Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBradda Head Lithium Regulatory News (BHL)

If you are a professional, HNW or sophisticated investor and want to learn more about the current funding round for Peloton Minerals, please email kat.perez@focusir.com.

Share Price Information for Bradda Head Lithium (BHL)

Share Price is delayed by 15 minutes
Get Live Data
2.85    -0.15 (-5.00%)
Bid:
2.60
Ask:
3.10
Spread: 0.50 (19.231%)
Market Cap: £11.13m
BHL Live PriceLast checked at - London Stock Exchange

Intraday Bradda Head Lithium Share Chart

San Domingo Update

8 Aug 2022 07:00

RNS Number : 1709V
Bradda Head Lithium Ltd
08 August 2022
 

08 August 2022

Bradda Head Lithium Ltd

("Bradda Head", "BHL", "Bradda", or the "Company")

 190% increase in Mapped Area of Pegmatites and 75% Increase in Claims Staked at Bradda Head's San Domingo Property

 

Bradda Head Lithium Ltd (AIM:BHL, OTCQB:BHLIF), the North America-focused lithium development group, is pleased to release initial results from its recent 3D remote mapping exercise. The exercise was undertaken by SRK Consulting (UK) Limited ("SRK"), the highly regarded independent geological consultants, at the Company's San Domingo lithium pegmatite project in Arizona. Bradda Head have increased their landholding by adding approximately 75% or 10km2 of claims and leases around San Domingo, a historic lithium mining district in Arizona.

 

Highlights:

· SRK's 3D remote mapping programme using high-resolution aerial imagery has identified a 190% increase in the area of likely pegmatite outcrops, originally covering 75 acres and now covering 220 acres identified on Bradda's San Domingo claims in its historic lithium mining district in Arizona. Field verification of SRK's remote mapping is required to confirm the presence of pegmatites and to characterise their mineralogy and lithium hosting potential.

· Numerous new pegmatites have been identified in all San Domingo claim blocks, with 1,490 inferred outcrops occurring within BHL's existing claim areas. Individual pegmatites with thicknesses over 1 m have been mapped; whilst the majority may be small and discontinuous, some appear to be more substantial presenting priority targets for follow up work.

· The presence of increased numbers of pegmatite outcrops is significant, given that lithium in spodumene has been found at some pegmatites in our claim blocks at San Domingo. Grab sample grades of up to 8% Li2O have been found demonstrating the presence of spodumene.

· Sub-surface orientations of some pegmatites are discernible from 3D outcrop geometries and Bradda now has a greater understanding and definition of pegmatite surface boundaries and the likely extent of the pegmatite field, aiding our current drill programme focus (rig mobilised in July see press release dated 18th July) and future programmes. The results can be seen on the Company's website at https://www.braddaheadltd.com/media/image-library/.

· Bradda Head has also added approximately 10km2 of claims and leases adjacent to San Domingo following the positive results from the mapping project and exploration work to date at San Domingo. This now takes the San Domingo Project landholding to c.23km2 (see map of total claim package https://www.braddaheadltd.com/media/image-library/))

· Bradda's geological team anticipate that the Company's pegmatite district may have larger structures at depth, based on all work undertaken to date including; surface sampling, channel sampling, geophysics, remote sensing and 3D modelling by Bradda and SRK geologists.

· Multiple pegmatite clusters that together occupy a northeast-trending zone have been identified. The inferred contacts of Cretaceous Granite and Tertiary volcanic rock units have been better defined using regional mapping and aerial imagery. These units appear to limit the extent of pegmatites, which are hosted by Proterozoic rocks. (see map at https://www.braddaheadltd.com/media/image-library/)

· Historically mapped Li-bearing zones at the North Morning Star and Midnight Owl prospects have been located in 3D and used to inform modelling and corroborate mapping.

· A follow-up field observation, soil sampling, and channel sampling programme is now underway across the full 23km2 San Domingo Project landholding.

 

Charles FitzRoy, CEO of Bradda Head, commented:

"We are delighted to be working with SRK on our San Domingo Li in Pegmatite Project. The 3D mapping project undertaken at San Domingo, has helped in the design our drill programme and the greater understanding of our pegmatites extent at surface and depth.

