1st Quarter 2010 Financial & Production Results

27 Oct 2009 07:00

Aquarius Platinum: First Quarter 2010 Financial & Production Results

Highlights of the Quarter

Attributable production of 96,500 PGM ounces

PGM Dollar prices improved through quarter

Gross "cash" profit for the quarter of $18.6 million

Net profit for the quarter was $9.5 million after $3.2 million "once off" costs associated with the Ridge acquisition and after $3.4 million movement on the convertible bond

Ridge Mining plc acquisition successfully completed

Re-establishment of Everest Mine on track

Commenting on the results, Stuart Murray, CEO of Aquarius Platinum said "While production and hence costs were negatively affected by unprotected industrial action at the Kroondal and Marikana mines, the underlying performance of these operations remained stable. The attributable loss of approximately 16,000 ounces due the industrial action is in line with previous guidance given. Dollar metal prices continued to show resilience, with a 6% increase in the PGM Dollar basket price during the quarter. That said, the continuing strength of the Rand, and rising input costs (most notably of electricity) will continue to place margins in the South African platinum industry under pressure.

"The Ridge Mining acquisition was completed during the quarter, and these operations have now been firmly integrated within the AQPSA management structures. We expect these operations to add modest growth to existing operations in the short to medium term, while presenting a prospective growth profile in the longer term. Good progress has been made with the re-establishment of Everest; although a decision on when to resume mining operations will only be made when market circumstances are more favourable.

"Despite market turmoil, Rand strength and the "industrial action season" in South Africa, Aquarius remains cash positive, with a strong balance sheet and $195 million in cash. We will continue to seek further growth opportunities and are well-positioned to do so in an industry that is cash-strapped and under pressure."

P&SA1 at Kroondal

PGM production of 88,808 PGM ounces (44,404 PGM ounces attributable to Aquarius)

Production affected by unprotected industrial action

One million fatality free shifts achieved on 21 August

Firstplats transaction effective, extends Kroondal life-of-mine in excess of one year

Cash margin for the quarter of 19%

P&SA2 at Marikana

PGM production of 31,222 PGM ounces (15,611 PGM ounces attributable to Aquarius)

Production affected by unprotected industrial action and open pit pothole intersection

Firstplats transaction effective, extends Marikana life-of-mine in excess of two years

Cash margin for the quarter of -8%

Everest

Re-establishment project on track

Excavation of North decline portal complete; decline development ready to commence

Department of Minerals and Resources (DMR) original mine suspension order (Section 54 notice) fully lifted

Mimosa

PGM production 50,828 PGM ounces (25,414 PGM ounces attributable to Aquarius).

Cash margin for the quarter of 36%

CTRP

PGM production of 1,740 PGM ounces (870 PGM ounces attributable to Aquarius)

Effective cash margin of 42%

Platinum Mile

PGM production of 5,932 PGM ounces (2,966 PGM ounces attributable to Aquarius)

Milling expansion yielding anticipated results

Effective cash margin of 34%

Blue Ridge

Fully integrated into AQPSA operational management

Mining ramp-up and concentrator commissioning in progress

PGM production of 14,469 PGM ounces (7,235 PGM ounces attributable to Aquarius)

Revenues and operating expenditure capitalised

Production by mine Quarter ended PGMs (4E) Dec 2008 Mar 2009 Jun 2009 Sep 2009 Kroondal 109,707 104,920 105,720 88,808 Marikana 42,451 38,851 37,753 31,223 Everest* 31,703 - - - Mimosa 43,232 46,278 46,874 50,828 CTRP 1,784 1,587 1,689 1,740 Platinum Mile 3,103 2,788 4,479 5,932 Blue Ridge - - - 14,469 Total 231,980 194,424* 196,515 193,001

*Mining operations at Everest mine were temporarily suspended from the night shift on 7 December 2008 following a subsidence incident. The mine is currently undergoing a re-establishment capex programme to ready the mine for operations.

Production by mine attributable to Aquarius

Quarter ended PGMs (4E) Dec 2008 Mar 2009 Jun 2009 Sep 2009 Kroondal 54,854 52,460 52,860 44,404 Marikana 21,226 19,426 18,877 15,611 Everest* 31,703 - - - Mimosa 21,616 23,139 23,437 25,414 CTRP 892 793 845 870 Platinum Mile 1,552 1,394 2,240 2,966 Blue Ridge - - - 7,235 Total 131,843 97,212 98,259 96,500

*Mining operations at Everest mine were temporarily suspended from the night shift on 7 December 2008 following a subsidence incident. The mine is currently undergoing a re-establishment capex programme to ready the mine for operations.

Metals prices and exchange rate

US Dollar prices increased across all PGM metals with palladium (16%) and rhodium (14%) recording the largest price increases.

Platinum closed the quarter up 5% at $1,230 per PGM ounce. Platinum has now traded above $1,200 per ounce since 2 August, trading at a quarterly high of $1,339 per ounce on 16 September. Strong jewellery demand in China continues to mitigate reduced demand from the auto industry. Rhodium increased by 14% to average $1,603 per ounce for the quarter. The metal broke out of the $1,500 band on 23 July and traded above $1,600 through to the end of the quarter, closing at $1,650 per ounce. Palladium closed the quarter up by 18% at $294 per ounce and has now increased by 55% from its January 2009 price, assisted by increased exchange traded fund (ETF) activity.

Average PGM basket prices achieved at Aquarius operations: US$ per PGM ounce(4E) Basket prices (Quarter ended) Dec 2008 Mar 2009 Jun 2009 Sep 2009 Kroondal 746 795 915 972 Marikana 744 799 928 999 Everest 746 - - - Mimosa 905 626 751 805 CTRP 818 859 993 1,074 Platinum Mile 596 810 930 1,004 Blue Ridge - - - 967 Aquarius Group average 770 756 879 931

Consequently, PGM basket prices in US Dollars strengthened at all operations, with the average group basket price being 6% higher at $931 per ounce compared to the previous quarter. The average basket price at the South African operations was $981 per PGM ounce, equivalent to R7,744 per PGM ounce at an average exchange rate for the period of R7.89:$1.

The Rand maintained its strength against the US Dollar during the quarter, with the average Rand-Dollar exchange rate appreciating by 8% to R7.89. The Rand closed the quarter at R7.42 to the US Dollar.

Financials

Consolidated earnings for the quarter ended 30 September 2009 showed a net profit of $9.5 million (US 2 cents per share). Net cash profit for the quarter was $18.7 million. This is a significant improvement on the previous corresponding quarter (September 2008) when a net loss of $21.5 million was recorded due largely to the impact of significant negative sales adjustments caused by falling prices. This quarter's results reflect reduced volatility in PGM prices, which have gradually risen from the low base experienced in October-December 2008. The full upside of the price recovery was contained by a strengthening of the Rand.

