The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglesey Mining Regulatory News (AYM)

Share Price Information for Anglesey Mining (AYM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.40
Bid: 1.30
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.20 (15.385%)
Open: 1.50
High: 1.52
Low: 1.40
Prev. Close: 1.40
AYM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Parys Mountain - Northern Copper Zone Drilling Update

13 Dec 2023 08:45

Anglesey Mining Plc - Parys Mountain - Northern Copper Zone Drilling Update

Anglesey Mining Plc - Parys Mountain - Northern Copper Zone Drilling Update

PR Newswire

LONDON, United Kingdom, December 13

 

 

Trading Symbol

AIM: AYM

 

13th December 2023

 

Anglesey Mining plc

(“Anglesey” or “the Company”)

 

Parys Mountain – Northern Copper Zone Drilling Update

 

Anglesey Mining plc (AIM:AYM), the UK minerals development company, is pleased to provide an update on the Northern Copper Zone drilling at the Company’s Parys Mountain Cu-Zn-Pb-Ag-Au project, located on the Isle of Anglesey.

 

Highlights

 

Further to the Company’s previous announcement on 5th December, Anglesey is pleased to confirm that the drilling of first drill hole into the Northern Copper Zone (NCZ001) was completed on 11th December at a depth of 635 metres, broadly in-line with the Company’s expectations.Drill hole NCZ001 was modelled to intersect two zones of potential sulphide mineralisation – the first between 365 – 510 metres, relating to the Northern Copper Zone; and the second between 610 – 620 metres interpreted to be an extension of the high-grade Garth Daniel Zone.Visual logging of NCZ001 suggests two zones of sulphide mineralisation were intersected with the Northern Copper Zone interpreted to be between 351 - 540 metres and a second zone, potentially the Garth Daniel Zone, between 560 – 586 metres (all downhole depths).As expected, the interpreted Northern Copper Zone has varying levels of sulphide accumulation. This was also the case with drilling in the 1970’s with the nearest hole to NCZ001 intersecting two higher grade zones of 22.9m @ 1.20% Cu (1.42% CuEq) and 85.3m @ 1.13% Cu (1.40% CuEq) within a broader zone of 146m @ 0.98% Cu (1.20% CuEq) – no gold assaying was conducted on that drill hole.The lower zone of sulphide accumulation between 560 – 586 metres demonstrates areas with very high levels of chalcopyrite, as highlighted in the picture below.

 

 

Logging and sampling of NCZ001 has been ongoing since the commencement of drilling and there are c.300 samples now ready for dispatch to the assay lab. The company expects the first batch to be delivered to the assay laboratory before the Christmas break, with results currently expected to be received during Q1 2024. The second drill hole, NCZ002 is expected to be collared this week. Target zones are modelled at 330 – 420 metres (Northern Copper Zone) and 610 – 620 metres (Garth Daniel Zone).

 

 

Jo Battershill, Chief Executive of Anglesey Mining, commented: “We are very pleased to have finished the first drill hole into the Northern Copper Zone and get confirmation of both our geological and mineralisation models. The mineralisation from the lower zone, currently interpreted to be the Garth Daniel Zone, is particularly encouraging. As previously disclosed, the samples from this drill hole will be sent off to the assay laboratory as soon as possible and we look forward to potentially receiving the results during Q1 2024.”

“The next hole in the program is designed to step out 200 metres to the southwest and provide infill drilling pierce points within the Northern Copper Zone.  Converting the upper levels of the Northern Copper Zone from the Inferred category to the higher confidence Indicated category is the key objective of this program. Our current planning is to drill two holes from the new-collar position to reduce any down time between holes – changing the angle of the rig should ensure the targeted pierce points are achievable.”

“We were originally planning on completing the downhole Muon survey on NCZ001; however, a zone of broken ground at a depth of 390 metres – interpreted to be large fault – would present a risk to the survey tool and increases the chance of losing the tool down the hole. Subsequently, we will aim to conduct the Muon survey upon completion of the next hole.”

About Anglesey Mining plc

Anglesey Mining is traded on the AIM market of the London Stock Exchange and currently has 420,093,017 ordinary shares on issue.

 

Anglesey is developing its 100% owned Parys Mountain Cu-Zn-Pb-Ag-Au deposit in North Wales, UK with a reported resource of 5.3 million tonnes at over 4.0% combined base metals in the Measured and Indicated categories and 10.8 million tonnes at over 2.5% combined base metals in the Inferred category.

