun 2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Silver

Payable metal in concentrate (troy koz)

Escondida (3)

57.5%

1,323

540

1,234

1,737

2,193

3,930

2,552

Antamina

33.8%

1,446

1,301

1,691

1,596

1,331

2,927

2,791

Olympic Dam (refined silver)

100%

188

174

243

131

135

266

351

 

 

 

 

 

 

 

Total

2,957

2,015

3,168

3,464

3,659

7,123

5,694

 

 

 

 

 

 

 

Uranium

Payable metal in concentrate (t)

Olympic Dam

100%

1,060

948

737

880

243

1,123

1,976

 

 

 

 

 

 

 

Total

1,060

948

737

880

243

1,123

1,976

 

 

 

 

 

 

 

Molybdenum

Payable metal in concentrate (t)

Antamina

33.8%

225

30

328

402

579

981

786

 

 

 

 

 

 

 

Total

225

30

328

402

579

981

786

 

 

 

 

 

 

 

 

12

Production summary

Quarter ended

 

Year to date

 

BHPinterest

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Iron Ore

Iron Ore

Production (kt) (5)

Newman

85%

17,751

16,283

16,241

13,842

18,317

32,159

35,759

Area C Joint Venture

85%

12,179

11,165

13,016

13,099

13,575

26,674

24,563

Yandi Joint Venture

85%

17,555

14,656

17,415

14,559

16,348

30,907

33,284

Jimblebar (6)

85%

5,178

4,824

5,891

6,283

4,583

10,866

11,235

Wheelarra

85%

7,386

6,647

7,578

7,804

8,734

16,538

12,795

Samarco

50%

-

-

-

-

-

-

-

 

 

 

 

 

 

 

Total

60,049

53,575

60,141

55,587

61,557

117,144

117,636

 

 

 

 

 

 

 

Coal

Metallurgical coal

Production (kt) (7)

BMA

50%

8,684

7,996

6,394

8,296

7,394

15,690

17,068

BHP Mitsui Coal (8)

80%

1,929

2,138

2,100

2,271

2,291

4,562

4,074

Haju (9)

75%

27

-

-

-

-

-

129

 

 

 

 

 

 

 

Total

10,640

10,134

8,494

10,567

9,685

20,252

21,271

 

 

 

 

 

 

 

Energy coal

Production (kt)

USA

100%

-

-

-

-

-

-

451

Australia

100%

3,851

4,662

5,711

4,235

4,383

8,618

7,803

Colombia

33.3%

2,800

2,756

2,475

2,497

2,914

5,411

5,728

 

 

 

 

 

 

 

Total

6,651

7,418

8,186

6,732

7,297

14,029

13,982

 

 

 

 

 

 

 

Other

Nickel

Saleable production (kt)

Nickel West

100%

22.1

19.0

25.2

22.8

22.4

45.2

40.9

 

 

 

 

 

 

 

Total

22.1

19.0

25.2

22.8

22.4

45.2

40.9

 

 

 

 

 

 

 

 

(1) LPG and ethane are reported as natural gas liquids (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe). Total boe conversions are based on 6 bcf of natural gas equals 1 MMboe.

(2) Metal production is reported on the basis of payable metal.

(3) Shown on a 100% basis. BHP interest in saleable production is 57.5%.

(4) Includes Cerro Colorado and Spence.

(5) Iron ore production is reported on a wet tonnes basis.

(6) Shown on a 100% basis. BHP interest in saleable production is 85%.

(7) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(8) Shown on a 100% basis. BHP interest in saleable production is 80%.

(9) Shown on a 100% basis. BHP interest in saleable production is 75%.