Revenue for the quarter was $85.8 million and is inclusive of positive sales adjustments of $8.2 million due to the flow-through of improved PGM prices experienced during the quarter. The stability and recovery in PGM prices has seen an end to the abnormally high sales adjustments experienced in the December 2008 half year.

Table A: Aquarius attributable production and net profit summary by quarter

Quarter Quarter Quarter Quarter Quarter ended ended ended ended ended Sep '08 Dec '08 Mar '09 June'09 Sep '09

4PGE production (attributable 128,366 131,843 97,212 98,259 96,500 ounces)

Revenue $178.1m $90.0m $66.7m $80.6m $77.6m PGM sales adjustments - realised ($71.9m) ($57.1m) $11.8m $12.3m $8.2m & Unrealised Total revenue $106.2m $32.9m $78.5m $92.9m $85.8m Net profit/loss ($20.4m) ($76.9m) $5.5m $30.2m $17.9m Fair value movement in - - - $3.8m ($3.4m) derivative liability "One - off" costs relating to - - - - ($3.2m) the Ridge acquisition* Income tax ($1.1m) $28.3m $1.0m ($12.4m) ($1.8m) Net Profit/(Loss) after tax & ($21.5m) ($48.6m) $6.5m $17.8m $9.5m outside equity Interests

*Pursuant to IFRS business combination standard

Production for the quarter was a credible 96,500 PGM ounces (including 7,235 PGM ounces from the Blue Ridge mine that was acquired from Ridge Mining in July 2009), given the disruption to operations caused by the unprotected industrial action of the employees of the underground mining contractor, Murray and Roberts Cementation (MRC) at Kroondal and Marikana. Approximately 16,000 PGM ounces of attributable production were lost due to the strike, with some impact extending into the initial part of the next quarter. Management measures, such as working additional shifts, are being implemented to recover the production lost during the course of the financial year.

Consequently, reductions in unit costs did not materialise at Kroondal and Marikana. Although management plans were implemented to mitigate the impact of the industrial action, unit costs at both operations rose. The quarter also carried the full electricity tariff increase effected in June 2009, as well as higher seasonal tariffs, resulting in a 44% increase in electricity cost (despite lower consumption due to industrial action).

Unit costs at Mimosa were relatively stable.

Operating costs at Blue Ridge will continue to be capitalised during the ramp-up phase.

As a result of reduced revenue and higher unit costs at the South African operations, margins declined for the quarter, returning a gross profit of $9.4 million.

Looking to the next quarter, production costs will continue to be under pressure with increased electricity costs, wage increases implemented and a strong Rand. A return to normalised production levels should, however, result in a decrease in unit costs.

Administration and other costs of $6 million included the $3.2 million "once off" costs relating to the acquisition of Ridge Mining, reported in accordance with IFRS business combination standard.

Finance charges of $5.1 million for the quarter were lower as a result of the repayment of the bridge facility of $177 million in May 2009. Included in finance charges was interest expensed of $2.9 million on group debt, non-cash accretion of the convertible note $0.8 million and unwinding of the rehabilitation provision of $1.3 million. Depreciation and amortisation were in line at $9.0 million.

Fair value movement in embedded derivative component of convertible bond

As the convertible bond was issued in Rand and the functional currency of Aquarius is US Dollars, the convertible note represents a financial exposure. The embedded derivative portion of this convertible note is required to be measured at fair value with any movement recognised through the income statement. The derivative was fair valued at 30 September resulting in an income statement charge of $3.4million.

Cash

Group cash balances increased by $41 million to $194.7 million partly due to the exercise of the Ridge Mining warrants and options by Zijin ($7.8 million) and Imbani ($28 million) which were subsequently swapped for shares in Aquarius.

Net operating cash flow for the quarter comprised $84.7 million from sales, $58.2 million paid to suppliers and net finance expenses of $1.6 million. Material cash flow items (other than mine operations) that affected cash balances during the quarter included capital expenditure of $10.5 million.

Group cash at 30 September 2009 was held as follows:

AQP $141 million AQPSA $ 31 million ACS(SA) $ 9 million Mimosa $ 4 million Ridge Mining $ 10 million Total $195 million Aquarius Platinum Limited Consolidated Income Statement Quarter ended 30 September 2009 $'000 Quarter Ended Financial Year Ended 30/09/09 30/09/08* 30/06/09 Note: * Aquarius PGM Production 96,500** 128,366 455,675 (attributable ounces) Revenue (i) 85,884 106,243 310,556 Cost of sales (including D&A) (ii) (76,443) (104,870) (334,327) Gross profit/(loss) 9,441 1,373 (23,771) Other income 87 74 1,815 Admin & other operating costs (iii) (6,034) (2,327) (9,919) Other FX movements (iv) 16,410 (23,427) (20,328) Fair value movement in (v) (3,415) - 3,829 derivative liability Finance costs (vi) (5,126) (11,598) (35,968) Impairment (losses) - - (13,050) Profit/(loss) before tax 11,363 (35,905) (97,392) Income tax benefit/(expense) (1,815) (1,129) 15,808 Profit/(loss) after tax 9,548 (37,034) (81,584) Minority interest (vii) - 15,475 (35,842) Net profit/(loss) 9,548 (21,559) (45,742) EPS (basic - cents per share) 2.1 (8.2) (13.30) *Unaudited

** PGM production of 96,500 includes 7,325 PGM ounces from Blue Ridge -

operating costs and revenue currently capitalised.

Notes on the September 2009 Consolidated Income Statement

Revenue for the quarter was lower as a function of reduced production in South Africa and a lower Rand basket price given the 8% appreciation of the Rand against the US Dollar

Cost of sales per PGM ounce increased as a result of higher electricity charges and reduced production in South Africa due to unprotected industrial action during the quarter

Administration and other costs of $6 million included $3.2 million "once off" costs relating to the acquisition of Ridge Mining, pursuant to IFRS business combination standard

Gain largely attributable to positive revaluation adjustments on intergroup debt

Relates to the movement in the fair value of the derivative component of R650 million ($78 million) convertible bond issued during May 2009

Finance costs include group debt ($2.9 million), non-cash interest accretion on the convertible note ($0.8 million) and unwinding of the rehabilitation provision ($1.3 million).

Minority interests no longer apply following conclusion of the final phase of the BEE flip in October 2008.

Aquarius Platinum Limited Consolidated Cash flow Statement Quarter ended 30 September 2009 $'000 Quarter Ended Financial Year Ended Note: 30/09/09* 30/09/08 30/06/09 * Net operating cash inflow (i) 28,124 90,637 13,219 Net investing cash outflow (ii) (44,219) (11,499) (74,593) Net financing cash inflow/(outflow) (iii) 48,729 (26,205) 38,754 Net increase (decrease) in cash held 32,634 52,933 (22,620) Opening cash balance 153,600 170,956 170,956 Exchange rate movement on cash 8,421 (10,064) 5,264 Closing cash balance 194,655 213,825 153,600 * Unaudited

Notes on the September 2009 Consolidated Cash flow Statement

Net operating cash flow for the September quarter includes $84.7 million inflow from sales, $58.2 million paid to suppliers and net finance income of $1.6 million.

