Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.40
High: 1.50
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Parys Mountain Project Update

8 Sep 2017 07:00

ANGLESEY MINING PLC - Parys Mountain Project Update

ANGLESEY MINING PLC - Parys Mountain Project Update

PR Newswire

London, September 7

8th September 2017 LSE:AYM

Parys Mountain Project Update

Planning for production in 2020

Anglesey Mining plc (“Anglesey” or the “Company”) is pleased to provide the following update on the Parys Mountain project in North Wales.

On 24th July 2017, Anglesey reported on the Scoping Study completed by Micon International Limited and Fairport Engineering Limited. The financial figures used in the Scoping Study were based on metal prices prevailing at that time. Since July all the metals to be produced at Parys Mountain have increased in price with copper at $3.10/lb compared to $2.50/lb in the Scoping Study, zinc has increased to $1.40/lb compared to $1.25/lb in the Study and lead has moved to $1.09/lb compared to $1.00. There has also been upward movement in both gold and silver. In contrast, the pound has strengthened somewhat against the US dollar and is now trading around $US1.30 to £1.00 compared to $US1.25 in the Study.

The overall impact of these changes would be very positive on the pre-tax NPV and IRR.

The fundamentals underlying the recent increases in these metal prices are well founded and are likely to continue to support upward growth through the next several years.

Anglesey believes that it is now opportune to progress a number of steps to move the Parys Mountain project forward with the expectation that financing can be obtained and the project developed to production as soon as practicable. The major steps to be taken in the short term will include:

Commencement of an Environmental Impact Assessment Conversion of the Scoping Study to a Definitive Feasibility Study Recruitment of key corporate staff Discussions with potential providers of project finance, including investment funds, metal traders, smelters and banks

It is planned to immediately commence all of these steps with the hope that a Definitive Feasibility Study, including an Environmental Impact Assessment, can be completed in the first half of 2018 so that meaningful project financing discussions can take place immediately thereafter. It is the intention of the Company to bring in new personnel into key positions to drive these matters forward and move the project and the Company to a successful long-term future.

The Company has adequate funds to initiate these steps and continue its normal corporate and limited site operations but will need to raise some additional funding to complete these development targets. This will not likely involve significant dilution for current shareholders.

Providing this timetable can be met and discussions on project financing are well advanced by the middle of next year, it would be possible for project construction to commence before the end of 2018 with initial production targeted for the first half of 2020.

Parys Mountain Project

The Parys Mountain Scoping Study base case envisages a mining rate of 1,000 tonnes per day, to produce an average annual output of 12,500 tonnes of zinc concentrate at 57% Zn, 6,400 tonnes of lead concentrate at 52% Pb and 3,500 tonnes of copper concentrate at 25% Cu, annually, over an initial mine life of eight years.

The overall net smelter return (NSR) for the three concentrates, including the silver and gold precious metals contributions, is expected to total more than $270 million at the forecast metal prices used for the base case.

The base case yields a pre-tax net present value of $33.2 million, or £26.6 million, at a conservative 10 per cent discount rate, using metal prices of $1.25 per pound for zinc, $1.00 per pound for lead, $2.50 per pound for copper, $17.50 per ounce for silver and $1,275 per ounce for gold and at an exchange rate of £1.00 = $US1.25. With an estimated pre-production capital cost of $53 million, or £42 million, this results in an indicated internal rate of return (IRR) of 28.3%.

Using longer term metal price projections of $1.35 per pound for zinc and $3.00 per pound for copper the NPV10 would be $43.2 million, or £34.6 million. At an 8% discount rate, used to reflect the relatively low risks of the project given its advanced level of development and low political risk in the UK, the NPV8 would be enhanced to $41 million, or £32.8 million, for the base case metal price scenario and to $53 million, or £42 million, for the higher longer-term metal prices, with an IRR of 33%.

Importantly, the Scoping Study was based on only the 2.1 million tonnes of indicated resources reported by Micon in 2012. Micon had also reported a further 4.1 million tonnes of inferred resources which were not incorporated into the Scoping Study. It is expected that a high proportion of these inferred resources will be converted to indicated probable reserves once exploration drilling from underground takes place. These additional resources would be processed through the same concentrator plant and would significantly increase the projected life of the mine, to perhaps double the projected mine-life to 15 or 18 years, and enhance the NPV. 