 

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

 

13

Production and sales report

 

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Petroleum (1)

Bass Strait

Crude oil and condensate

(Mboe)

1,770

1,355

1,552

1,815

1,513

3,328

3,692

NGL

(Mboe)

1,460

1,236

1,661

1,950

1,584

3,534

3,562

Natural gas

(bcf)

31.3

28.7

37.4

42.6

32.9

75.5

73.2

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

8.4

7.4

9.4

10.9

8.6

19.4

19.5

 

 

 

 

 

 

 

North West Shelf

Crude oil and condensate

(Mboe)

1,468

1,239

1,314

1,474

1,442

2,916

2,954

NGL

(Mboe)

263

200

209

227

200

427

555

Natural gas

(bcf)

36.9

32.2

32.5

36.2

36.2

72.4

75.6

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

7.9

6.8

6.9

7.7

7.7

15.4

16.1

 

 

 

 

 

 

 

Pyrenees

Crude oil and condensate

(Mboe)

1,726

1,509

1,606

1,510

1,210

2,720

3,402

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

1.7

1.5

1.6

1.5

1.2

2.7

3.4

 

 

 

 

 

 

 

Other Australia (2)

Crude oil and condensate

(Mboe)

8

8

9

9

8

17

18

Natural gas

(bcf)

17.1

15.2

16.3

16.1

13.3

29.4

34.6

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

2.9

2.5

2.7

2.7

2.2

4.9

5.8

 

 

 

 

 

 

 

Atlantis (3)

Crude oil and condensate

(Mboe)

3,263

3,881

3,637

3,022

3,377

6,399

6,317

NGL

(Mboe)

207

295

213

218

195

413

415

Natural gas

(bcf)

1.6

2.1

1.9

1.6

1.8

3.4

3.1

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

3.7

4.5

4.2

3.5

3.9

7.4

7.2

 

 

 

 

 

 

 

Mad Dog (3)

Crude oil and condensate

(Mboe)

1,170

1,185

1,167

1,020

1,231

2,251

2,120

NGL

(Mboe)

52

59

68

44

72

116

88

Natural gas

(bcf)

0.2

0.2

0.2

0.1

0.2

0.3

0.3

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

1.3

1.3

1.3

1.1

1.3

2.4

2.3

 

 

 

 

 

 

 

Shenzi (3)

Crude oil and condensate

(Mboe)

2,692

2,675

2,588

2,291

2,513

4,804

5,324

NGL

(Mboe)

131

161

179

141

184

325

225

Natural gas

(bcf)

0.5

0.5

0.6

0.4

0.5

0.9

1.0

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

2.9

2.9

2.9

2.5

2.8

5.3

5.7

 

 

 

 

 

 

 

Eagle Ford (4)

Crude oil and condensate

(Mboe)

4,008

5,451

4,278

3,457

3,720

7,177

7,879

NGL

(Mboe)

2,159

2,354

2,240

1,856

2,100

3,956

4,427

Natural gas

(bcf)

15.2

17.0

15.1

13.8

14.4

28.2

31.7

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

8.7

10.6

9.0

7.6

8.2

15.8

17.6

 

 

 

 

 

 

 

 

 

14

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Permian (4)

Crude oil and condensate

(Mboe)

1,378

1,202

1,336

1,179

1,142

2,321

2,793

NGL

(Mboe)

580

428

646

587

460

1,047

1,314

Natural gas

(bcf)

4.4

4.0

6.2

4.5

3.6

8.1

8.8

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

2.7

2.3

3.0

2.5

2.2

4.7

5.6

 

 

 

 

 

 

 

Haynesville (4)

Crude oil and condensate

(Mboe)

3

1

1

-

1

1

3

NGL

(Mboe)

15

3

-

-

-

-

15

Natural gas

(bcf)

24.0

22.0

21.4

21.5

22.0

43.5

52.2

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

4.0

3.7

3.6

3.6

3.7

7.3

8.7

 

 

 

 

 

 

 

Fayetteville (4)

Natural gas

(bcf)

24.2

23.1

24.5

21.6

20.5

42.1

49.0

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

4.0

3.9

4.1

3.6

3.4

7.0

8.2

 

 

 

 

 

 

 

 

15

Production and sales report

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Petroleum (1) (continued)

Trinidad/Tobago

Crude oil and condensate

(Mboe)

156

127

139

118

135

253

296

Natural gas

(bcf)

