Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
8.00    0.00 (0.00%)
Bid:
7.00
Ask:
9.00
Spread: 2.00 (28.571%)
Market Cap: £5.18m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Preliminary Roadmap for the GAMP development

26 Sep 2023 07:00

RNS Number : 5859N
Beowulf Mining PLC
26 September 2023
 

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulation ("MAR") (EU) No. 596/2014, as incorporated into UK law by the European Union (Withdrawal) Act 2018. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

 

26 September 2023

Beowulf Mining Plc

 

("Beowulf" or the "Company")

 

Preliminary Roadmap for the development of the Graphite Anode Materials Plant in the GigaVaasa area

 

Beowulf (AIM: BEM; Spotlight: BEO), and its wholly owned Finnish subsidiary Grafintec Oy ("Grafintec"), are pleased to provide an update on the development plans for the Graphite Anode Materials Plant ("GAMP") in the GigaVaasa area.

 

 

Highlights

 

· Following the positive preliminary economics with a post-tax NPV8 of US$242 million and a post-tax IRR of 39%, the Company is advancing parallel environmental and technical workstreams for the development of the GAMP.

· The Environmental Impact Assessment ("EIA") is underway and is expected to be completed in Q1 2024.

· Following completion and submission of the EIA, the Company will initiate work on the Environmental Permit process.

· Following the conclusion of the Pre-Feasibility Study ("PFS") technical work, bench-scale test work is scheduled to begin in October. This will be followed by pilot-scale test work that will be critical for optimising the process design and producing material that can be tested by future battery manufacturers.

· It is currently anticipated that the Definitive Feasibility Study ("DFS") will begin in mid-2024.

· The development of the GAMP is further supported by the recently approved European Union Critical Raw Materials Act ("CRM Act"). The CRM Act, which includes graphite as a Critical Raw Material, sets the target of at least 10% of the EU's annual consumption to be obtained from EU extraction and at least 40% of the EU's annual consumption to be obtained from processing within the EU.

 

 

Rasmus Blomqvist, Managing Director of Grafintec, commented:

 

"I am very pleased to be able to set out the development plan for the GAMP project. The next critical phases are the completion of the EIA and further test work, initially at bench-scale but subsequently at pilot-scale. These phases will be followed by the Environmental Permitting process and the launch of the DFS later in 2024."

 

 

Ed Bowie, Chief Executive Officer of Beowulf, commented:

 

"With the backdrop of the EU's CRM Act, the timing could not be better to be developing our graphite business in Finland. We have some very clear deadlines and deliverables that the team and I will be working hard to meet.

 

"We look forward updating the market on our progress over the coming months."

 

 

Preliminary Roadmap

 

The development plan for the GAMP is focused on two primary workstreams, Environmental and Technical. These workstreams require synchronisation, with outcomes from each needing to be incorporated in the other.

 

The Environmental workstream comprises the following:

· Grafintec has appointed Finnish Engineering Consultancy AFRY Finland Oy ("AFRY") to undertake the EIA, which is aimed to be completed in Q1 2024.

· Following its submission, the local authority, the Centre for Economic Development, Transport and the Environment ("ELY"), will review the EIA before making a statement of their findings. The review process by ELY is anticipated to take approximately three months.

· Following completion and submission of the EIA, work will commence towards the Environmental Permit. The Environmental Permit application, which will take approximately six months to compile, is then submitted to the Regional State Administrative Agency ("AVI").

· The processing of the Environmental Permit is expected to take approximately one year, with the final decision anticipated towards the end of 2025.

 

The Technical workstream comprises the following:

· With the PFS technical work complete and the preliminary economics released, the project is advancing with bench-scale test work commencing in October, which is to be followed by pilot-scale test work.

· On the conclusion of the first phase of pilot-scale test work in the first half of 2024, the Definitive Feasibility Study ("DFS") will be launched.

· The DFS is expected to take six to nine months to complete and, during this period, pilot-scale test work will continue, generating sufficient product for battery manufacturers to complete pre-qualification testing.

 

With the successful conclusion of the Environmental and Technical workstreams listed above, the GAMP project will enter Front-End Engineering Design ("FEED"), financing and ultimately construction phases with first production targeted for 2027.

 

 

CRM Act

 

The European Parliament voted on 7 September 2023, in favour of the Critical Raw Materials Act ("CRM Act"). The CRM Act aims to ensure that the EU has access to a secure and sustainable supply of critical raw materials, enabling Europe to meet its 2030 climate and digital objectives. 

 

The CRM Act sets benchmarks along the strategic raw-materials value-chain (including natural graphite) and for the diversification of the EU supplies which is currently heavily controlled by only few countries, including, for example, China in the graphite anode materials supply chain.

 

The CRM Act set targets to be met by 2030 for:

· at least 10% of the EU's annual consumption to be derived from EU extraction;

· at least 40% of the EU's annual consumption to be derived from EU processing;

· at least 15% of the EU's annual consumption to be derived from EU recycling; and

· no more than 65% of the EU's annual consumption from a single third country

 

The CRM Act aims to reduce the administrative burden and streamlining permitting procedures for critical raw materials projects while ensuring a high social and environmental protection standard. The selected strategic projects will benefit from support for access to finance and shorter permitting procedures. See https://single-market-economy.ec.europa.eu/sectors/raw-materials/areas-specific-interest/critical-raw-materials/critical-raw-materials-act_en for further information.