About Anglesey Mining plcAnglesey is carrying out development and exploration work at its 100% owned Parys Mountain zinc-copper-lead deposit in North Wales, UK with a reported resource of 2.1 million tonnes at 6.9% combined base metals in the indicated category and 4.1 million tonnes at 5.0% combined base metals in the inferred category.

Anglesey also holds a 6% interest and management rights to the Grangesberg Iron project in Sweden, together with a right of first refusal to increase its interest by a further 51%. Anglesey also holds 11.8% of Labrador Iron Mines Holdings Limited which has direct shipping iron ore deposits in Labrador and Quebec. For further information, please contact: Bill Hooley, Chief Executive +44 (0)7785 572517Danesh Varma, Finance Director +44 (0)207 653 9881Elliot Hance, Beaufort Securities +44 (0)207 382 8300 

Date   Source Headline
22nd Jan 20217:00 amPRNPlacing of 10 million new shares for £660,000
11th Jan 20217:00 amPRNParys Mountain P.E.A. - Major Increase in Resources
5th Jan 202111:05 amRNSSecond Price Monitoring Extn
5th Jan 202111:00 amRNSPrice Monitoring Extension
4th Jan 20219:06 amRNSSecond Price Monitoring Extn
4th Jan 20219:00 amRNSPrice Monitoring Extension
11th Dec 202011:05 amRNSSecond Price Monitoring Extn
11th Dec 202011:00 amRNSPrice Monitoring Extension
11th Dec 20207:14 amPRNHalf-year Report for six months to 30 September 2020
10th Dec 202011:05 amRNSSecond Price Monitoring Extn
10th Dec 202011:00 amRNSPrice Monitoring Extension
10th Dec 20209:05 amRNSSecond Price Monitoring Extn
10th Dec 20209:00 amRNSPrice Monitoring Extension
9th Dec 20202:06 pmRNSSecond Price Monitoring Extn
9th Dec 20202:01 pmRNSPrice Monitoring Extension
9th Dec 202011:05 amRNSSecond Price Monitoring Extn
9th Dec 202011:00 amRNSPrice Monitoring Extension
9th Dec 20209:05 amRNSSecond Price Monitoring Extn
9th Dec 20209:00 amRNSPrice Monitoring Extension
9th Dec 20208:58 amPRNIssue of Equity - Warrants exercised
7th Dec 20209:05 amRNSSecond Price Monitoring Extn
7th Dec 20209:00 amRNSPrice Monitoring Extension
4th Dec 20202:05 pmRNSSecond Price Monitoring Extn
4th Dec 20202:00 pmRNSPrice Monitoring Extension
4th Dec 20209:28 amPRNWarrant conversion - £68,400 raised
3rd Dec 20204:41 pmRNSSecond Price Monitoring Extn
3rd Dec 20204:35 pmRNSPrice Monitoring Extension
3rd Dec 20202:01 pmRNSPrice Monitoring Extension
1st Dec 20202:06 pmRNSSecond Price Monitoring Extn
1st Dec 20202:00 pmRNSPrice Monitoring Extension
30th Nov 202011:05 amRNSSecond Price Monitoring Extn
30th Nov 202011:00 amRNSPrice Monitoring Extension
23rd Nov 202010:50 amPRNIssue of Equity
18th Nov 20204:41 pmRNSSecond Price Monitoring Extn
18th Nov 20204:36 pmRNSPrice Monitoring Extension
18th Nov 20202:05 pmRNSSecond Price Monitoring Extn
18th Nov 20202:01 pmRNSPrice Monitoring Extension
16th Nov 20204:41 pmRNSSecond Price Monitoring Extn
16th Nov 20204:36 pmRNSPrice Monitoring Extension
16th Nov 20202:05 pmRNSSecond Price Monitoring Extn
16th Nov 20202:00 pmRNSPrice Monitoring Extension
2nd Nov 20207:00 amPRNGeneral Meeting Results & Chairman's Update Comments
30th Oct 20207:00 amPRNLabrador Iron Mines – Preliminary Economic Assessment
8th Oct 202011:06 amPRNIssue of Equity
2nd Oct 202011:00 amRNSPrice Monitoring Extension
1st Oct 20207:00 amPRNResult of AGM & Total Voting Rights
1st Oct 20207:00 amPRNPreliminary Economic Assessment in progress
28th Sep 20207:00 amPRNFinal Results
11th Sep 20204:00 pmPRNNotice of AGM
1st Sep 202012:01 pmPRNAdmission to listing and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.