8.4

8.4

9.4

9.7

10.5

20.2

14.8

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

1.6

1.5

1.7

1.7

1.9

3.6

2.8

 

 

 

 

 

 

 

Other Americas (3) (5)

Crude oil and condensate

(Mboe)

269

257

238

229

207

436

544

NGL

(Mboe)

5

6

10

5

3

8

6

Natural gas

(bcf)

0.1

0.1

0.1

0.1

0.1

0.2

0.2

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

0.3

0.3

0.3

0.3

0.2

0.5

0.6

 

 

 

 

 

 

 

UK

Crude oil and condensate

(Mboe)

63

72

64

40

22

62

132

NGL

(Mboe)

49

32

16

39

13

52

71

Natural gas

(bcf)

1.0

1.0

1.1

0.5

0.6

1.1

2.1

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

0.3

0.3

0.3

0.2

0.1

0.3

0.6

 

 

 

 

 

 

 

Algeria

Crude oil and condensate

(Mboe)

1,016

1,072

942

938

960

1,898

2,006

 

 

 

 

 

 

 

Total petroleum products

(MMboe)

1.0

1.1

0.9

0.9

1.0

1.9

2.0

 

 

 

 

 

 

 

BHP Petroleum

Crude oil and condensate

Onshore US

(Mboe)

5,389

6,654

5,615

4,636

4,863

9,499

10,675

Conventional

(Mboe)

13,601

13,380

13,256

12,466

12,618

25,084

26,805

 

 

 

 

 

 

 

Total

(Mboe)

18,990

20,034

18,871

17,102

17,481

34,583

37,480

 

 

 

 

 

 

 

NGL

Onshore US

(Mboe)

2,754

2,785

2,886

2,443

2,560

5,003

5,756

Conventional

(Mboe)

2,167

1,989

2,356

2,624

2,251

4,875

4,922

 

 

 

 

 

 

 

Total

(Mboe)

4,921

4,774

5,242

5,067

4,811

9,878

10,678

 

 

 

 

 

 

 

Natural gas

Onshore US

(bcf)

67.8

66.1

67.2

61.4

60.5

121.9

141.7

Conventional

(bcf)

97.1

88.4

99.5

107.3

96.1

203.4

204.9

 

 

 

 

 

 

 

Total

(bcf)

164.9

154.5

166.7

168.7

156.6

325.3

346.6

 

 

 

 

 

 

 

Total petroleum products

Onshore US

(Mboe)

19,443

20,456

19,701

17,312

17,506

34,819

40,048

Conventional

(Mboe)

31,951

30,102

32,195

32,973

30,886

63,859

65,877

 

 

 

 

 

 

 

Total

(Mboe)

51,394

50,558

51,896

50,286

48,392

98,678

105,925

 

 

 

 

 

 

 

 

(1) Total boe conversions are based on 6 bcf of natural gas equals 1 MMboe. Negative production figures represent finalisation adjustments.

(2) Other Australia includes Minerva and Macedon.

(3) Gulf of Mexico volumes are net of royalties.

(4) Onshore US volumes are net of mineral holder royalties.

(5) Other Americas includes Neptune, Genesis and Overriding Royalty Interest.

 

 

16

Production and sales report

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Copper

Metals production is payable metal unless otherwise stated.

Escondida, Chile (1)

Material mined

(kt)

90,863

26,045

93,389

104,867

101,371

206,238

197,367

Sulphide ore milled

(kt)

19,866

8,054

18,777

24,080

30,260

54,340

40,653

Average copper grade

(%)

1.02%

1.01%

1.07%

1.06%

0.98%

1.02%

0.94%

Production ex mill

(kt)

168.6

68.7

167.0

204.2

245.7

449.9

321.8

Production

Payable copper

(kt)

162.6

67.6

162.4

196.3

238.5

434.8

309.6

Copper cathode (EW)

(kt)

71.5

27.2

62.8

71.9

76.1

148.0

142.0

- Oxide leach

(kt)

24.4

8.9

20.3

22.4

27.4

49.8

51.2

- Sulphide leach

(kt)

