If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAscent Resources Regulatory News (AST)

  • This share is currently suspended. It was suspended at a price of 0.415

Share Price Information for Ascent Resources (AST)

Share Price is delayed by 15 minutes
Get Live Data
0.415    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £3.88m
AST Live PriceLast checked at - London Stock Exchange

Intraday Ascent Resources Share Chart

Peneszlek Operations Update

4 Dec 2009 07:00

RNS Number : 5912D
Ascent Resources PLC
04 December 2009
 



Ascent Resources plc / Epic: AST / Index: AIM / Sector: Oil and Gas

4 December 2009

Ascent Resources plc ('Ascent' or 'the Company')

Peneszlek Operations Update

Ascent Resources plc, the AIM-traded oil and gas production and exploration company, announces an update on the activities of its Hungarian subsidiary PetroHungaria Kft.  

Production testing of the PEN-105 well on the Company's Nyirseg South permit in northeastern Hungary, drilled and completed in August and September 2009, has yielded an initial flowrate of over 78,000 m3 of gas per day (2.75 MMscfd) from a nine metre interval at the top of the Miocene volcaniclastic section. This well is now shut-in awaiting the construction of the pipeline connection to the main export pipeline.

PetroHungaria has also completed the initial testing operations on the PEN-104AA well on the Nyirseg South permit in north-eastern Hungary. Following removal of the drilling rig, operations began on the well on 30 November 2009 to test a Miocene volcaniclastic reservoir section identified by open-hole well logs and mud log shows to be potentially gas bearing. The well, which was drilled as a high angle deviated well, was completed with external casing packers and a slotted liner in an effort to minimise formation damage and provide maximum access to the reservoir.

On flow, the well produced a small quantity of natural gas along with approximately 20 m3 of water. Analysis of the produced water indicates that it is filtrate lost into the formation during drilling (over 200 m3 of drilling fluids were lost to the formation while drilling the reservoir section and while completing the well). Pending further evaluation of the preliminary test results, it is anticipated that Ascent and its partners will continue testing operations when further specialist equipment can be mobilised in January.

Also at Peneszlek, the drilling permits for the PEN-101 and PEN-106 wells have been issued and site construction will commence shortly. The drilling rig is expected to be mobilized to the location late in January 2010.

Ascent Managing Director Jeremy Eng said, "We are pleased with the completed test results on the PEN-105 well and expect that it will be on production in February 2010, allowing us to take advantage of the strong Hungarian gas pricing. The productive formation of PEN-105 is the same as PEN-104AA. However PEN-104AA was drilled at deviations of up to 65°, and not only has a complex slotted liner completion but also experienced substantial losses whilst drilling. This is disappointing as the preliminary results are inconclusive meaning further testing is necessary to understand its potential. On the other hand, both of the two new planned wells have simple vertical profiles and therefore should be quick to drill and bring onto production on success."

Ascent has a 45.23% interest in the Penészlek Project; through its equity interest in PetroHungaria Kft. Other partners are; DualEx Energy (37.5%), Geomega (8%), Leni Gas & Oil (7.27%) and Swede Resources (2%).

The technical information contained in this release has been reviewed and approved Dr. Clive Ninnes, Ascent's Engineering Manager. Dr. Ninnes, a member of SPE has 28 years relevant experience in the evaluation of hydrocarbon resources.

 

* * ENDS * *

For further information visit www.ascentresources.co.uk or contact:

Jeremy Eng

Ascent Resources plc

Tel: 020 7251 4905

Hugo de Salis

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Paul Youens

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Lindsay Mair

Astaire Securities

Tel: 020 7448 4400

Jerry Keen

Astaire Securities (Corporate Broking)

Tel: 020 7448 4492

Toby Gibbs

Astaire Securities 

Tel: 020 7448 4400

Notes

Ascent Resources plc has a diversified portfolio of hydrocarbon exploration and development projects across five countries in Europe: Italy, Switzerland, Hungary, Slovenia and Netherlands. Ascent's portfolio contains a solid base of field redevelopment projects with selected exposure to exploration upside. The portfolio is focussed on gas and with the exception of the shallow water Netherlands project, all of its projects are located onshore where operating and development costs are substantially lower than they are offshore.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFGMGZVDLGLZG
Date   Source Headline
28th Sep 20177:01 amRNSInterim results for the period ended 30 June 2017
28th Sep 20177:00 amRNSChange of Adviser
12th Sep 20177:00 amRNSIssue of Equity
8th Sep 20174:37 pmRNSHolding(s) in Company
7th Sep 20177:00 amRNSOperational update
15th Aug 20173:43 pmRNSDirector/PDMR Shareholding
9th Aug 20173:20 pmRNSHolding(s) in Company
8th Aug 20173:13 pmRNSHolding(s) in Company
4th Aug 20177:00 amRNSOperational Update-commencement of test production
31st Jul 201711:13 amRNSConversion of final 2014 convertible loan notes
27th Jul 20172:34 pmRNSHolding(s) in Company
24th Jul 20177:01 amRNSHolding(s) in Company
24th Jul 20177:00 amRNSReplacement - Holding(s) in Company
18th Jul 20174:29 pmRNSHolding(s) in Company
18th Jul 20177:00 amRNSOperational Update - Petisovci Gas Field
17th Jul 201710:07 amRNSIssue of Equity
7th Jul 20174:59 pmRNSHolding(s) in Company
7th Jul 20177:00 amRNSIssue of Equity
28th Jun 20177:00 amRNSOperational Update - Petisovci Gas Field
23rd Jun 201711:57 amRNSIssue of Equity
12th Jun 20173:56 pmRNSResult of AGM
6th Jun 20177:00 amRNSOperational Update
30th May 20178:43 amRNSDirectors' conversion of loan notes
8th May 201711:40 amRNSAnnual Report and Notice of AGM
8th May 20177:00 amRNSHolding(s) in Company
5th May 201711:15 amRNSIPPC Appeal
2nd May 20177:00 amRNSPg-11A Commencement of Works
27th Apr 20179:53 amRNSIssue of Equity
24th Apr 20177:00 amRNSAudited Final Results
13th Apr 20177:00 amRNSFirst gas
31st Mar 20177:00 amRNSIPPC Update
10th Mar 20172:15 pmRNSIssue of Equity
10th Mar 20177:00 amRNSOperational Update
24th Feb 20177:00 amRNSIssue of Equity
14th Feb 20177:00 amRNSDirector/PDMR Shareholding
13th Feb 20177:00 amRNSSuccessful fundraising of £3m via PrimaryBid
10th Feb 20176:31 pmRNSUnderwritten Offer to Raise £3m via PrimaryBid
7th Feb 20173:29 pmRNSHolding(s) in Company - Replacement
7th Feb 201712:07 pmRNSHolding(s) in Company
31st Jan 20174:17 pmRNSIssue of Equity
30th Jan 20177:00 amRNSResult of Pg-10 Flow Test
27th Jan 201711:45 amRNSIssue of Equity
25th Jan 201711:30 amRNSStatement re Share Price Movement
24th Jan 201711:05 amRNSHolding(s) in Company
23rd Jan 20178:00 amRNSOperational update - Well Pg-10
18th Jan 20171:57 pmRNSHolding(s) in Company
17th Jan 20173:32 pmRNSHolding(s) in Company
6th Jan 20177:00 amRNSOperational update
4th Jan 201712:53 pmRNSHolding(s) in Company
3rd Jan 201712:45 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.