Includes development and plant and equipment expenditure of $10.5 million.

Includes exercise of Ridge options $39.7 million and net movement in borrowings$6.0 million Aquarius Platinum Limited Consolidated Balance Sheet At 30 September 2009 $'000 Quarter Financial Year Ended Ended 30 Sept 2009 30 June 2009 Note: $'000 $'000 Assets Cash assets 194,655 153,600 Current receivables (i) 127,753 119,866 Other current assets (ii) 52,539 43,652 Property, plant and equipment (iii) 305,952 230,057 Mining assets (iv) 376,440 270,374 Intangibles (v) 77,737 74,167 Other non-current assets (vi) 27,585 25,287 Total assets 1,162,661 917,003 Liabilities Current liabilities (vii) 81,233 81,514 Non-current payables (viii) 6,467 1,555

Non-current interest-bearing liabilities (ix) 120,385 70,034

Other non-current liabilities (x) 175,847 155,730 Total liabilities 383,932 308,833 Net assets 778,729 608,170 Equity Parent entity interest 778,729 608,170 Total equity 778,729 608,170 * Unaudited

Notes on the September 2009 Consolidated Balance Sheet

Reflects debtors receivable on PGM concentrate sales

Reflects PGM concentrate inventory, reef stockpiles and consumables stores

Represents plant and equipment within the Group

Mining assets reflects Kroondal, Marikana, Mimosa, Everest and Ridge mining (mining rights)

Platinum Mile Resources acquisition

Includes recoverable portion of rehabilitation provision from P&SA partner ($12.2 million), investment in rehabilitation trust ($12.6 million) and investments in unlisted entities ($2.8 million)

Includes trade creditor and other payables.

Includes rehabilitation obligations on P&SA1 and P&SA2 structures.

Includes convertible note liability ($73.5 million), derivative liability ($9.5 million), Ridge group loans ($35.5 million) and other loans (1.6 million).

Reflects deferred tax liabilities $106.6 million, provision for closure costs $69.3 million.

AQUARIUS PLATINUM (SOUTH AFRICA) (PTY) LTD (Aquarius Platinum 100%)

P&SA 1 at Kroondal

Safety

The 12-month rolling average disabling injury incidence rate (DIIR) for the quarter improved to 0.66 per 200,000 hours worked from 0.74 in the previous quarter. Only five lost-time injuries were reported during the quarter, a 50% improvement in the number of lost-time injuries compared with the previous quarter. Kroondal Mine was recognised for achieving one million fatality free shifts on 21 August 2009.

Mining

Operations at Kroondal were significantly impacted by unprotected industrial action by employees of the underground mining contractor, MRC, which resulted in the eventual dismissal of the workforce.

The underground mining contract at the K5 shaft was successfully transferred from Redpath Mining to MRC to consolidate operations under one contractor, albeit with some production lost during the process

Production tonnes for the quarter decreased by 16% to 1,365,911 tonnes

Head grade improved marginally from 2.58 g/t to 2.63 g/t

Processing

Tonnes processed decreased by 18 % to 1,323,505 tonnes

Recoveries increased by 0.2% to 79.1%

PGM production decreased by 16 % to 88,808 PGM ounces

Revenue

The Kroondal Dollar-denominated basket price improved by 6% to an average of $972 per PGM ounce. The improvement was, however, offset by Rand strength, and resulted in the Kroondal Rand-denominated basket weakening by 2.7% compared with the previous quarter. Pricing stability contributed to lower PGM sales adjustments, which reduced from R113 million in Q4 (2009) to R58 million in Q1 (2010).

The decrease in production, the lower Rand basket price and decreased PGM sales, negatively affected revenue for the quarter, which decreased by 23% to R638 million (R319 million attributable to Aquarius).

Operations

The underground mining contract at the K5 shaft was successfully transferred from Redpath to MRC during the quarter. The contract transfer was motivated by operational and equipment synergies that could be realised, benefiting the K5 shaft in terms of production and cost improvements. Although the transfer process proceeded according to plan, it did result in lower production during the handover.

Unprotected industrial action by employees of the underground mining contractor, MRC on three of the Kroondal shafts during September 2009, had a significant impact on production. This unprotected industrial action, which eventually resulted in a mass dismissal of the workforce, took place despite a wage settlement of 10.2% having been agreed between MRC and the National Union of Mineworkers (NUM). Disruptive and intimidatory action by former employees prevented effective recruitment from the dismissed employee base, requiring a greater component of those recruited to be new employees, thus delaying the engagement, training and deployment plan.

The above factors resulted in on-reef stoping square metres mined decreasing by 24% and primary development decreasing by 8% during the quarter. Primary development for the quarter was 1,683 metres. Sweepings increased by 137% from the previous quarter and tonness produced decreased by 16% to 1,365,911tonnes for the quarter (ROM tonnage excludes 34,797 tonnes transferred to Marikana).

Planned maintenance was performed on the K1 ball mill girth gear at the beginning of the quarter, while down-time as a result of the strike was used to undertake the relining of the primary and secondary mills of the K2 concentrator. Processed tonnes decreased by 18% to 1,323,505 tonnes with stockpiles at the end of the quarter totalling 57,116 tonnes.

Grade control initiatives increased the head grade by 2%, resulting in an average grade of 2.63g/t for the quarter despite a 7% decrease in the in situ grade. This was primarily due to a reduction in footwall waste and waste off-reef mining being packed underground. Recoveries also increased marginally to 79.1% due to improvement initiatives in operational stability and control.

PGM production decreased by 16% to 88,808 PGM ounces (44,404 ounces attributable to Aquarius).

Kroondal: Metal in concentrate produced (PGM ounces)

Quarter ended Pt Pd Rh Au PGMs Attributable to Aquarius Sep 2009 52,287 26,366 9,708 447 88,808 44,404 Jun 2009 62,535 31,158 11,492 535 105,720 52,860 Mar 2009 62,281 30,728 11,411 500 104,920 52,460 Dec 2008 65,075 32,161 11,941 530 109,707 54,854 Operating cash costs

Extensive management plans were implemented to mitigate the impact of the industrial action but cash costs per tonne increased by 16% to R392 and costs per PGM ounce increased by 13% to R5,847 as a result of the decrease in production. The quarter also carried the full electricity tariff increase of June 2009 as well as higher seasonal tariffs, resulting in a 44% increase in electricity cost despite lower consumption. Costs associated with the relining activities were also expensed during the quarter.

As a result of reduced revenue and higher unit costs, Kroondal Mine achieved a lower cash margin for the period of 19% compared with 34% in the previous quarter.