47.1

18.3

42.5

49.5

48.7

98.2

90.8

 

 

 

 

 

 

 

Total copper

(kt)

234.1

94.8

225.2

268.2

314.6

582.8

451.6

 

 

 

 

 

 

 

Payable gold concentrate

(troy oz)

37,784

11,572

33,941

50,525

50,279

100,804

65,345

Payable silver concentrate

(troy koz)

1,323

540

1,234

1,737

2,193

3,930

2,552

Sales

Payable copper

(kt)

172.7

63.7

163.3

195.1

236.7

431.8

307.6

Copper cathode (EW)

(kt)

71.8

39.4

56.0

61.6

84.1

145.7

137.4

Payable gold concentrate

(troy oz)

37,784

11,572

33,941

50,525

50,278

100,803

65,345

Payable silver concentrate

(troy koz)

1,323

540

1,234

1,737

2,193

3,930

2,552

 

(1) Shown on a 100% basis. BHP interest in saleable production is 57.5%.

 

Pampa Norte, Chile

Cerro Colorado

Material mined

(kt)

14,286

15,178

15,760

21,381

20,191

41,572

27,297

Ore milled

(kt)

3,342

4,179

4,411

3,951

4,611

8,562

6,583

Average copper grade

(%)

0.65%

0.57%

0.53%

0.62%

0.59%

0.60%

0.66%

Production

Copper cathode (EW)

(kt)

12.1

16.7

18.8

13.3

17.4

30.7

29.2

Sales

Copper cathode (EW)

(kt)

13.7

15.6

19.8

12.3

17.7

30.0

30.1

Spence

Material mined

(kt)

22,635

22,939

24,230

22,314

23,457

45,771

46,273

Ore milled

(kt)

5,187

5,225

4,968

5,375

4,919

10,294

9,900

Average copper grade

(%)

1.19%

1.09%

1.13%

1.21%

0.95%

1.09%

1.18%

Production

Copper cathode (EW)

(kt)

41.7

49.4

53.5

44.7

51.0

95.7

86.7

Sales

Copper cathode (EW)

(kt)

41.5

49.0

55.7

43.0

52.2

95.2

82.7

 

17

Production and sales report

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Copper (continued)

Metals production is payable metal unless otherwise stated.

Antamina, Peru

Material mined (100%)

(kt)

61,355

55,771

62,254

59,216

59,125

118,341

126,466

Sulphide ore milled (100%)

(kt)

13,399

11,955

13,229

12,822

13,098

25,920

26,921

Average head grades

- Copper

(%)

0.84%

0.88%

1.00%

0.94%

0.89%

0.91%

0.84%

- Zinc

(%)

0.83%

0.84%

0.95%

0.99%

0.93%

0.96%

0.71%

Production

Payable copper

(kt)

32.0

29.2

38.5

35.9

33.8

69.7

66.1

Payable zinc

(t)

22,406

20,653

29,076

29,201

29,054

58,255

37,773

Payable silver

(troy koz)

1,446

1,301

1,691

1,596

1,331

2,927

2,791

Payable lead

(t)

1,220

1,308

1,799

1,415

1,009

2,424

2,366

Payable molybdenum

(t)

225

30

328

402

579

981

786

Sales

Payable copper

(kt)

33.0

30.2

36.9

31.9

37.0

68.9

65.8

Payable zinc

(t)

22,334

23,669

27,936

25,224

30,340

55,564

38,377

Payable silver

(troy koz)

1,388

1,304

1,513

1,475

1,470

2,945

2,665

Payable lead

(t)

1,100

1,475

1,493

1,624

972

2,596

1,867

Payable molybdenum

(t)

476

-

-

168

693

861

1,124

Olympic Dam, Australia

Material mined (1)

(kt)

1,887

1,943

1,974

1,851

1,391

3,242

4,091

Ore milled

(kt)

2,116

2,112

2,097

2,302

554

2,856

4,395

Average copper grade

(%)

2.00%

2.07%

2.30%

2.10%

2.22%

2.12%

1.98%

Average uranium grade

(kg/t)

