Operations and Exploration Update

20 Oct 2010 07:00

RNS Number : 6641U
Mwana Africa PLC
20 October 2010
 



20th October 2010

 

Mwana Africa PLC

Operations and Exploration Update

 

Mwana Africa PLC ("Mwana" or "the Company") is pleased to provide an update on operations and exploration activity.

Highlights

·; Freda Rebecca: gold production of 2,600oz in September, nears consistent Phase 1 target rate of 30,000oz per annum; 11,920oz produced March-September, generating $14.8m in revenue

·; Debt and off-take terms for Bindura restart programme under negotiation

·; Zani Kodo exploration programme: identification of gold mineralisation at predicted locations on the Zani-Kodo trend; confirmation of geological model and identification of potential for significant mineralisation along the complete 9km strike length of the trend

·; Semkhat Kibolwe: Encouraging drill results

 

Freda Rebecca Gold Mine

Production operations recommenced at Freda Rebecca a year ago with the completion of the first phase of a two phase refurbishment programme. Early production difficulties were caused by the poor availability of the refurbished mining fleet. This was addressed in July with the purchase of two new haul trucks. Since then production tonnage, grade and recovery has made steady progress towards target.

 

Since March 2010, 11,920 ounces were produced generating $14.8m in revenue. In September 2,600 ounces were produced, exceeding the Phase 1 production target rate of 30,000 ounces p.a. and we believe that the operation is now close to consistently achieving this rate.

 

Operational focus has been on the deployment of additional new dump trucks, the rehabilitation of underground loaders and the appointment of key engineering personnel.

 

Preparatory work has commenced on the Phase 2 mill refurbishment. Loan finance from Industrial Development Corporation of South Africa (IDC) remains undrawn pending completion of final conditions to drawdown.

 

For figures 1-3, please click on the link below

http://www.rns-pdf.londonstockexchange.com/rns/6641U_-2010-10-19.pdf 

 

Bindura Nickel

 

August saw the completion of the SRK report on the restart of production at the Trojan mine. This has enabled the Company to start negotiations for off take terms and for the provision of debt finance. Two indicative term sheets have been received and these are currently the subject of negotiation.

In anticipation of the re- start of operations the Company has been actively engaged in carrying out a program of works aimed at overhauling certain key components of engineering and operational infrastructure. These works funded from BNC balance sheet, included the main pumping arrangements, ventilation fans and a replacement program of shaft guides. On surface the waste handling system has been re-engineered together with a major overhaul of the surface secondary and tertiary crushers.

Preparatory work for the restart of operations has included the commencement of limited underground development (approximately 500m development completed) allowing the commissioning of underground LHDs, rigs and associated mining and engineering services together with shaft systems. Ore and waste hoisted to surface has allowed the successful hot commissioning of the surface waste conveyors and ore crushing facilities.

The objective of the program has been to de-risk the planned restart program in anticipation of project funding.

The management team at BNC has been retained during care and maintenance and have been re-mobilised and actively engaged in the pre-start program.

 

Zani Kodo

Since the announcement in July 2010, which reported a combined indicated and inferred resource of 1.25Moz @ 3.53g/t at the Kodo Main area, exploration activity has focused on delineating mineralisation along strike extensions of the Zani-Kodo mineralised trend (Figure 4). The trend is defined along the sheared contact between a footwall metagreywacke and a black shale/ banded iron formation unit. Two areas are currently being drilled:

 

Le Badolite

1km to the south of Kodo the contact was interpreted to occur at the Badolite area based on field mapping and aeromagnetic interpretations (Figure 4). To date a total of 400m strike length has been tested but the zone remains completely open along strike to the south. A further 700m strike length is present between Badolite and Zani Central where a single exploratory hole in 2008 intersected 26m @ 1.31g/t (Figure 4).

The zone is also open at depth and a hole has been planned on the eastern flank of Mt Zani to attempt to intersect the Badolite mineralised zone at depth (Figure 6). If successful this will define a 900m down dip continuity to the zone. This compares to the 450m downdip continuity currently drilled at Kodo Main which remains open at depth.

The area is masked by scree cover so no significant artisanal activity has occurred here. Drilling successfully intersected the predicted metagreywacke-black shale contact and a near surface mineralised zone with results as below:

 

 

 

 

Hole ID

Depth From

(m)

Depth To

(m)

Intersection

BDLDD001

23

31

8m @ 2.44g/t

BDLDD004

75

90

15m @ 1.72g/t

BDLDD006

54

82

28m @ 3.02g/t inc. 6m @ 4.21g/t and 10m @ 4.13g/t

BDLDD007

92

111

19m @ 2.39g/t

BDLDD010

112

118

6m @ 3.67g/t

125

128

3m @ 4.22g/t

BDLDD011

151.8

154.4

2.6m @ 1.80g/t

165

167

2m @ 1.55g/t

Table 1: Drilling results, Badolite area.

The position of the intersections is shown in Figure 5.

The mineralised zone follows the bedding parallel shear zone at the upper contact of the competent metagreywacke unit and dips to the NE at 50° (Figure 6).

Kodo North Extension

This target is located to the north of Kodo, where the mineralised contact has been offset by a NE trending fault (Figure 4). Thick scree cover (2-20m) is present in the area so the predicted position of the mineralised trend was defined from aeromagnetics and an understanding of the local stratigraphy. A fence line of holes has been drilled and the metasandstone-BIF contact has been intersected. A 20-40m wide zone of intense shearing and silicification with visible sulphide mineralisation has been intersected. Assay results are awaited.