Anglesey also holds an almost 50% interest in the Grängesberg Iron project in Sweden, together with management rights and a right of first refusal to increase its interest to 100%.  Anglesey also holds 12% of Labrador Iron Mines Holdings Limited, which through its 52% owned subsidiaries, is engaged in the exploration and development of direct shipping iron ore deposits in Labrador and Quebec.

 

 

For further information, please contact:

Anglesey Mining plc

Jo Battershill, Chief Executive – Tel: +44 (0)7540 366000

Andrew King, Interim-Chairman – Tel: +44 (0)7825 963700

 

Davy

Nominated Adviser & Joint Corporate Broker

Brian Garrahy / Daragh O’Reilly – Tel: +353 1 679 6363

 

WH Ireland

Joint Corporate Broker

Katy Mitchell / Harry Ansell – Tel: +44 (0) 207 220 1666

 

 

 

LEI: 213800X8BO8EK2B4HQ71

 


3892788_0.png3892788_1.png

Date   Source Headline
29th Mar 20224:24 pmPRNBlocklisting - Interim Review
11th Mar 202210:00 amRNSSchedule One - Anglesey Mining plc
11th Mar 202210:00 amPRNAppendix to Schedule One
9th Mar 20225:57 pmPRNProposed Move to AIM
9th Mar 20227:00 amPRNAppendix to Schedule 1 announcement
9th Mar 20227:00 amPRNSchedule 1
8th Mar 202211:31 amPRNGeneral meeting approves move to AIM
23rd Feb 20222:22 pmPRNShare purchase by chief executive
17th Feb 20227:00 amPRNOperations and Corporate Update
11th Feb 202211:05 amPRNAnglesey Mining - Proposed Move to AIM
20th Dec 202111:42 amPRNAppointment of two new Non-Executive directors
13th Dec 20217:00 amPRNHolding(s) in Company
9th Dec 20217:00 amPRNGrängesberg Iron Ore Pre-Feasibility Study Commenced
26th Nov 20217:00 amPRNDrilling commences at Parys Mountain
12th Nov 20217:00 amPRNInterim report at 30 September 2021
20th Oct 20217:00 amPRNDrilling to commence at Parys Mountain in November
18th Oct 20211:00 pmPRNMajor shareholder notification
15th Oct 20214:41 pmRNSSecond Price Monitoring Extn
15th Oct 20214:35 pmRNSPrice Monitoring Extension
8th Oct 20217:00 amPRNAdditional funding secured and work programmes approved
30th Sep 20211:58 pmPRNChairman's AGM Statement - September 2021
30th Sep 20211:00 pmPRNResults of September AGM, Voting and Total Voting Rights
24th Sep 20211:03 pmPRNBlocklisting - Interim Review
8th Sep 20217:00 amPRNAnglesey Mining Financial Results and way forward
3rd Sep 20217:00 amPRNFinal Results for year ended 31 March 2021
18th Aug 20214:41 pmRNSSecond Price Monitoring Extn
18th Aug 20214:35 pmRNSPrice Monitoring Extension
4th Aug 20214:36 pmRNSPrice Monitoring Extension
29th Jul 20212:06 pmRNSSecond Price Monitoring Extn
29th Jul 20212:00 pmRNSPrice Monitoring Extension
29th Jul 20219:42 amPRNNew Chief Executive, Annual Report & Operations Updates
30th Jun 20212:25 pmPRNLabrador Iron Mines Annual Results, Plans for Houston
14th May 20217:00 amPRNCorrection : Director/PDMR Shareholding
10th May 20214:53 pmPRNDirector/PDMR Shareholding
10th May 20219:05 amRNSSecond Price Monitoring Extn
10th May 20219:00 amRNSPrice Monitoring Extension
28th Apr 20212:00 pmRNSPrice Monitoring Extension
6th Apr 20214:41 pmRNSSecond Price Monitoring Extn
6th Apr 20214:36 pmRNSPrice Monitoring Extension
1st Apr 20211:04 pmPRNTotal Voting Rights
16th Mar 20213:27 pmPRNIssue of shares and director/PDMR Shareholding
10th Mar 20214:41 pmRNSSecond Price Monitoring Extn
10th Mar 20214:36 pmRNSPrice Monitoring Extension
10th Mar 20212:05 pmRNSSecond Price Monitoring Extn
10th Mar 20212:00 pmRNSPrice Monitoring Extension
10th Mar 202111:05 amRNSSecond Price Monitoring Extn
10th Mar 202111:00 amRNSPrice Monitoring Extension
9th Mar 20214:41 pmRNSSecond Price Monitoring Extn
9th Mar 20214:36 pmRNSPrice Monitoring Extension
9th Mar 20212:00 pmPRNLabrador Iron Mines – Preliminary Economic Assessment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.