Kroondal: Operating cash costs per ounce

4E 6E 6E net of by-products (Pt+Pd+Rh+Au) (Pt+Pd+Rh+Ir+Ru+Au) (Ni&Cu) Kroondal 5,847 4,783 4,635 Capital expenditure

Capital expenditure for the quarter was R30 million, all stay-in-business capital. Major items included the establishment of underground infrastructure. This is a 57% reduction against the previous quarter, primarily due to cash curtailment during the strike period. The capital expenditure required to maintain production levels has been spent, however, and is up to date.

Firstplats transaction

The Firstplats transaction was concluded during the quarter, resulting in a pro-rata addition of 0.46 million ounces of reserves into the P&SA1, thereby extending the life-of-mine of Kroondal in excess of one year. The additional reserves are down-dip of central shaft and will be mined from existing shaft infrastructure requiring only stay-in-business capital expenditure and enabling cost efficient ore extraction (refer to the Corporate matter section for a more detailed description of the transaction).

P&SA2 at Marikana

Safety

The 12-month rolling average DIIR for the quarter deteriorated to 1.26 per 200,000 hours worked from 0.91 in the previous quarter. Five lost-time injuries were reported during the quarter. This deterioration is cause for concern and management measures have been implemented to reverse this trend.

Mining

Underground operations at Marikana were significantly affected by unprotected industrial action by MRC employees which resulted in the eventual dismissal of the workforce

Open-pit production and costs were affected by the pothole intersection reported in the previous quarter

Production tonnes increased by 0.15% to 551,944 tonnes, comprising 335,988 tonnes from underground and 216,006 tonnes from open-pit operations

Head grade decreased by 5% to 2.60 g/t due to the increase in underground tonnes

Processing

Tonnes processed decreased by 10% to 557,668 tonnes

Recoveries decreased by 3% to 67%

PGM production decreased by 17% to 31,222 ounces (15,611 ounces attributable to Aquarius)

Revenue

The Dollar-denominated Marikana basket price averaged $999 per PGM ounce, 7.7% higher than the previous quarter, while the Rand-Dollar exchange rate averaged R7.89 for the quarter. This resulted in the Marikana Rand-denominated basket price decreasing by 1.4% against the previous quarter. Pricing stability also contributed to lower PGM sales adjustments, which reduced from R50.1 million in Q4 (2009) to R26.7 million in Q1 (2010).

Quarterly revenue at Marikana decreased by 26% to R229 million (R115 million attributable to Aquarius) on the basis of lower production and a weaker basket price.

Operations

The quarter was significantly affected by the unprotected industrial action of the employees of the underground mining contractor, MRC on both of the Marikana shafts during September 2009. This unprotected industrial action took place despite a wage settlement of 10.2% having been agreed between MRC and the NUM, which eventually resulted in a mass dismissal of the workforce. As at Kroondal, disruptive and intimidatory action by former employees prevented effective recruitment from the dismissed employee base, requiring a greater component of those recruited to be new employees which delayed the engagement, training and deployment plan.

At both the No.1 and No.4 shafts, the focus remained on primary development and redevelopment to negate the effect of a high incidence of potholing and geological features. Primary development reduced by 10% from the previous quarter, and re-development was 20% lower as a result of the industrial action. The amount of mining currently done adjacent to potholes has negatively influenced the in-situ grade, leading to a much lower grade being mined. This was exacerbated by the focus on development after the industrial action, resulting in lower grades due to higher than normal waste contribution. The grade is expected to improve as stoping tonnes increase and panels move away from pothole areas.

Underground production increased by 6% from the previous quarter to 335,988 tonnes (tonnage includes 34,797 tonnes transferred from Kroondal).

Open-pit mining was affected by a significant pothole intersection in the ROM pit as identified during the previous quarter. Infill drilling was completed, confirming a reserve loss of approximately 170,000 tonnes due to thin reef in the pothole area. Establishment of the West-West pit was expedited in order to mitigate the production loss, with a 41% increase in the volume of waste bulk cubic metres moved during the period. The lower reef yield from the ROM pit and the establishment of the West-West pit resulted in the stripping ratio increasing to 28:1 during the quarter. This influenced the open-pit production cost, which increased by 19%, despite open-pit production decreasing by 8% to 216,006 tonnes on a quarter-on-quarter basis. The West-West Pit yielded predominantly shallow material and the production emphasis is to access lower mining levels for "fresh" reef which will become available in the next quarter.

Processed tonnes for the quarter were much lower due to ore availability resulting in oxide material being processed to maintain production. Volumes processed totalled 557,669 tonnes, 10% down on the previous quarter.

The head grade decreased by 5% to 2.60g/t due to the change in mining mix and lower-than-expected grade from underground as a result of geological anomalies.

Recoveries were also 3% lower at 67% compared with the previous quarter, primarily due to the oxide material and shallow material arising from the West-West pit.

PGM production for the quarter decreased by 17% to 31,222 PGM ounces (15,611 PGM ounces attributable to Aquarius).

Marikana: Metal in concentrate produced (PGM ounces)

Quarter ended Pt Pd Rh Au PGMs Attributable to Aquarius Sep 2009 19,515 8,407 3,100 200 31,222 15,611 Jun 2009 23,155 10,368 4,010 220 37,753 18,877 Mar 2009 23,673 10,908 4,034 236 38,851 19,426 Dec 2008 26,193 11,733 4,256 268 42,450 21,226 Operating cash costs

Cash costs per tonne increased by 12% to R442, while costs per PGM ounce increased by 22% to R7,899, a result of the production constraints of both the open pit and underground operations. The changes made to the open pit profile to negate the issues relating to ground conditions repeatedly filtered through to the open pit cost profile. The industrial action in September and subsequent loss in production from underground operations had a negative impact on unit costs. With the low output from the mining operations, the process plant could not be optimized, which in turn had a negative impact on the process plant and other fixed costs.

Gross revenue decreased by 26% to R229 million as a result of lower production and the strengthening of the Rand-Dollar exchange rate.

As a result, Marikana Mine shows a negative cash margin for the period of 8%.

Marikana: Operating cash costs per ounce

4E 6E 6E net of by-products (Pt+Pd+Rh+Au) (Pt+Pd+Rh+Ir+Ru+Au) (Ni&Cu) Marikana 7,899 6,524 6,317 Capital expenditure

Stay-in-business capital expenditure totalled R15.4 million, a reduction of 19%. This consisted primarily of underground infrastructure establishment. All critical capital expenditure is up to date.