0.68

0.61

0.58

0.55

0.58

0.56

0.64

Production

Copper cathode (ER and EW)

(kt)

37.2

36.8

51.4

42.0

12.2

54.2

78.1

Uranium oxide concentrate

(t)

1,060

948

737

880

243

1,123

1,976

Refined gold

(troy oz)

29,651

21,941

28,188

13,101

15,969

29,070

54,017

Refined silver

(troy koz)

188

174

243

131

135

266

351

Sales

Copper cathode (ER and EW)

(kt)

41.2

33.5

51.5

31.6

24.3

55.9

78.7

Uranium oxide concentrate

(t)

883

839

1,298

680

338

1,018

1,968

Refined gold

(troy oz)

28,234

22,333

24,726

22,435

17,999

40,434

50,135

Refined silver

(troy koz)

203

108

251

219

118

337

387

 

(1) Material mined refers to run of mine ore mined and hoisted.

 

 

 

 

 

 

 

 

18

Production and sales report

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Iron Ore

Iron ore production and sales are reported on a wet tonnes basis.

Pilbara, Australia

Production

Newman

(kt)

17,751

16,283

16,241

13,842

18,317

32,159

35,759

Area C Joint Venture

(kt)

12,179

11,165

13,016

13,099

13,575

26,674

24,563

Yandi Joint Venture

(kt)

17,555

14,656

17,415

14,559

16,348

30,907

33,284

Jimblebar (1)

(kt)

5,178

4,824

5,891

6,283

4,583

10,866

11,235

Wheelarra

(kt)

7,386

6,647

7,578

7,804

8,734

16,538

12,795

 

 

 

 

 

 

 

Total production

(kt)

60,049

53,575

60,141

55,587

61,557

117,144

117,636

 

 

 

 

 

 

 

Total production (100%)

(kt)

69,730

62,177

69,714

64,287

71,611

135,898

136,411

 

 

 

 

 

 

 

Sales

Lump

(kt)

14,127

12,804

15,104

13,896

15,145

29,041

28,283

Fines

(kt)

45,447

41,043

46,249

40,733

45,769

86,502

87,725

 

 

 

 

 

 

 

Total

(kt)

59,574

53,847

61,353

54,629

60,914

115,543

116,008

 

 

 

 

 

 

 

Total sales (100%)

(kt)

69,196

62,513

71,149

63,322

70,733

134,055

134,564

 

 

 

 

 

 

 

 

(1) Shown on a 100% basis. BHP interest in saleable production is 85%.

 

Samarco, Brazil (1)

Production

(kt)

-

-

-

-

-

-

-

Sales

(kt)

-

35

-

-

14

14

12

 

(1) Mining and processing operations remain suspended following the failure of the Fundão tailings dam and Santarém water dam on 5 November 2015.

 

 

 

19

Production and sales report

 

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Coal

Coal production is reported on the basis of saleable product.

Queensland Coal

Production (1)

BMA

Blackwater

(kt)

1,855

1,694

1,766

1,985

1,470

3,455

3,836

Goonyella

(kt)

2,204

1,871

1,157

1,639

1,369

3,008

4,327

Peak Downs

(kt)

1,715

1,582

1,238

1,602

1,367

2,969

3,235

Saraji

(kt)

1,307

1,276

913

1,414

1,198

2,612

2,545

Daunia

(kt)

680

674

560

662

718

1,380

1,326

Caval Ridge

(kt)

923

899

760

994

1,272

2,266

1,799

 

 

 

 

 

 

 

Total BMA

(kt)

8,684

7,996

6,394

8,296

7,394

15,690

17,068

 

 

 

 

 

 

 

BHP Mitsui Coal (2)

South Walker Creek

(kt)

1,080

1,354

1,348

1,400

1,524

2,924

2,421

Poitrel

(kt)

849

784

752

871

767

1,638

1,653

 

 

 

 

 

 

 

Total BHP Mitsui Coal

(kt)

1,929

2,138

2,100

2,271

2,291

4,562

4,074

 

 

 

 

