If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBeowulf Mining PLC Regulatory News (BEM)

Share Price Information for Beowulf Mining PLC (BEM)

Share Price is delayed by 15 minutes
Get Live Data
6.25    -0.75 (-10.71%)
Bid:
5.50
Ask:
7.00
Spread: 1.50 (27.273%)
Market Cap: £4.04m
BEM Live PriceLast checked at - London Stock Exchange

Intraday Beowulf Mining PLC Share Chart

Drilling Report

6 Jun 2007 09:43

Beowulf Mining PLC06 June 2007 BEOWULF MINING PLC Press Release Diamond Drill Results from Grundtrask Gold Project LATEST DRILLING AT GRUNDTRASK GOLD PROSPECT, NORTHERN SWEDEN SHOWS GOLD MINERALISATION PRESENT OVER 800 METRES OF STRIKE LENGTH AND OPEN AT BOTH ENDS AND AT DEPTH London: 6 June 2007 Beowulf Mining PLC (AIM:BEM), the AIM-traded mineral exploration company ispleased to announce that analytical results have been received from the latestdiamond drilling programme on the company's 100% owned Grundtrask gold projectin the Skellefte Mining District, N. Sweden. The drill programme tested thesouthern extension where higher gold grades were noted from previous drilling in2005 by Beowulf. During 2006 and early 2007 an additional 10 diamond drill holes were completedon the Grundtrask project. The holes were all targeted on the structure, nowcalled the Southern Gold Structure, that was identified by DDH 05004. Drilling just completed, has outlined a sigmoidal shaped mineralised zoneconsisting of dense sheet-veining over a strike length of greater than 160m withwidths of up to 20 metres. Gold grades of up to 5.2m at 4.28g/t have beenreturned from the Southern Gold Structure and these are summarised in the tablebelow. Geological interpretation of drill core from Grundtrask has demonstrated theexistence of a mineralised corridor in which sigmoidal gold bearing structures,of which the Southern Gold Structure is just one example, occur over a strikelength of in excess of 800m. The three sigmoidal structures that have beeninterpreted to date are believed to be generated by compressional tensiondomain. The mineralised structures are characterised by intense micro-veining of quartz,arsenopyrite and chalcopyrite in a host of silicified intermediate lavas of theVargfors Formation. Conspicuous molybdenite, (the major ore mineral ofmolybdenum), also occurs in veins in some of the drill holes. The gold, isbelieved to be carried in the chalcopyrite. Highlights of the recent drill campaign include 5.2m at 4.28g/t Au from 5.8m and16.9m at 1.86g/t Au from 15.5m in DDH 06002, 18m at 1.77g/t Au from 41m in DDH06005. Details of all drill holes are given in Table 1 below. The drill core sampleshave been assayed for gold by Fire Assay techniques and additional metalelements by ICP at the ALS/Chemex Laboratory in Vancouver. Analysis of thesamples involved analysis of blank, duplicate and random standard referencesamples. Table 1. GRUNDTRASK GOLD DIAMOND DRILL RESULTS Gold Hole No From To Length (m) Grade g/t #04001 53.00 57.62 4.62 2.80 #04002 49.70 50.70 1.00 1.17 #04003 NSI #05001 NSI #05003 NSI #05004 27.85 41.80 13.95 1.94 #06001 16.60 18.50 1.90 2.11 plus 27.90 33.60 5.70 2.53 plus 61.90 62.15 0.25 8.22 #06002 5.80 11.00 5.20 4.28 plus 15.50 32.40 16.90 1.86 #06003 10.10 17.70 7.60 2.43 plus 20.90 24.40 3.50 3.79 plus 26.10 27.80 1.70 3.40 plus 31.30 37.20 5.90 2.47 #06004 65.10 65.30 0.20 4.29 plus 62.60 63.60 1.00 1.11 #06005 41.00 59.00 18.00 1.77 #06006 22.60 24.41 1.81 1.10 #06007 NSI #06008 7.55 8.20 0.65 2.20 plus 18.00 22.00 4.00 1.01 plus 32.00 33.00 1.00 2.10 plus 79.00 85.00 6.00 1.02 #06009 34.00 35.00 1.00 1.16 plus 41.00 44.00 3.00 1.26 plus 51.10 51.46 0.36 1.30 plus 63.00 64.00 1.00 1.22 #06010 NSI NSI = No significant intercept. Commenting on the results Dr. Jan-Ola Larsson, Beowulf's Technical Director,stated