Firstplats transaction

The Firstplats transaction was concluded during the quarter, resulting in an addition of 0.54 million ounces of reserves into the P&SA 2, thereby extending Marikana's life-of-mine in excess of two years. The additional reserves are contiguous to 1 and 4 shafts and will preclude the need for longer term vertical shafts, thereby very significantly reducing the life-of-mine capital requirement. (Refer to the Corporate matter section for a more detailed description of the transaction)

Contractor dispute with Moolman Mining

During March 2009, AQPSA and Moolman Mining agreed that the dispute relating to AQPSA resiling from the contract originally concluded between AQPSA and Moolman Mining on the basis of misrepresentation by Moolman Mining and Moolman Mining's conditional counter claims, would be referred to trial and would not be subject to arbitration. As a result, the original arbitration instituted by Moolman Mining against AQPSA relating to the application of the rise and fall formula in that contract, will be indefinitely suspended pending the outcome of the trial proceedings. This agreement was made an order of court with the consent of both parties and provisional dates in September 2010 have been allocated for the trial.

Everest Mine

The DMR has removed the original suspension instruction (section 54 notice) which was issued after the suspension of operations at Everest, allowing normal mining operations to resume.

Phase 1 of the re-establishment project commenced in June 2009 with the excavation of the North box cut, storm water earthworks, the installation of temporary services and an access road. The North box cut excavation was completed at the end of the quarter. The mining team is in the process of supporting the high wall following which the development of the three declines will begin. The South box cut will be excavated during quarter 2 with the single end development planned to begin towards the end of the quarter.

Phase 1 was specifically scoped to be completed in the period before the start of the rainy season and the decline shafts are planned to hole with the current mine in May 2010.

Compilation of the detail engineering designs associated with Phase 2 is in process, and preliminary capital budget estimates (CBE) are being finalised. The capital requirement for the entire project (including Phase 1) will be approximately R259 million. The project includes the establishment of permanent underground services, the reclamation of infrastructure, the equipping of declines and strike sections and the re-establishment of stoping sections. Permanent surface infrastructure, such as mine services, roads and overland conveyers, will also be completed during this phase. This preparation, coupled with early production from the open pit operation, will enable ramp-up of underground production, with reef stockpiling prior to resumption of milling operations. Completion of Phase 2 and production ramp-up to process plant resumption will require approximately 10 months.

Project execution is proceeding as anticipated to place Everest in a state of readiness to resume operations. The decision to resume operations will, however, be made in the context of prevailing metals prices and market conditions at the time.

MIMOSA INVESTMENTS (Aquarius Platinum 50%)

Mimosa Platinum MineSafety

The 12-month rolling average DIIR for the quarter remained stable at 0.10 from the previous quarter. Two lost-time injuries were recorded during the quarter.

Mining

Underground production increased by 3% to 539,475 tonnes

Head grade decreased slightly by 0.28% to 3.59g/t

The surface stockpile decreased to a total 196,075 tonnes at the end of the quarter, equivalent to almost one-month mill feed

Processing

Concentrator plant recoveries increased to 76.3% from 75.3%

Total mine production increased by 8% to 50,828 PGM ounces (Aquarius share: 25,414 PGM ounces)

Revenue

The average achieved PGM basket price for the quarter increased by 7% to $805 per PGM ounce. The average achieved nickel price over the quarter increased by 42% to $6.86 per pound from $4.84 per pound the previous quarter. Revenue for the quarter increased to $44.2 million, with base metals accounting for approximately 25% of revenue. The cash margin increased to 36% from 28% in the previous quarter, mainly due to the firming of metal prices.

Operations

During the quarter mining operations hoisted 539,475 tonnes compared to 525,682 tonnes in the previous quarter. Tonnes milled during the quarter totalled 576,616 tonnes, with 37,141 tonnes being taken from the stockpile, which totalled 196,075 tonnes at the quarter end.

The average plant grade decreased marginally to 3.59g/t, compared to 3.60g/t in the previous quarter.

Tonnes processed totalled 576,616, a 7% increase compared to the previous quarter. Recoveries for the quarter increased slightly to 76.3% from 75.3%.

PGM production during the quarter increased by 8% to 50,828 ounces (25,414 ounces attributable to Aquarius).

Mimosa: PGMs in concentrate produced (ounces)

Quarter ended Pt Pd Rh Au PGMs Attributable to Aquarius Sep 2009 25,691 19,569 2,096 3,473 50,829 25,414 Jun 2009 23,910 17,979 1,851 3,135 46,875 23,437 Mar 2009 23,590 17,905 1,797 2,986 46,278 23,139 Dec 2008 21,903 16,678 1,753 2,898 43,232 21,616

Mimosa: Base metals in concentrate produced (tons)

Mine production Attributable to Aquarius Quarter ended Ni Cu Co Ni Cu Co Sep 2009 705 572 19 352.5 286.0 9.5 Jun 2009 667 534 18 333.5 267.0 9 Mar 2009 659 545 18 329.5 272.5 9 Dec 2008 615 497 18 307.5 248.5 9 Operating cash costs

Cash costs per ROM tonne remained static at $49, while costs per PGM ounce declined slightly to $561.

The gross cash margin increased to 36% from 28% in the previous quarter mainly due to the firming of PGM basket prices. Net of by-products, cash costs were $318 per PGM ounce, compared with $379 per PGM ounce in the previous quarter, primarily due to a rise in the prices of base metals.

Mimosa operating cash costs per ounce

4E 6E 4E net of by-products (Pt+Pd+Rh+Au) (Pt+Pd+Rh+Ir+Ru+Au) (Ni, Cu & Co) Mimosa 562 534 317

Update on foreign currency regime in Zimbabwe

Since the introduction of the use of multi-currencies in the economy in January 2009, there have not been any changes in the foreign currency environment. The US Dollar and the South African Rand remain the most widely used currencies in the economy. Any changes to the foreign currency environment that may come will be announced in the 2010 Fiscal Budget expected during the second quarter.

AQUARIUS PLATINUM (SA) CORPORATE SERVICES (PTY) LTD

Chromite Tailings Retreatment Plant (CTRP) (Aquarius Platinum 50%)

SafetyThe DIIR remained at 0. Processing

Material processed decreased marginally to 68,894 tonnes

Grade remained stable at 2.20g/t

Recoveries increased by 14% to 36%

Production increased to 1,740 PGM ounces (870 PGM ounces attributable to Aquarius)

Revenue

The achieved mine basket price for the quarter averaged $1,074 per PGM ounce, 8% higher than the previous quarter. The achieved mine Rand-Dollar exchange rate averaged R7.89/$ for the quarter.

Operations

Material processed decreased to 68,894 tonnes. This was due to the repositioning of the reclamation facilities on the chrome dump source.

The head grade remained stable at 2.20g/t.

Recoveries increased by 16% to 36%. This resulted in production being up 3% to 1,740 PGM ounces (Aquarius attributable: 870 PGM ounces).

CTRP: Metal in concentrate produced (PGM ounces)

Quarter ended Pt Pd Rh Au PGMs (4E) Sep 2009 1,048 381 308 3 1,740 Jun 2009 1,024 369 292 4 1,689 Mar 2009 966 351 267 3 1,587 Dec 2008 1,078 404 297 4 1,783 Operating costs

Cash costs increased by 26% to R3,380 per PGM ounce. This is mainly attributable to maintenance on the Deswik mill. The cash margin for the period was 42%, a decrease from 49% in the previous quarter.