 

 

 

Total Queensland Coal

(kt)

10,613

10,134

8,494

10,567

9,685

20,252

21,142

 

 

 

 

 

 

 

Sales

Coking coal

(kt)

7,658

7,133

5,496

7,934

6,341

14,275

14,898

Weak coking coal

(kt)

2,659

2,761

2,502

3,150

2,816

5,966

5,458

Thermal coal

(kt)

154

96

142

102

173

275

360

 

 

 

 

 

 

 

Total

(kt)

10,471

9,990

8,140

11,186

9,330

20,516

20,716

 

 

 

 

 

 

 

 

 

(1) Production figures include some thermal coal.

(2) Shown on a 100% basis. BHP interest in saleable production is 80%.

 

Haju, Indonesia (1)

Production

(kt)

27

-

-

-

-

-

129

Sales - export

(kt)

-

-

-

-

-

-

-

 

(1) Shown on 100% basis. BHP interest in saleable production is 75%. BHP completed the sale of IndoMet Coal on 14 October 2016.

 

New Mexico, USA

Production

Navajo Coal (1)

(kt)

-

-

-

-

-

-

451

 

 

 

 

 

 

 

Total

(kt)

-

-

-

-

-

-

451

 

 

 

 

 

 

 

Sales thermal coal - local utility

-

-

-

-

-

-

105

 

(1) The divestment of Navajo Coal was completed on 29 July 2016, with no further production reported by BHP. Management of Navajo Coal was transferred to Navajo Transitional Energy Company on 31 December 2016.

 

20

NSW Energy Coal, Australia

Production

(kt)

3,851

4,662

5,711

4,235

4,383

8,618

7,803

Sales

Export thermal coal

(kt)

3,539

4,407

4,913

3,622

4,048

7,670

7,179

Inland thermal coal

(kt)

311

431

327

405

411

816

642

 

 

 

 

 

 

 

Total

(kt)

3,850

4,838

5,240

4,027

4,459

8,486

7,821

 

 

 

 

 

 

 

Cerrejón, Colombia

Production

(kt)

2,800

2,756

2,475

2,497

2,914

5,411

5,728

Sales thermal coal - export

(kt)

2,722

2,613

2,803

2,518

2,619

5,137

5,627

 

Production and sales report

Quarter ended

 

Year to date

 

Dec2016

 

Mar2017

 

Jun2017

 

Sep2017

 

Dec2017

 

Dec2017

 

Dec2016

 

Other

Nickel production is reported on the basis of saleable product

Nickel West, Australia

Production

Nickel contained in concentrate

(kt)

0.2

0.2

-

-

-

-

0.5

Nickel contained in finished matte

(kt)

4.1

2.3

5.3

6.8

4.6

11.4

5.9

Nickel metal

(kt)

17.8

16.5

19.9

16.0

17.8

33.8

34.5

 

 

 

 

 

 

 

Total nickel production

(kt)

22.1

19.0

25.2

22.8

22.4

45.2

40.9

 

 

 

 

 

 

 

Sales

Nickel contained in concentrate

(kt)

0.2

0.2

-

-

-

-

0.5

Nickel contained in finished matte

(kt)

4.1

2.2

4.9

4.6

6.4

11.0

5.9

Nickel metal

(kt)

17.6

17.1

18.1

16.6

17.9

34.5

34.1

 

 

 

 

 

 

 

Total nickel sales

(kt)

21.9

19.5

23.0

21.2

24.3

45.5

40.5

 

 

 

 

 

 

 

 

