Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAscent Resources Regulatory News (AST)

Share Price Information for Ascent Resources (AST)

Share Price is delayed by 15 minutes
Get Live Data
0.415    0.005 (1.22%)
Bid:
0.38
Ask:
0.45
Spread: 0.07 (18.421%)
Market Cap: £3.88m
AST Live PriceLast checked at - London Stock Exchange

Intraday Ascent Resources Share Chart

Peneszlek Operations Update

4 Dec 2009 07:00

RNS Number : 5912D
Ascent Resources PLC
04 December 2009
 



Ascent Resources plc / Epic: AST / Index: AIM / Sector: Oil and Gas

4 December 2009

Ascent Resources plc ('Ascent' or 'the Company')

Peneszlek Operations Update

Ascent Resources plc, the AIM-traded oil and gas production and exploration company, announces an update on the activities of its Hungarian subsidiary PetroHungaria Kft.  

Production testing of the PEN-105 well on the Company's Nyirseg South permit in northeastern Hungary, drilled and completed in August and September 2009, has yielded an initial flowrate of over 78,000 m3 of gas per day (2.75 MMscfd) from a nine metre interval at the top of the Miocene volcaniclastic section. This well is now shut-in awaiting the construction of the pipeline connection to the main export pipeline.

PetroHungaria has also completed the initial testing operations on the PEN-104AA well on the Nyirseg South permit in north-eastern Hungary. Following removal of the drilling rig, operations began on the well on 30 November 2009 to test a Miocene volcaniclastic reservoir section identified by open-hole well logs and mud log shows to be potentially gas bearing. The well, which was drilled as a high angle deviated well, was completed with external casing packers and a slotted liner in an effort to minimise formation damage and provide maximum access to the reservoir.

On flow, the well produced a small quantity of natural gas along with approximately 20 m3 of water. Analysis of the produced water indicates that it is filtrate lost into the formation during drilling (over 200 m3 of drilling fluids were lost to the formation while drilling the reservoir section and while completing the well). Pending further evaluation of the preliminary test results, it is anticipated that Ascent and its partners will continue testing operations when further specialist equipment can be mobilised in January.

Also at Peneszlek, the drilling permits for the PEN-101 and PEN-106 wells have been issued and site construction will commence shortly. The drilling rig is expected to be mobilized to the location late in January 2010.

Ascent Managing Director Jeremy Eng said, "We are pleased with the completed test results on the PEN-105 well and expect that it will be on production in February 2010, allowing us to take advantage of the strong Hungarian gas pricing. The productive formation of PEN-105 is the same as PEN-104AA. However PEN-104AA was drilled at deviations of up to 65°, and not only has a complex slotted liner completion but also experienced substantial losses whilst drilling. This is disappointing as the preliminary results are inconclusive meaning further testing is necessary to understand its potential. On the other hand, both of the two new planned wells have simple vertical profiles and therefore should be quick to drill and bring onto production on success."

Ascent has a 45.23% interest in the Penészlek Project; through its equity interest in PetroHungaria Kft. Other partners are; DualEx Energy (37.5%), Geomega (8%), Leni Gas & Oil (7.27%) and Swede Resources (2%).

The technical information contained in this release has been reviewed and approved Dr. Clive Ninnes, Ascent's Engineering Manager. Dr. Ninnes, a member of SPE has 28 years relevant experience in the evaluation of hydrocarbon resources.