that "The drilling has encountered gold bearing sulphide mineralisationat shallow depths starting at 12 metres or less, making the deposit amenable toopen pit mining. The latest results show that this mineralised structure is nowover 800 meters long. The mineralisation is now attracting the interest of several companies who haveexpressed an interest in a joint venture arrangement. Beowulf will continuediamond drilling in 2007 and programme scale depends on the outcome of jointventure discussions." In accordance with AIM Rules, the information in this announcement has beenreviewed and signed off by Dr. Jan Ola Larsson, (Fil. Kand, PhD, DIC). TechnicalDirector of the Company, who has over 30 years relevant experience within thesector. For further information contact:- * Dr. Robert Young, Chairman - Beowulf Mining Plc - Tel: +44 (0)1353 649 701 * Gavin Burnell, Ruegg & Co. Limited - Tel: +44 (0)207 584 3663 * Nick Bealer, King & Shaxson Capital Limited - Tel: +44 (0)207 426 5986 * Charles Dampney - City Capital Securities Ltd - Tel: +44 (0) 207 822 7107 * Gary Middleton, St Swithins PR Ltd - Tel. +44 (0)207 929 4391 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
7th Jun 201011:33 amRNSResult of AGM
1st Jun 20107:00 amRNSFirst Quarter Update
13th May 20104:00 pmRNSAGM Notice Accounts Posted
28th Apr 20107:00 amRNSDrilling to commence at Kallak
13th Apr 20109:00 amRNSBallek JV Partner earns 50% of project
17th Mar 20107:00 amRNSKallak drilling contract signed
15th Mar 20107:00 amRNSPlacing raises ?1m
3rd Mar 20107:00 amRNSConceptual Study completed Kallak Iron Ore Deposit
1st Mar 20107:00 amRNSPreliminary Results
15th Feb 20107:00 amRNSUpdated Conceptual Study On Iron Project
3rd Feb 20107:00 amRNSOperational Update re Ballek JV Project
21st Dec 20097:00 amRNSRuoutevare Test Results
30th Nov 20097:00 amRNS3rd Quarter Results
25th Nov 20097:00 amRNSMolybdenum Exploration Licence Granted
19th Nov 20097:00 amRNSFlotation Test Results
12th Nov 20097:00 amRNSRuoutevare Deposit, Metallurgical Tests Update
15th Oct 20091:47 pmRNSChange of Name of Nominated Adviser
2nd Oct 200912:30 pmRNSHolding(s) in Company
29th Sep 200911:00 amRNSAcquisition of Agricola Res Swedish Assets, New JV
1st Sep 20097:00 amRNSInterim Results
22nd Jul 200912:00 pmRNSResult of AGM
22nd Jul 20097:00 amRNSStudies commence Lulepotten copper-gold deposit
13th Jul 20097:00 amRNSStudy Commissioned on Kallak & Ruoutevare Projects
9th Jul 20097:00 amRNSLetter of Intent signed
3rd Jul 20099:30 amRNSHolding(s) in Company
24th Jun 20092:00 pmRNSPlacing Completed
22nd Jun 20097:00 amRNSMetallurgical Tests Commenced
5th Jun 20094:15 pmRNSNotice of AGM
29th May 20093:07 pmRNSFinal Results
28th Apr 20097:00 amRNSRuoutevare Iron Ore Deposit, Metallurgical Update
2nd Apr 200911:30 amRNSChange of Adviser
5th Mar 200910:30 amPRNBoard Changes
22nd Jan 200910:00 amPRNBallek Joint Venture with Agricola Resources plc
6th Nov 200810:33 amPRNDirectorate Change
28th Oct 20087:50 amPRNJoint Venture Agreement
17th Oct 20089:46 amPRNDirector/PDMR Shareholding
22nd Sep 20089:14 amPRNFurther re Director Appointment
19th Sep 200810:30 amPRNDirector/PDMR Shareholding
16th Sep 20087:00 amPRNResource Update
10th Sep 20087:00 amPRNHalf-yearly Report
5th Sep 20089:05 amPRNHolding(s) in Company
28th Aug 20087:00 amPRNFarm-In Agreement
26th Aug 20089:00 amPRNHolding(s) in Company
22nd Aug 20083:59 pmPRNHolding(s) in Company
19th Aug 20087:00 amPRNJORC Resource at Ruoutevare Project JV
6th Aug 200812:01 pmPRNBeowulf’s shares commence trading on AktieTorget Market
5th Aug 20089:49 amPRNHolding(s) in Company
30th Jul 20088:00 amPRNFarm-In Agreement
9th Jul 20089:16 amPRNFarm-In Agreement
25th Jun 20083:00 pmPRNBallek Joint Venture

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.