CTRP Operating cash costs per ounce

4E 6E 4E net of by-products (Pt+Pd+Rh+Au) (Pt+Pd+Rh+Ir+Ru+Au) (Ni, Cu& Co) CTRP 3,380 2,293 2,194

Platinum Mile (Aquarius Platinum 50%)

Safety

The DIIR was zero for the quarter.

Processing

Tailings processed totalled 1,977 million tonnes which was consistent with the 2,101 million tonnes processed in the previous quarter

PGM grade was 0.69g/t, an increase of 17% on the previous quarter

Milling expansion yielding anticipated results

Production was 5,932 PGM ounces (2,966 PGM ounces attributable to Aquarius)

Revenue

The achieved mine basket price for the quarter averaged $1,004 per PGM ounce, 8% higher than the previous quarter, and together with improved production results, helped to increase revenue by 33%. The achieved mine Rand-Dollar exchange rate averaged R7.78/$ for the quarter. Quarterly revenue increased by 33% to R40 million (Aquarius attributable: R20 million).

Operations

Production levels increased by 32% during the quarter. The completion of the milling expansion is now yielding the anticipated results. Full monthly production rates were achieved during September 2009.

During the quarter the feed head grade increased to 0.69g/t compared to 0.59g/t the previous quarter.

Recoveries increased to 14% compared to 11% in the previous quarter. As a result, production increased 32% to 5,932 PGM ounces (Aquarius attributable: 2,966 ounces). Target production at Platinum Mile remains 35,000 ounces per annum. A table of monthly production statistics indicating the improved recoveries follows, illustrating the achievement of the milling expansion benefits.

Platinum Mile: Monthly tonnes and recoveries

Jul 09 Aug 09 Sep 09 Tons 650,688 706,262 620,017 Grade 0.73 0.66 0.69 Production ounces 1,116 1,885 2,930 Recovery % 7% 13% 21%

Platinum Mile: Metal in concentrate produced (PGM ounces)

Quarter ended Pt Pd Rh Au PGMs (4E) Sep 2009 3,440 1,839 534 119 5,932 Jun 2009 2,598 1,388 403 90 4,479 Mar 2009 1,617 864 251 56 2,788 Dec 2008 1,799 962 279 63 3,103 Operating costs

Cash costs increased 13% to R3,157 per PGM ounce, largely as a result of the increase in power costs from Eskom.

Platinum Mile operating cash costs per ounce

4E 6E 4E net of by-products (Pt+Pd+Rh+Au) (Pt+Pd+Rh+Ir+Ru+Au) (Ni, Cu& Co) Platinum Mile 3,157 Nm Nm Capital expenditure

Capital expenditure for the quarter was R1.5 million. The expansion and fine milling project is now complete and within the budget of R59 million.

Blue Ridge Platinum

Safety

The 12-month rolling average DIIR for the quarter deteriorated to 0.47 from 0.32 in the previous quarter. Five lost-time injuries were reported during the quarter.

Mining

Underground operations produced 191,968 tonnes during the period

Head grade averaged 2.58g/t

Stockpiles at the end of the quarter totalled 279,832 tonnes

Processing

Tonnes processed for the quarter was 269,008 tons

Recoveries of 76.6% were achieved at the end of the period

14,469 PGM ounces were produced

Revenue

The achieved mine basket price for the quarter averaged $970 per PGM ounce with a Rand/Dollar exchange rate of R7.90/$ for the quarter. Consequently revenue was R102 million for the quarter (Aquarius attributable: R51 million). All revenue is off-set (capitalised) against the project cost, therefore no revenue is recognised in the income statement.

Operations

Development totalled 2,591 metres for the period with the decline and level development performing to target. Equipping of the main conveyor decline is on track with installation of all services completed on schedule.

Underground mining progressed well during the quarter with 191,968 tonnes being produced. Underground mining is ramping up as planned and no significant geological or mining problems have been experienced. Stoping teams are being recruited and trained as stoping panels are being made available by the development teams.

The restructuring of the operation to reduce the fixed cost base was finalised and the retrenchment of excess services employees was completed at the end of the quarter.

The plant commissioning experienced interruptions during the commissioning phase and 269,008 tonnes were processed during the quarter. These interruptions are normal during the commissioning phase, and process plant availability and stability is expected to improve. A steady ramp-up in tonnage throughput is anticipated in the next quarter. Concentrator throughput in the quarter was supported by stockpile consumption as planned.Stockpiles at the end of the quarter were 279,832 tons, consisting predominantly of previously mined development material.

The head grade averaged 2.58g/t for the quarter, influenced by the consumption of lower-grade development stockpile material.

PGM production was 14,469 PGM ounces (Aquarius attributable: 7,235 ounces).

Blue Ridge: Metal in concentrate produced (PGM ounces)

Quarter Pt Pd Rh Au PGMs Attributable to ended

(4E) Aquarius

Sep 2009 8,598 4,383 1,347 141 14,469 7,235

Jun 2009 - - - - - - Mar 2009 - - - - - - Dec 2008 - - - - - - Operating cash costs

Operating costs will continue to be capitalised during the ramp-up phase.

Gross revenue increased by 400% to R102 million, principally as a result of the increase in ounce production.

Capital expenditure

Capital expenditure for the quarter was R27 million, mainly on the completion of capital projects e.g. an 3MVA power line, service water dams, critical spares for the plant and increasing infrastructure underground.

CORPORATE MATTERS

Completion of Recommended All-Share Offer for Ridge Mining plc

In July, Aquarius completed the scheme of arrangement relating to the recommended all share acquisition of Ridge in accordance with the terms outlined in the prospectus issued on 31 March 2009. Aquarius issued 34,087,945 common shares on the basis of 1 Aquarius share for every 2.75 Ridge shares in issue. Ridge Mining is now 100%-owned by Aquarius Platinum Limited. More information and a full prospectus can be found at www.aquariusplatinum.com

As part of the Ridge Mining plc (Ridge) transaction, and as disclosed in the prospectus on 30 March 2009, Zijin Mining Group Company (Zijin) and Imbani Platinum (Pty) Ltd (Imbani) exercised their existing holdings in Ridge for new fully paid common shares in Aquarius. These holdings were in existence prior to the scheme of arrangement between Ridge and its shareholders relating to the all share acquisition by Aquarius of Ridge.

On 27 August, Zijin exercised 7,000,000 Ridge warrants for 2,545,454 Aquarius shares. These were issued to Zijin's wholly-owned subsidiary Gold Mountains (H.K.) International Mining Co., Limited on the basis of 1 Aquarius share for every 2.75 Ridge shares.