 

With the current lack of commercial scale graphite anode materials production within the EU, Grafintec's GAMP development in the GigaVaasa area is believed to fulfil the requirements for classification as a strategic project. Grafintec is assessing the procedure for the GAMP to be selected as a strategic project. Classification as a strategic project would enable the GAMP to take advantage of access to support for financing and streamlined permitting procedures which will enable the company to meet its goals to be in production by 2027.

 

 

Enquiries:

Beowulf Mining plc

Ed Bowie, CEO

ed.bowie@beowulfmining.com

SP Angel

(Nominated Adviser & Broker)

Ewan Leggat / Stuart Gledhill / Adam Cowl

Tel: +44 (0) 20 3470 0470

BlytheRay

Tim Blythe / Megan Ray 

Tel: +44 (0) 20 7138 3204

 

About Beowulf Mining plc

 

Beowulf Mining is a mining company with main activities in exploration and development in Sweden, Finland and Kosovo. Beowulf's portfolio is diversified by commodity, geography and stage of development of the projects and consists primarily of iron ore, graphite, gold and base metals. Beowulf Mining is headquartered in London, England.

 

 

Cautionary Statement

 

Statements and assumptions made in this document with respect to the Company's current plans, estimates, strategies and beliefs, and other statements that are not historical facts, are forward-looking statements about the future performance of Beowulf. Forward-looking statements include, but are not limited to, those using words such as "may", "might", "seeks", "expects", "anticipates", "estimates", "believes", "projects", "plans", strategy", "forecast" and similar expressions. These statements reflect management's expectations and assumptions in light of currently available information. They are subject to a number of risks and uncertainties, including, but not limited to , (i) changes in the economic, regulatory and political environments in the countries where Beowulf operates; (ii) changes relating to the geological information available in respect of the various projects undertaken; (iii) Beowulf's continued ability to secure enough financing to carry on its operations as a going concern; (iv) the success of its potential joint ventures and alliances, if any; (v) metal prices, particularly as regards iron ore. In the light of the many risks and uncertainties surrounding any mineral project at an early stage of its development, the actual results could differ materially from those presented and forecast in this document. Beowulf assumes no unconditional obligation to immediately update any such statements and/or forecast.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCSESFMIEDSELU
Date   Source Headline
29th May 20121:30 pmRNSUpdate re Kallak Project
16th May 20128:00 amRNSDrilling to recommence at Kallak
4th May 20124:00 pmRNSUpdate re Kallak Project
20th Apr 20127:00 amRNSUpdate re Kallak Project
29th Feb 20127:00 amRNSUnaudited Preliminary Results
20th Jan 20127:00 amRNSAppointment of technical consultant to Kallak
19th Jan 201210:10 amRNSHolding(s) in Company
16th Jan 20127:00 amRNSResult of General Meeting and Operational Update
22nd Dec 20114:30 pmRNSOperational Update
8th Dec 201112:00 pmRNSGrant of Options
8th Dec 20117:00 amRNSNotice of General Meeting and Operational Update
30th Nov 20117:00 amRNS3rd Quarter Results
16th Nov 201110:16 amRNSPlacing Announcement
14th Nov 201111:47 amRNSResponse to Press Speculation
11th Nov 20117:00 amRNSJORC Resource on Kallak
20th Oct 20117:00 amRNSOperational Update
10th Oct 20114:30 pmRNSDirector's Dealings
7th Oct 201110:34 amRNSCorrection - Exercise of Options
7th Oct 20119:03 amRNSExercise of Options
5th Sep 20115:31 pmRNSIssue of Equity
30th Aug 20117:00 amRNSInterim Results
10th Aug 20117:00 amRNSKallak Iron Ore Update
1st Jul 201110:37 amRNSResult of AGM
30th Jun 20119:30 amRNSKallak South Update
22nd Jun 201112:30 pmRNSSubscription for £250,000 Cnv Ln Notes in Agricola
7th Jun 20117:00 amRNSNotice of AGM
31st May 20117:00 amRNS1st Quarter Results
19th May 20118:00 amRNSAppointment of Production Director
9th May 201111:00 amRNSPlacing to raise £1,000,000
21st Apr 20117:00 amRNSKallak Iron Ore Update
22nd Mar 20117:00 amRNSUpdate re Kallak Iron Ire Project
28th Feb 20117:00 amRNSPreliminary Results
3rd Feb 20117:00 amRNSDrilling Report
29th Dec 20107:00 amRNSResult of General Meeting
23rd Dec 20107:00 amRNSKallak Update - Estimated 600m tonnes of ore
7th Dec 20107:00 amRNSNotice of General Meeting
6th Dec 20107:00 amRNS3rd Quarter Results
22nd Nov 20107:00 amRNSKallak Assay Results
25th Oct 20107:00 amRNSDrilling commences at Kallak South
25th Oct 20107:00 amRNSDrilling commences at Kallak South
13th Oct 20104:35 pmRNSHolding(s) in Company
8th Oct 20107:00 amRNSKallak Assay Results
6th Oct 20107:00 amRNSPlacing to raise ?400,000
27th Sep 201010:00 amRNSGrant of options
16th Sep 20107:00 amRNSKallak Drilling Update
27th Aug 20107:00 amRNSInterim Results
12th Jul 20107:00 amRNSKallak Drilling Update
28th Jun 20108:00 amRNSBallek Assay Results
7th Jun 201011:33 amRNSResult of AGM
1st Jun 20107:00 amRNSFirst Quarter Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.