"Our San Domingo pegmatite district is extensive, having been historically mined for lithium in spodumene in the 1940s and 1950s, within our permitted license area. Historical records show that the average reported grade of the Spodumene mined during this period was 740t at 2.75% Li20! Our claims now cover c.23kms2. The additional 10km2 of claims and leases strengthens Bradda's position in the district dramatically. The recent mapping programme was vital in helping us understand where to add additional claims at San Domingo.

"Further surface fieldwork has added to our knowledge and strengthened our theory of the geological structures at depth at our San Domingo claims. This 3D mapping project combined with all fieldwork to date at San Domingo has helped in drillhole targeting and orientation, the planned drill programme will enable us to glean the potential size of deposit more accurately at San Domingo if drilling proves positive.

 "As most people are aware Arizona is known as the Copper State in the USA so it no surprise to note that our claim area also contains historical gold, silver, copper, and vanadium mining operations which naturally are of interest to us."

Details

Following on from SRK's remote mapping and Bradda's geological fieldwork, the Company decided to increase the number of exploration holes it will drill at its two San Domingo lithium pegmatite claims in Central Arizona. At Central San Domingo 10 holes will be drilled (recently increased from 6 due to further mapping) and at Northern San Domingo a 20 hole programme was added, thereby bringing the programme to approximately 7,000 meters in total. The decision was made following 3D remote mapping of the Company's whole San Domingo claims. Both drilling programmes are designed to test the mineralogy of Bradda Head's pegmatite district and the geometry of pegmatites at depth, and to test the thesis held by the Company's geological team that Bradda Head's pegmatite district has larger structures at depth, similar to other zoned pegmatite systems like Liontown Resources' Kathleen Valley project in Australia.

An extensive soil sampling and channel sampling programme is underway across the whole 23km2 claim area, which will help with future drill hole targeting.

Other mineralisation types exist at Bradda's historic pegmatite mining district, including previous copper, gold, silver, and vanadium mines. Bradda is focussing on the lithium prospects currently, but plans to fully evaluate these other minerals once this first phase of drilling is complete.

 

Previous surface sampling at named outcropping pegmatites in the San Domingo claim blocks returned individual sample grade highlights of:

Midnight Owl: 1.44% Li2O

Joker: 0.35% Li2O

White Ridge: 2.49% Li2O

Lower Jumbo: 1.62% Li2O

Sunrise: 0.67% Li2O

North Morning Star: 0.92% Li2O

 

For further information please visit the Company's website: www.braddaheadltd.com

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014, as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

Contact:

Bradda Head Lithium Limited

+44 (0) 1624 639 396

Charlie FitzRoy, CEO

Denham Eke, Finance Director

Beaumont Cornish (Nomad)

James Biddle/Roland Cornish

+44 20 7220 1666

Peterhouse (Joint Broker)

+44 207 469 0930

Charles Goodfellow

Duncan Vasey

Lucy Williams

Shard Capital (Joint Broker)

+44 207 186 9927

Damon Heath

Isabella Pierre

Red Cloud (North American Broker)

+1 416 803 3562

Joe Fars

Tavistock (PR)

+ 44 20 7920 3150

Nick Elwes

Adam Baynes

braddahead@tavistock.co.uk

 

 

 

Qualified Person BHL

The information in this announcement has been reviewed by Jim Guilinger, COO Bradda Head Lithium. Mr. Guilinger is a graduate of the University of Colorado - Boulder with a BA in Geology with more than 40 years' experience in mineral exploration and mining geology and is a qualified person under the AIM Rules. Mr. Guilinger consents to the inclusion of the technical information in this release and context in which they appear. 

 

Notes to Editors

Bradda Head Lithium Ltd. is a North America-focused lithium development group. The Company currently has interests in a variety of projects, the most advanced of which are in Central and Western Arizona: The Basin Project (Basin East Project, and the Basin West Project) and the Wikieup Project.

The Basin East Project has an Indicated Mineral Resource of 17.6Mt at an average grade of 912ppm Li and 3.4%K for a total of 86kt LCE and an Inferred Mineral Resource of 57.6Mt at an average grade of 717ppm Li and 3.3%K for a total of 220kt LCE. In the rest of the Basin Project SRK has estimated an Exploration Target of between 300 and 1,300Mt of material grading between 600 and 850ppm Li which is equivalent to a range of between 1 and 6Mt LCE.

The Group intends to continue to develop its three phase one projects in Arizona, whilst endeavouring to unlock value at its other prospective pegmatite and brine assets in Arizona, Nevada, and Pennsylvania.