Semkhat - Kibolwe

 

Recent drilling (results summarised below) has identified a secondary enriched sediment-hosted stratiform copper deposit hosted by Mines sub-group rocks in a near-surface, flat-lying mineralised zone up to 40 metres thick extending over a strike of 1,500 metres. Mineralization west of the Kibolwe Main copper clearing is open-ended and further drilling programmes have been planned to test the western extensions of the deposit.

 

Bore hole No.

From (m)

To (m)

Av. Total Cu %

True width (m)

KIB DD 011

37.60

44.70

3.2

4.9

KIB DD 012

17.20

32.20

7.4

13.7

KIB DD 017

27.20

52.00

3.6

21.8

KIB DD GW10N

25.60

47.50

5.7

17.6

KIB DD 023

61.30

69.50

3.0

7.1

KIB DD 028b

66.60

74.40

1.7

6.4

KIB DD 34

58.90

68.90

2.8

8.7

 

For figures 4-6, please click on the link below:

http://www.rns-pdf.londonstockexchange.com/rns/6641U_-2010-10-19.pdf 

 

Enquiries:

Oliver Baring, Executive Chairman Tel: 020 7654 5588

Mwana Africa PLC

 

David Simonson/ Anca Spiridon Tel: 020 7653 6620

Merlin

 

Richard Swindells / Jen Boorer Tel: 0207 634 4856

Ambrian Partners Limited

(Nominated Adviser and Broker)

 

Charl du Plessis, Executive Vice President Exploration of Mwana Africa, who holds a PhD and is a Member of the AusIMM, is a 'Qualified Person' as defined in the AIM Rules and under NI 43-101, and the exploration and resource development information contained in this press release has been reviewed by Dr Du Plessis. Mineral resource estimates included herein are presented in accordance with the JORC Code. If presented in accordance with the CIM Definition Standards on Mineral Resources and Mineral Reserves adopted by the CIM Council, the mineral resource and mineral reserve presentation would be materially the same.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAFENFFFEFAF
Date   Source Headline
5th Jul 20164:35 pmRNSSecond Price Monitoring Extn
5th Jul 20162:05 pmRNSSecond Price Monitoring Extn
5th Jul 20162:00 pmRNSPrice Monitoring Extension
29th Jun 20161:00 pmRNSBindura Nickel Financial Results to 31 March 2016
3rd Jun 20167:00 amRNSChange of Adviser and appointment of new director
13th May 20162:59 pmRNSResult of General Meeting
5th May 20162:01 pmRNSCorporate Update
29th Apr 20167:00 amRNSQuarterly Update
14th Apr 201610:00 amRNSAcquisition
8th Apr 20167:00 amRNSNotice of GM
10th Feb 20163:34 pmRNSQuarterly Operations and Explorations Update
19th Jan 20164:02 pmRNSChange of Registered Office
11th Dec 20154:19 pmRNSHalf Yearly Report
8th Dec 201510:23 amRNSChange of website and email addresses
2nd Dec 20157:00 amRNSBindura Nickel Interim Results 30 September 2015
26th Nov 20154:53 pmRNSPublication of interim results and Trading update
17th Nov 20157:00 amRNSQuarterly Update
1st Oct 201511:54 amRNSDirectorate Change
30th Sep 20157:00 amRNSChange of name and results of AGM
29th Sep 201512:41 pmRNSResults of Open Offer - clarification
29th Sep 20157:00 amRNSResults of Open Offer
15th Sep 201511:33 amRNSDirector Dealing
2nd Sep 20157:00 amRNSOpen Offer & posting of a circular
28th Aug 20155:00 pmRNSResignation of Director
27th Aug 20157:01 amRNSNotice of AGM, Annual Report, new director
25th Aug 20157:00 amRNSQUARTERLY UPDATE
29th Jul 20157:00 amRNSAnnual Financial Report
24th Jul 20154:40 pmRNSSecond Price Monitoring Extn
24th Jul 20154:35 pmRNSPrice Monitoring Extension
24th Jul 201510:00 amRNSChange of Advisers
21st Jul 20157:00 amPRNBindura Nickel Financial Results to 31 March 2015
9th Jul 20153:02 pmRNSCorporate Update
26th Jun 20154:40 pmRNSSecond Price Monitoring Extn
26th Jun 20154:35 pmRNSPrice Monitoring Extension
26th Jun 20157:00 amRNSResignation of Nominated Adviser and Broker
16th Jun 20154:32 pmRNSDirector Details
10th Jun 20159:03 amRNSReplacement: Board Change
10th Jun 20157:01 amRNSDirectorate Change
9th Jun 201512:23 pmRNSResults of EGM and Board Changes
8th Jun 20151:36 pmRNSAppointment of Interim Chairman
8th Jun 20151:33 pmRNSHigh Court Petition Update
5th Jun 201512:58 pmRNSBoard changes and update on petition
28th May 20157:00 amRNSISS Makes Vote Recommendations
26th May 20157:01 amRNSChamber of Mines of Zimbabwe appointment
20th May 20159:39 amRNSHoldings in Company
12th May 20154:30 pmRNSPosting of Circular and Notice of EGM
7th May 201512:35 pmRNSHigh Court Petition & Requisition of GM Update
6th May 20153:58 pmRNSHoldings in Company and Director's Dealing
6th May 20153:03 pmRNSHoldings in Company and Director's Dealing
22nd Apr 20157:00 amPRNBlocklisting - Interim Review

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.