On 8 September, Imbani exercised 25,000,000 Ridge options for 9,090,909 Aquarius shares on the basis of 1 Aquarius share for every 2.75 Ridge shares. The aggregate exercise price of these options is GBP17.5 million (GBP0.70 per Ridge option).

During the quarter, Aquarius issued 471,849 new fully paid common shares to former employees of Ridge, following the exercise of Ridge employee options and the subsequent transfer of the resulting 1,297,590 Ridge shares to Aquarius on the basis of 1 Aquarius share for every 2.75 Ridge share.

Conclusion of Firstplats transaction

The transaction to acquire the mining assets of First Platinum (Pty) Ltd and Salene Mining (Pty) Ltd, known collectively as "FirstPlats" was concluded during the quarter.

TheFirstPlats assets have a combined reserve base of 0.54 million PGM ounces. Aquarius will add the additional reserves and FirstPlats mining infrastructure to the Marikana P&SA 2, with the P&SA partner contributing a pro-rata addition of 0.46 million ounces that will be added to the Kroondal Mine, P&SA 1. In total, the additional reserves will extend the life of mine at Marikana by in excess of two years and Kroondal by just more than one year. The P&SA 1 reserve base contribution is contiguous to Kroondal Mine.

The FirstPlats assets are strategically important to Marikana Mine because the ground is contiguous with current operations and provides significant infrastructure cost savings with the ongoing development of the mine. The total consideration to FirstPlats is 2,732,000 new shares in Aquarius Platinum (representing 0.6% of the enlarged share capital of Aquarius) to be issued at nominal value on fulfilment of the Conditions Precedent.

The FirstPlats assets, privately held by First Platinum and Salene Mining, are contiguous with Aquarius' Marikana operations. The assets have a reserve base of 0.55 million ounces from 5.22 million tonnes with an average grade of 3.28 g /t PGM. The acquisition of the FirstPlats assets includes both the FirstPlats and the Salene old order mining rights, the surface rights of both companies and the fixed and movable assets of both companies, inclusive of installed power of 10MVA, from Eskom. There are two declines bordering the Marikana mine, which have been developed since 2004.

The operations had a combined design capacity of 50,000 ROM tonnes per month. The Firstplats assets have been on care and maintenance for the last three years, principally due to the lack of critical mass and market conditions.

A total of 2,732,000 million new Aquarius shares will be issued to the shareholders of FirstPlats on the LSE, equal to 0.59%, of the total number of issues shares in Aquarius of 461,647,961. The shares will be issued on completion of the conditions precedent set out below. This values the issue at 8.2m (equal to approximately R100 million at an exchange rate of 1:R12.30).

The addition of the FirstPlats and P&SA 1 reserves are value enhancing for a number of reasons:

Reserves of 540,000 4PGE ounces, further extending life of Marikana P&SA II by in excess of two years.

Shallow reserves that can be mined by Aquarius' established cost-effective mechanised mining methods.

Reserves are adjacent and contiguous with Marikana P&SA 2 mining areas.

FirstPlats location and infrastructure permits rapid down-dip access into Marikana P&SA 2 reserves and very significantly lowers life-of-mine capital requirements.

Existing old order mining rights still remain valid, enabling immediate access to Aquarius, under the contract mining agreements, while application for new order rights in process.

Kroondal P&SA 1 contribution will add 460,000 4PGE ounces to Kroondal.

Estimated to extend the Kroondal P&SA 1 mine life by just over a year.

Property contiguous to Kroondal Central and East mining areas, enabling low cost access and extraction from existing infrastructure.

Approval has been received from the South African Competition Commission.

Aquarius Platinum LimitedIncorporated in BermudaExempt company number 26290Board of DirectorsNicholas Sibley Non-executive Chairman Stuart Murray Chief Executive Officer David Dix Non-executive

Timothy Freshwater Non-executive

Edward Haslam Non-executive

Sir William Purves Non-executive

Kofi Morna Non-executive

Zwelakhe Mankazana Non-executive

Audit/Risk CommitteeSir William Purves (Chairman)David DixEdward HaslamNicholas Sibley

Remuneration/Succession Planning Committee

Edward Haslam (Chairman)Nicholas SibleyNomination Committee

The full Board comprises the Nomination Committee

Company SecretaryWilli BoehmAQPSA ManagementStuart Murray Executive Chairman Hugo Holl Managing Director Helene Nolte Director: Finance Hulme Scholes Commercial Director Anton Lubbe Operations Director: West Anton Wheeler Operations Director: East Graham Ferreira General Manager: Group Admin & Company Secretary Mkhululi Duka General Manager: Group Human Resources & Transformation Abraham van Ghent General Manager: Kroondal Wessel Phumo General Manager: Marikana Gabriel de Wet General Manager: Engineering Augustine Simbanegavi General Manager: Everest Anthony Joubert General Manager: Blue Ridge ACS (SA) Management

Paul Smith Director: New Business

Mimosa Mine Management

Winston Chitando Managing Director Herbert Mashanyare Technical Director Peter Chimboza Resident Director Fungai Makoni General Manager & Company Secretary

Platinum Mile Management

Richard Atkinson Managing Director

Paul Swart Financial Director

Issued Capital

At 30 September 2009, the Company had on issue: 461,647,961 shares fully paid common shares and 1,128,125 unlisted options.

Substantial Shareholders 30 September 2009 Number of Shares Percentage

Savannah Consortium 68,658,728 14.87

HSBC Custody Nominees (Australia) Limited 29,330,983 6.35

Trading InformationISIN number BMG0440M1284ADR ISIN number US03840M2089Convertible Bond ISIN number BMG0440M1284Broker (LSE) (Joint) Broker (ASX) Sponsor (JSE) Liberum Capital Limited City Point, 1 Ropemaker Street, London, EC2Y 9HT Euroz Securities Rand Merchant Bank Telephone: +44 (0) 20 3100 Level 14, The (A division of FirstRand 2000 Quadrant Bank Limited) 1 William Street, 1 Merchant Place Merrill Lynch Bank of Perth WA 6000 Cnr of Rivonia Rd and America Telephone: +61 Fredman Drive, Sandton 2146 2 King Edward St (0) 8 9488 1400 Johannesburg South Africa London, EC1A 1HQ Telephone: +44 (0)20 7628 1000

Aquarius Platinum (South Africa) (Proprietary) Ltd

100% Owned (At 31 March 2009)

(Incorporated in the Republic of South Africa)

Registration Number 2000/000341/07

1st Floor, Building 5, Harrowdene Office Park, Western Service Road, Woodmead2191, South AfricaPostal Address: PO Box 76575, Wendywood, 2144,South Africa.Telephone: +27 (0)11 656 1140Facsimile: +27 (0)11 802 0990

Aquarius Platinum Corporate Services Pty Ltd

100% Owned

(Incorporated in Australia)