All of Bradda Head's licences are held on a 100% equity basis and are in close proximity to the required infrastructure.

Bradda Head is quoted on the AIM of the London Stock Exchange with the ticker of BHL and on the US OTCQB market with a ticker of BHLIF.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCZZGGRGNVGZZZ
Date   Source Headline
9th Jun 20267:00 amRNS-RAttendance at 121 Mining Investment New York 2026
8th Jun 20267:00 amRNS-RBradda Joins Defense Industrial Base Consortium
26th May 20268:51 amRNSSecures Key Drilling Permit for Whistlejacket
21st May 20267:00 amRNSSRK's PEG Tool Enhances Lithium Targeting
19th May 20264:03 pmRNSHolding(s) in Company
12th May 20266:13 pmRNSBradda Head Signs MOU with Tyfast Energy
12th May 202611:42 amRNSBradda Head Signs MOU with Tyson Energy
16th Apr 20267:00 amRNS-RInvestor Presentation
7th Apr 20267:00 amRNSWhistlejacket: Review of Previous Results
17th Feb 20265:56 pmRNSResults of General Meeting
2nd Feb 20267:00 amRNS-RInvestor Presentation
30th Jan 20263:28 pmRNSPosting of Circular and Notice of General Meeting
27th Jan 20267:00 amRNSJoint Venture Agreement for Whistlejacket Project
14th Jan 20265:38 pmRNSNotification of Major Holdings
14th Jan 20263:06 pmRNSNotification of Major Holdings
30th Dec 20256:05 pmRNSResult of AGM
30th Dec 20256:05 pmRNSResult of AGM
9th Dec 20257:00 amRNSNotice of AGM
19th Nov 20257:00 amRNSUnaudited Interim Results
11th Nov 20255:54 pmRNSAdjournment of Annual General Meeting
3rd Nov 20257:00 amRNSResignation of Broker
25th Sep 20257:00 amRNSLoan Facility Agreement
8th Sep 20257:00 amRNSNotice of 2025 Annual General Meeting
31st Jul 20253:39 pmRNSAudited Final Results For Year Ended 28 Feb 2025
19th May 20257:00 amRNS-RSEG Publication of Geological Research Paper
8th Apr 20257:00 amRNSDrill Permits Received for San Domingo Targets
4th Apr 20257:00 amRNSRepricing and Extension of Share Options
1st Apr 20257:00 amRNSSan Domingo Mineralogical Ore Sorting Study
27th Mar 20257:00 amRNS-RBHL Welcomes US Presidential Executive Order
26th Mar 20257:00 amRNS-RParticipation at Master Investor Show, London
25th Feb 20257:00 amRNS-RParticipation in PDAC Convention in Toronto
22nd Jan 20257:00 amRNSExecutive Chair's Statement
16th Dec 20247:00 amRNSSan Domingo Pegmatite Project update
26th Nov 20247:00 amRNSSan Domingo Pegmatite Project update
19th Nov 20245:41 pmRNSResult of AGM
19th Nov 20247:00 amRNSUnaudited Interim Results
30th Oct 20247:00 amRNSMetallurgical Scoping Study at San Domingo
14th Oct 20247:00 amRNSCancellation of Re-priced Options & TSXV Delisting
1st Oct 20247:00 amRNSSan Domingo Channel Sample Results
12th Sep 20242:48 pmRNSNotice of 2024 Annual General Meeting
3rd Sep 20247:00 amRNSChannel Sample Results at San Domingo Project
14th Aug 20247:00 amRNSBasin East MRE Uploaded to SEDARplus
24th Jul 20247:00 amRNSUnaudited Results for 3 months ended 31 May 2024
1st Jul 20247:00 amRNSUpdated Mineral Resource Expansion Basin Project
27th Jun 20247:00 amRNSAudited Final Results for year ending 29 Feb 2024
27th Jun 20247:00 amRNSMD&A for the three and 12 months ended 29 Feb 2024
14th Jun 20247:00 amRNSDrilling Results for Basin Lithium-in-Clay Project
28th May 20247:00 amRNSBradda Head to participate in Red Cloud webinar
22nd May 20247:00 amRNSDrilling Completed at Basin and San Domingo Update
20th May 20247:00 amRNSSettlement Agreement over Fraudulent payment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.