If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAscent Resources Regulatory News (AST)

  • This share is currently suspended. It was suspended at a price of 0.415

Share Price Information for Ascent Resources (AST)

Share Price is delayed by 15 minutes
Get Live Data
0.415    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £3.88m
AST Live PriceLast checked at - London Stock Exchange

Intraday Ascent Resources Share Chart

Peneszlek Operations Update

4 Dec 2009 07:00

RNS Number : 5912D
Ascent Resources PLC
04 December 2009
 



Ascent Resources plc / Epic: AST / Index: AIM / Sector: Oil and Gas

4 December 2009

Ascent Resources plc ('Ascent' or 'the Company')

Peneszlek Operations Update

Ascent Resources plc, the AIM-traded oil and gas production and exploration company, announces an update on the activities of its Hungarian subsidiary PetroHungaria Kft.  

Production testing of the PEN-105 well on the Company's Nyirseg South permit in northeastern Hungary, drilled and completed in August and September 2009, has yielded an initial flowrate of over 78,000 m3 of gas per day (2.75 MMscfd) from a nine metre interval at the top of the Miocene volcaniclastic section. This well is now shut-in awaiting the construction of the pipeline connection to the main export pipeline.

PetroHungaria has also completed the initial testing operations on the PEN-104AA well on the Nyirseg South permit in north-eastern Hungary. Following removal of the drilling rig, operations began on the well on 30 November 2009 to test a Miocene volcaniclastic reservoir section identified by open-hole well logs and mud log shows to be potentially gas bearing. The well, which was drilled as a high angle deviated well, was completed with external casing packers and a slotted liner in an effort to minimise formation damage and provide maximum access to the reservoir.

On flow, the well produced a small quantity of natural gas along with approximately 20 m3 of water. Analysis of the produced water indicates that it is filtrate lost into the formation during drilling (over 200 m3 of drilling fluids were lost to the formation while drilling the reservoir section and while completing the well). Pending further evaluation of the preliminary test results, it is anticipated that Ascent and its partners will continue testing operations when further specialist equipment can be mobilised in January.

Also at Peneszlek, the drilling permits for the PEN-101 and PEN-106 wells have been issued and site construction will commence shortly. The drilling rig is expected to be mobilized to the location late in January 2010.

Ascent Managing Director Jeremy Eng said, "We are pleased with the completed test results on the PEN-105 well and expect that it will be on production in February 2010, allowing us to take advantage of the strong Hungarian gas pricing. The productive formation of PEN-105 is the same as PEN-104AA. However PEN-104AA was drilled at deviations of up to 65°, and not only has a complex slotted liner completion but also experienced substantial losses whilst drilling. This is disappointing as the preliminary results are inconclusive meaning further testing is necessary to understand its potential. On the other hand, both of the two new planned wells have simple vertical profiles and therefore should be quick to drill and bring onto production on success."

Ascent has a 45.23% interest in the Penészlek Project; through its equity interest in PetroHungaria Kft. Other partners are; DualEx Energy (37.5%), Geomega (8%), Leni Gas & Oil (7.27%) and Swede Resources (2%).

The technical information contained in this release has been reviewed and approved Dr. Clive Ninnes, Ascent's Engineering Manager. Dr. Ninnes, a member of SPE has 28 years relevant experience in the evaluation of hydrocarbon resources.

 

* * ENDS * *

For further information visit www.ascentresources.co.uk or contact:

Jeremy Eng

Ascent Resources plc

Tel: 020 7251 4905

Hugo de Salis

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Paul Youens

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Lindsay Mair

Astaire Securities

Tel: 020 7448 4400

Jerry Keen

Astaire Securities (Corporate Broking)

Tel: 020 7448 4492

Toby Gibbs

Astaire Securities 

Tel: 020 7448 4400

Notes

Ascent Resources plc has a diversified portfolio of hydrocarbon exploration and development projects across five countries in Europe: Italy, Switzerland, Hungary, Slovenia and Netherlands. Ascent's portfolio contains a solid base of field redevelopment projects with selected exposure to exploration upside. The portfolio is focussed on gas and with the exception of the shallow water Netherlands project, all of its projects are located onshore where operating and development costs are substantially lower than they are offshore.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFGMGZVDLGLZG
Date   Source Headline
29th May 20123:40 pmRNSBNP Paribas Credit Agreement
22nd May 20129:34 amRNSHolding in Company
15th May 20124:13 pmRNSHolding in Company
27th Apr 201210:30 amRNSHolding in Company
18th Apr 20127:00 amRNSPositive Drilling Results in Eastern Hungary
13th Apr 201211:52 amRNSCorrection - Holding in Company
13th Apr 20127:00 amRNSHolding(s) in Company
21st Mar 20127:00 amRNSPenészlek Operations Update
24th Feb 20122:44 pmRNSHolding(s) in Company
23rd Feb 20127:00 amRNS22% Increase in Gas-in-Place for Petisovci Project
12th Dec 201111:42 amRNSDirector/PDMR Shareholding
25th Nov 20117:00 amRNSHigh Gas Flows from Successful Pg-10
11th Nov 201112:15 pmRNSHolding(s) in Company
11th Nov 20118:11 amRNSHolding(s) in Company
4th Nov 20115:29 pmRNSDirector Dealing
2nd Nov 20117:00 amRNSPreliminary Pg-11A Results
19th Oct 20119:15 amRNSSuccessful Pg-11 Fracture Stimulation
7th Sep 20117:01 amRNSDirector Options
7th Sep 20117:00 amRNSInterim Results
23rd Aug 20117:01 amRNSPositive Pg-10 Results
21st Jul 20117:00 amRNSIssue of Convertible Notes
30th Jun 20113:15 pmRNSResult of AGM
23rd Jun 20117:00 amRNSSecond Redevelopment Well Spuds in Slovenia
13th Jun 20117:00 amRNSPetisovci Project Update
2nd Jun 20117:00 amRNSFinal Results
24th May 20117:00 amRNSPetisovci, Slovenia - Pg-11A Update
11th Apr 20114:45 pmRNSHolding(s) in Company
7th Apr 20119:44 amRNSHolding(s) in Company
6th Apr 20113:11 pmRNSHolding(s) in Company
6th Apr 201111:34 amRNSResult of General Meeting
31st Mar 201111:45 amRNSTotal Voting Rights
18th Mar 20117:00 amRNSDirectors' Dealing
17th Mar 201111:30 amRNSRaises GBP17 million
7th Mar 20117:00 amRNSIssue of new equity
1st Mar 20117:00 amRNSTotal Voting Rights
16th Feb 20117:00 amRNSPetisovci, Slovenia Drilling Update
11th Feb 201112:00 pmRNSEnQuest transaction completed
2nd Feb 20117:00 amRNSEnQuest Completion and Slovenia Update
31st Jan 20117:00 amRNSTotal Voting Rights
20th Jan 201112:00 pmRNSExercise of options and issue of new equity
4th Jan 20113:00 pmRNSExercise of Options
4th Jan 20117:00 amRNSCorporate Update
22nd Dec 20107:00 amRNSDrilling of Pg-11 in Slovenia Commences
21st Dec 201011:07 amRNSAcquisition of interest in the Petisovci Project
2nd Dec 20107:00 amRNSDrilling Update
29th Nov 20104:20 pmRNSIssue of Equity
19th Nov 20101:15 pmRNSDirector's Dealings
19th Nov 20107:00 amRNSGrant of Options
19th Nov 20107:00 amRNSDrilling & Financing
4th Nov 20107:00 amRNSCompletes sale of Görbeháza-1 discovery in Hungary

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.