21

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFKODDDBKBPDD
Date   Source Headline
29th Apr 20243:49 pmRNSForm 8.5 (EPT/NON-RI)-Replacement of BHP Group
29th Apr 20243:30 pmRNSForm 8.3 - BHP Group Ltd
29th Apr 20243:30 pmRNSForm 8.3 - BHP Group Limited
29th Apr 20243:29 pmRNSForm 8.3 - BHP Group Limited
29th Apr 20243:25 pmRNSForm 8.3 - BHP Group Limited
29th Apr 20243:12 pmRNSForm 8.3 - Replacement BHP Group Limited
29th Apr 20243:08 pmRNSForm 8.3 - BHP Group Limited
29th Apr 20242:53 pmRNSForm 8.3 - BHP Group Limited
29th Apr 20242:51 pmPRNForm 8.3 - BHP Group Limited
29th Apr 20242:49 pmRNSForm 8.3 - Anglo American plc
29th Apr 20242:45 pmRNSForm 8.3 - BHP Group Limited
29th Apr 20242:40 pmRNSForm 8.3 - BHP Group Limited
29th Apr 20241:35 pmEQSForm 8.3 - The Vanguard Group, Inc.: BHP Group Limited
29th Apr 20241:26 pmRNSForm 8.3 - [BHP Group Ltd]
29th Apr 20241:13 pmRNSResponse to speculation re Samarco settlement
29th Apr 202412:51 pmRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
29th Apr 202412:44 pmRNSForm 8.5 (EPT/NON-RI)-BHP Group Limited
29th Apr 202412:44 pmRNSForm 8.5 (EPT/RI) - BHP Group LimitedAU
29th Apr 202412:39 pmRNSForm 8.5 (EPT/RI) - BHP Group - Replacement
29th Apr 202412:36 pmGNWInvesco Ltd: Form 8.3 - BHP Group Ltd.
29th Apr 202412:36 pmRNSForm 8.5 (EPT/NON-RI)-BHP Group Limited
29th Apr 202412:33 pmRNSForm 8.3 - BHP GROUP LTD
29th Apr 202412:29 pmRNSForm 8.3 - ANGLO AMERICAN PLC
29th Apr 202412:12 pmRNSForm 8.5 (EPT/RI)-BHP Group Limited
29th Apr 202412:11 pmRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
29th Apr 202412:11 pmRNSForm 8.5 (EPT/RI)-BHP Group Limited
29th Apr 202412:07 pmRNSForm 8.5 (EPT/NON-RI)-BHP Group Limited
29th Apr 202412:02 pmRNSForm 8 (DD) - BHP Group Limited
29th Apr 202412:00 pmRNSForm 8.5 (EPT/RI) - BHP Group Limited
29th Apr 202411:42 amRNSForm 8 (DD) - BHP
29th Apr 202411:38 amRNSForm 8.5 (EPT/NON-RI) - BHP
29th Apr 202411:29 amRNSForm 8.5 (EPT/RI) - BHP plc
29th Apr 202411:28 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Ltd
29th Apr 202411:10 amRNSForm 8.5 (EPT/NON-RI) - BHP Group Limited
29th Apr 202410:49 amRNSForm 8.3 - BHP Group Limited
29th Apr 202410:34 amRNSForm 8.5 (EPT/NON-RI)
29th Apr 202410:22 amRNSForm 8.5 (EPT/RI)
26th Apr 20243:20 pmRNSForm 8.3 - BHP Group Limited
26th Apr 20243:04 pmGNWInvesco Ltd: form 8.3 - BHP group Limited_OPD
26th Apr 20243:02 pmEQSForm 8.3 - The Vanguard Group, Inc.: BHP Group Limited
26th Apr 20243:01 pmRNSForm 8.3 - BHP Group Limited
26th Apr 20243:00 pmRNSForm 8.3 - BHP Group Limited
26th Apr 20242:54 pmRNSForm 8.3 - BHP Group Limited
26th Apr 20242:41 pmRNSForm 8.3 - BHP GROUP LTD
26th Apr 20242:35 pmRNSForm 8.3 - BHP Group Ltd
26th Apr 20242:34 pmRNSForm 8.3 - Anglo American plc
26th Apr 20242:29 pmRNSRule 2.9 Announcement
26th Apr 20242:06 pmRNSForm 8.3 - ANGLO AMERICAN PLC
26th Apr 20242:02 pmRNSForm 8.5 (EPT/NON-RI)-BHP Group Limited
26th Apr 20241:55 pmRNSForm 8.3 - [BHP Group Ltd]

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.