ACN 094 425 555

Level 4, Suite 5, South Shore Centre, 85 The Esplanade, South Perth, WA 6151,AustraliaPostal Address: PO Box 485, South Perth, WA6151, AustraliaTelephone: +61 (0)8 9367 5211Facsimile: +61 (0)8 9367 5233Email: info@aquariusplatinum.com

For further information please visit aquariusplatinum.com or contact:

In AustraliaWilli Boehm+61 (0)8 9367 5211

In the United Kingdom and South Africa

Stuart MurrayHugo Holl+ 27 11 656 1140GlossaryA$ Australian Dollar Aquarius Aquarius Platinum Limited ABET Adult Basic Education Training programme APS Aquarius Platinum Corporate Services Pty Ltd AQPSA Aquarius Platinum (South Africa) Pty Ltd ACS (SA) Aquarius Platinum (SA) (Corporate Services) (Pty) Limited BEE Black Economic Empowerment BRPM Blue Ridge Platinum Mine CTRP Chromite Ore Tailings Retreatment Operation. Consortium comprising Aquarius Platinum (SA) (Corporate Services) (Pty) Limited (ASACS), Ivanhoe Nickel and Platinum Limited and Sylvania South Africa (Pty) Ltd (SLVSA). DIFR Disabling injury frequency rate - being the number of lost-time injuries expressed as a rate per 1,000,000 man-hours worked DIIR Disabling injury incidence rate - being the number of lost-time injuries expressed as a rate per 200,000 man-hours worked DME former South African Government Department of Minerals and Energy Affairs DMR South African Government Department of Mineral Resources and Energy, formerly the DME Dollar United States Dollar or $ EMPR Environmental Management Programme Report Everest Everest Platinum Mine Great A PGE bearing layer within the Great Dyke Complex in Zimbabwe Dyke Reef g/t Grams per tonne, measurement unit of grade (1g/t = 1 part per million) JORC Australasian code for reporting of Mineral Resources and Ore Reserves code JSE JSE Limited Kroondal Kroondal Platinum Mine or P&SA1 at Kroondal LHD Load haul dump machine Marikana Marikana Platinum Mine or P&SA2 at Marikana Mimosa Mimosa Mining Company (Private) Limited MRC Murray & Roberts Cementation, principal mining contractor at Kroondal nm Not measured NOSA National Occupational Safety Association NUM South African National Union of Mineworkers

PGE(s) Platinum group elements plus gold. Five metallic elements commonly (6E) found together which constitute the platinoids (excluding Os

(osmium)). These are Pt (platinum), Pd (palladium), Rh (rhodium), Ru

(ruthenium), Ir (iridium) plus Au (gold)

PGM(s) Platinum group metals plus gold. Aquarius reports the PGMs as (4E) comprising Pt+Pd+Rh plus Au (gold) with the Pt, Pd and Rh being the

most economic platinoids in the UG2 Reef

P&SA1 Pooling & Sharing Agreement between AQPSA and RPM Ltd on Kroondal

P&SA2 Pooling & Sharing Agreement between AQPSA and RPM Ltd on Marikana

R South African Rand Redpath Redpath Mining South Africa Pty Ltd. Ridge Ridge Mining plc ROM Run of mine. The ore from mining which is fed to the concentrator plant. This is usually a mixture of UG2 ore and waste. RPM Rustenburg Platinum Mines Limited

SavCon The Savannah Consortium - the principal Black Empowerment Investor in

Aquarius Platinum TKO TKO Investment Holdings Limited Tonne 1 Metric tonne (1,000kg)

UG2 Reef A PGE-bearing chromite layer within the Critical Zone of the Bushveld

Complex

Z$ Zimbabwe Dollar

vendor
Date   Source Headline
13th Apr 20168:41 amPRNCancellation of Listing
11th Apr 20168:31 amPRNConversion Rates for Payment to Aquarius Shareholders
5th Apr 20167:19 amPRNPayments to Aquarius Shareholders
5th Apr 20167:00 amPRNSuspension of Listing of Aquarius Platinum Limited
4th Apr 20167:30 amRNSTemporary Suspension- Aquarius Platinum Limited
1st Apr 20169:50 amPRNDirector/PDMR Shareholding
1st Apr 20169:46 amPRNDirector/PDMR Shareholding
1st Apr 20169:45 amPRNDirector/PDMR Shareholding
1st Apr 20169:45 amPRNDirector/PDMR Shareholding
1st Apr 20169:40 amPRNDirector/PDMR Shareholding
1st Apr 20169:40 amPRNDirector/PDMR Shareholding
1st Apr 20169:33 amPRNDirector/PDMR Shareholding
24th Mar 20167:12 amPRNConditions Fulfilment occurs for Sibanye Transaction
23rd Mar 20168:47 amPRNTimetable & Details re Sibanye Transaction
22nd Mar 20167:56 amPRNFurther re transaction with Sibanye
17th Mar 20167:00 amPRNSibanye Transaction receives SA Competition approval
17th Feb 20169:02 amPRNHolding(s) in Company
9th Feb 20169:00 amPRNHalf-yearly Results to 31 December 2015
3rd Feb 20168:28 amPRNBoard of Directors - David Dix
28th Jan 20167:00 amPRNProduction Results to 31 December 2015
18th Jan 20162:30 pmPRNResult of AGM
18th Jan 20162:30 pmPRNResults - Amalgamation Meeting
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
6th Jan 20168:00 amPRNDirector/PDMR Shareholding
5th Jan 20168:00 amPRNFatal accident at Mimosa Platinum Mine
21st Dec 20157:30 amPRNRedemption of Convertible Bonds
14th Dec 20153:10 pmPRNNotice of Amalgamation Meeting & Annual General Meeting
8th Dec 20159:03 amPRNHolding(s) in Company
30th Nov 20157:00 amPRNUpdate re Sibanye Offer
30th Oct 20157:00 amPRNAnnual Report 2015
27th Oct 20157:00 amPRNFirst Quarter 2016: Production and Financial Results
9th Oct 20159:29 amPRNDirector/PDMR Shareholding
9th Oct 20159:29 amPRNDirector/PDMR Shareholding
9th Oct 20159:21 amPRNDirector/PDMR Shareholding
9th Oct 20159:18 amPRNDirector/PDMR Shareholding
9th Oct 20159:15 amPRNDirector/PDMR Shareholding
9th Oct 20159:12 amPRNDirector/PDMR Shareholding
9th Oct 20159:09 amPRNDirector/PDMR Shareholding
9th Oct 20159:05 amPRNDirector/PDMR Shareholding
6th Oct 20159:20 amPRNImplementation/Amalgamation agreements re Sibanye offer
6th Oct 20158:27 amPRNOffer by Sibanye Gold Limited
2nd Oct 20157:00 amPRNFurther re Sale of Everest Mine
30th Sep 20159:03 amPRNFinancial Statements for the year ended 30 June 2015
1st Sep 20153:00 pmPRNDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.