 

* * ENDS * *

For further information visit www.ascentresources.co.uk or contact:

Jeremy Eng

Ascent Resources plc

Tel: 020 7251 4905

Hugo de Salis

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Paul Youens

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Lindsay Mair

Astaire Securities

Tel: 020 7448 4400

Jerry Keen

Astaire Securities (Corporate Broking)

Tel: 020 7448 4492

Toby Gibbs

Astaire Securities 

Tel: 020 7448 4400

Notes

Ascent Resources plc has a diversified portfolio of hydrocarbon exploration and development projects across five countries in Europe: Italy, Switzerland, Hungary, Slovenia and Netherlands. Ascent's portfolio contains a solid base of field redevelopment projects with selected exposure to exploration upside. The portfolio is focussed on gas and with the exception of the shallow water Netherlands project, all of its projects are located onshore where operating and development costs are substantially lower than they are offshore.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFGMGZVDLGLZG
Date   Source Headline
13th Oct 20107:00 amRNS412 Bcf resource at Petisovci-Lovaszi Project
11th Oct 20104:21 pmRNSHolding(s) in Company
1st Oct 20107:00 amRNSDirectors Dealing
30th Sep 20107:02 amRNSInterim Results
29th Sep 20107:00 amRNSFurther ?3m from Swisss Disposal
23rd Sep 20107:00 amRNSAcquires Further Concessions in Hungary
23rd Sep 20107:00 amRNSChange of Adviser
15th Sep 20107:00 amRNSHolding(s) in Company
14th Sep 20107:00 amRNSDirectorate Change
15th Jul 20107:00 amRNSIncrease in Interest in North Sea Blocks M10/M11
2nd Jul 20107:00 amRNSDirector's Dealing
1st Jul 20107:00 amRNSIncrease in Interest in Petisovci Project
28th Jun 20101:24 pmRNSResult of AGM
16th Jun 20109:49 amRNSNotice of AGM and Posting of Report and Accounts
7th Jun 20101:00 pmRNSPen?szlek Production Update
21st May 201012:30 pmRNSNew Presentation
18th May 20107:00 amRNSFinal Results
11th May 20107:00 amRNSPEN-101 Completion
4th May 20102:00 pmRNSNew Presentation on Website
28th Apr 20107:00 amRNSPartner Withdrawal from Po Valley Permit
23rd Apr 20105:00 pmRNSHolding(s) in Company
22nd Apr 20107:00 amRNSSale of Swiss Subsidiary for ?8m with Rights
19th Apr 20107:00 amRNSOperations Update for Italy and Hungary
1st Apr 20107:00 amRNSPEN-106 Drilling Update
26th Mar 20102:35 pmRNSHolding(s) in Company
25th Mar 20107:00 amRNSResults of 3-D Seismic for the Petisovci Project
23rd Mar 20107:00 amRNSHungarian production and testing update
22nd Mar 201012:44 pmRNSHolding(s) in Company
18th Mar 20107:00 amRNSDirector/PDMR Shareholding
16th Mar 20107:00 amRNSIssue of Equity
12th Mar 201012:00 pmRNSResult of EGM
10th Mar 20107:00 amRNSHungarian testing and production update
22nd Feb 20107:00 amRNSDisposes of interest in Perazzoli Drilling
9th Feb 20108:02 amRNSPEN-101 Drilling Commences
2nd Feb 20107:00 amRNSRe-drilling of Fontana-1
19th Jan 20107:00 amRNSIssue of Options
22nd Dec 20097:00 amRNSFontana-1 Drilling Update
15th Dec 20092:02 pmRNSOperations Update - Replacement
14th Dec 20093:30 pmRNSResult of EGM
14th Dec 20099:30 amRNSOperations Update
8th Dec 20098:15 amRNSRe San Severina Agreement
4th Dec 20097:00 amRNSPeneszlek Operations Update
27th Nov 20097:00 amRNSPlacing to raise ?6m and notice of EGM
11th Nov 20097:00 amRNSAppointment of Broker and Nominated Adviser
6th Nov 20097:00 amRNSOptions Issue
2nd Nov 20097:00 amRNSWell Completion and Update
28th Oct 20097:00 amRNSFontana-1 Drilling Commences
19th Oct 200912:48 pmRNSHolding(s) in Company
12th Oct 200910:00 amRNSIssue of Equity and Facility Limit Increase
28th Sep 20097:00 amRNSPEN-104AA Sidetrack

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.