Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

Share Price is delayed by 15 minutes
Get Live Data
4.25    0.00 (0.00%)
Bid:
4.00
Ask:
4.50
Spread: 0.50 (12.50%)
Market Cap: £2.79m
AYM Live PriceLast checked at - London Stock Exchange

Intraday Anglesey Mining Share Chart

Preliminary Economic Assessment in progress

1 Oct 2020 07:00

ANGLESEY MINING PLC - Preliminary Economic Assessment in progress

ANGLESEY MINING PLC - Preliminary Economic Assessment in progress

PR Newswire

London, September 30

Anglesey Mining plc

01 October 2020 LSE:AYM

Parys Mountain Preliminary Economic Assessment in progress

Anglesey Mining plc is pleased to report that it has appointed Micon International Limited (“Micon”) to carry out a Preliminary Economic Assessment (“PEA”) on its Parys Mountain copper, zinc, lead, gold and silver project, located on the island of Anglesey in North Wales.

Micon is an experienced minerals industry consultant that has reviewed mining projects across all continents. Micon has long experience with Parys Mountain commencing in 2006 and including preparation of the JORC compliant resource estimate in 2012 and the Scoping Study in 2017. This background will enable Micon to move swiftly and knowledgeably to completion of this important PEA.

The PEA is the next step in the development of Parys Mountain on the road to production and follows from the optimisation studies recently completed by QME Mining Technical Services (“QME”). The QME work highlighted up to 10 million tonnes of potentially mineable material available at Parys Mountain which is significantly larger than the 2.1 million tonnes of indicated resource that was utilised in Micon’s positive 2017 Scoping Study.

QME also identified that it should be possible to utilise a lower cut-off grade for mine planning purposes than used in the Micon 2017 study. QME based this on their review of the expected operating costs at Parys Mountain based on their long and detailed experience in underground mine operations in Ireland and elsewhere.

As a result of the QME work it is expected that the planned production rate of 1,000 tonnes per day utilised in 2017 will be expanded, and that the projected mine life of just 8 years will be significantly extended.

In preparing the PEA, Micon will review all the QME work including capital and operating cost estimates, ore-body modelling and mine production planning. It is intended that Micon will evaluate several separate development scenarios based on the various ore zones available for mining and on differing production rates to best optimise the assets at Parys Mountain. Micon will incorporate the results into detailed production and financial models to produce comprehensive and compliant reports that will be in a form that can be publicly released. It is expected that the PEA will be finalised by the end of November.

Subsequent to completion of the PEA, Anglesey would intend to press on to undertake a Preliminary Feasibility Study to support financing for development of the mine at Parys Mountain.

Anglesey Chief Executive, Bill Hooley, said: "I am very pleased that we are able to announce the appointment of Minco to complete this PEA. The QME optimisation work has given us a sound basis from which to complete the PEA. We are confident that the results from the PEA will confirm our expectation in the extent of the mineral resources at Parys Mountain, and will demonstrate improved outcomes and a longer mine life beyond those indicated previously.”

About Anglesey Mining plcAnglesey is in evaluation work at its 100% owned Parys Mountain copper-zinc-lead deposit in North Wales, UK with a 2012 reported resource of 2.1 million tonnes at 6.9% combined base metals in the indicated category and 4.1 million tonnes at 5.0% combined base metals in the inferred category.Anglesey holds a 10% interest, and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 50.1%. Anglesey also owns 12% of Labrador Iron Mines Holdings Limited which holds direct shipping iron ore deposits in Labrador and Quebec.

Anglesey is also actively reviewing other compatible base metal projects suitable for incorporation into the Anglesey Group.

For further information, please contact: Bill Hooley, Chief Executive +44 (0)7785 572517

Danesh Varma, Finance Director +44 (0)7740 932766

Date   Source Headline
1st Aug 201210:44 amPRNTotal Voting Rights
30th Jul 20127:35 amPRNParys 2012 drilling results
27th Jul 20127:00 amPRNAnnual Financial Report
27th Jul 20127:00 amPRNIssue of new shares and agreement with Intermine
18th Jul 20124:22 pmPRNLIM participates in Multi User Port Facility
9th Jul 20121:04 pmPRNLIM - full-scale operations resume - blockade removed
4th Jul 20127:00 amPRNLIM - update on Schefferville situation
20th Jun 20124:40 pmRNSSecond Price Monitoring Extn
20th Jun 20124:35 pmRNSPrice Monitoring Extension
20th Jun 20121:06 pmPRNLIM reports 2012 year end results
14th Jun 20127:00 amPRNLIM commences exploration programme
11th Jun 20127:00 amPRNHolding(s) in Company
1st Jun 20124:40 pmRNSSecond Price Monitoring Extn
1st Jun 20124:35 pmRNSPrice Monitoring Extension
31st May 20122:09 pmPRNNew resource estimates for LIM iron
22nd May 201212:34 pmPRNLIM first iron ore shipment and sale for 2012
4th May 20124:40 pmRNSSecond Price Monitoring Extn
4th May 20124:35 pmRNSPrice Monitoring Extension
3rd May 20124:40 pmRNSSecond Price Monitoring Extn
3rd May 20124:35 pmRNSPrice Monitoring Extension
2nd May 20124:40 pmRNSSecond Price Monitoring Extn
2nd May 20124:35 pmRNSPrice Monitoring Extension
10th Apr 20123:07 pmPRNLIM starts up 2012 production season at James Mine
2nd Apr 201211:55 amPRNBlocklisting - Interim Review
28th Mar 20124:08 pmPRNProject updates
22nd Mar 20123:09 pmPRNDirector’s shareholdings; total voting rights
20th Mar 20122:47 pmPRNLIM completes C$71.6 million equity financing
15th Mar 20127:00 amPRNHolding(s) in Company
13th Mar 20128:20 amPRNHolding(s) in Company
12th Mar 20124:40 pmRNSSecond Price Monitoring Extn
12th Mar 20124:35 pmRNSPrice Monitoring Extension
2nd Mar 201211:45 amPRNHolding(s) in Company
29th Feb 20123:36 pmPRNLIM equity financing for C$71.6 million
29th Feb 20127:44 amPRNLIM announces equity financing
24th Feb 20122:24 pmPRNHolding(s) in Company
17th Feb 20127:00 amPRNLIM agreement with Uashat Mak Mani-Utenam Innu
15th Feb 201212:29 pmPRNLIM Third Quarter Financial Results and IMS
15th Feb 20127:00 amPRNLIM signs 2012 Iron Ore Sales Agreement with IOC
6th Feb 20127:00 amPRNHolding(s) in Company
20th Jan 201212:49 pmPRNHolding(s) in Company
13th Jan 20122:40 pmPRNLIM preliminary operating results for 2011
11th Jan 20127:00 amPRNDiamond drilling recommences at Parys Mountain
16th Dec 20114:40 pmRNSSecond Price Monitoring Extn
16th Dec 20114:35 pmRNSPrice Monitoring Extension
15th Dec 20114:41 pmRNSSecond Price Monitoring Extn
15th Dec 20114:35 pmRNSPrice Monitoring Extension
2nd Dec 20116:13 pmPRNHolding(s) in Company
2nd Dec 20117:00 amPRNParys exploration underway - project review continues
29th Nov 20117:00 amPRNHalf-yearly Report
18th Nov 20117:00 amPRNLIM Appoints President and COO

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.