Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAOGL.L Regulatory News (AOGL)

  • There is currently no data for AOGL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update from Stockdale Field

20 Apr 2018 07:00

RNS Number : 5403L
Mayan Energy Limited
20 April 2018
 

 

Mayan Energy Ltd / Index: AIM / Epic: MYN/ ISIN: VGG6622A1057 / Sector: Oil and Gas

 

20 April 2018

Mayan Energy Ltd ("Mayan" or "the Company")

Operations Update - Stockdale Field

 

Mayan (AIM: MYN), the AIM listed oil and gas company, is pleased to announce an update on its ongoing activities to significantly enhance production at the Morris #1 well ('the Well') at Stockdale Field, Wilson County, Texas in which the Company has a 60.0% working interest (WI) and 45.0% net revenue interest (NRI). This forms part of a multi-well low cost workover programme occurring across Mayan's portfolio of Texan assets to increase net production to 300-500bopd in the medium term.

 

As part of its strategy to increase production at the Morris#1 well, on 13 February 2018 the Company announced its plans to acidise and commingle the Upper and Lower Anacacho formations at the Morris#1 well, which has now been completed. Furthermore, as announced on 4 April 2018, the Morris #1 well was shut whilst work on the water injection well was completed, which has now taken place (prior to this it was producing at a rate of 24-26 barrels of oil per day from the Upper Anacacho). Prior to acidising and commingling the Upper and Lower Anacacho, there was a spike in gas pressure in the Well (kick), which resulted in the recovery of 92 barrels of crude oil over a period of 6 hours from the upper Anacacho.

 

Acidisation and commingling of the Lower and Upper Anacacho zones was completed on Wednesday, 18 April 2018 and whilst work on the salt water injection well has also now been completed, the Well remains shut-in to allow it to pressurise ahead of a planned swab-test to determine appropriate downhole pump size for optimal production performance. Following this, the appropriate downhole pump will be placed on the Well. The Company will update the market once the production rate from the Morris #1 has stabilised.

 

Eddie Gonzalez, Managing Director, said: "The solid performance of the Upper Anacacho prior to acidisation and commingling reaffirms our initial test results from the Morris #1. The acidisation and commingling operations to combine the production potential of the Lower Anacacho with the Upper went smoothly and we are eagerly anticipating results from our swab test and further production as we initiate continuous production with the downhole pump we are installing.

 

"I expect the Morris #1 to contribute materially to Mayan's daily production and cash flow and with WTI Crude Oil at better than US$68 per barrel the robust base of production we are continuing to build should perform exceptionally for the company over the next few months. I look forward to updating the market shortly on the exciting developments with the Morris #1."

 

Special note concerning the Market Abuse Regulation

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No 596/2014 ("MAR").

 

**ENDS**

 

For further information visit www.Mayanenergy.com or contact the following:

Eddie Gonzalez

Mayan Energy Ltd

+ 1 469 394 2008

Charlie Wood

Mayan Energy Ltd

+44 7971 444 326

Roland Cornish

Beaumont Cornish Ltd

+44 20 7628 3396

James Biddle

Beaumont Cornish Ltd

+44 20 7628 3396

Nick Bealer

Cornhill Capital Limited

+44 20 7710 9612

 

 

 

 

Notes:

Mayan Energy Limited is an AIM listed (London Stock Exchange) oil and gas energy Company; focussed on the redevelopment and enhancement of its upstream oil and gas interests in Oklahoma and Texas.

 

Technical sign off

All of the technical information, including information in relation to reserves and resources that is contained in this announcement has been reviewed by, Mr Stephen Brock. Mr Brock is a production engineer and member of the Society of Petroleum Engineers who is a suitably qualified person with over 20 years' experience in assessing hydrocarbon reserves and has reviewed the release and consents to the inclusion of the technical information.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGGURPCUPRPGB
Date   Source Headline
17th Sep 20193:23 pmRNSUpdate on Investee Company: Petroteq
13th Sep 20192:00 pmRNSInterview with Chief Operating Officer
6th Sep 20197:00 amRNSUpdate on Investee Company: Petroteq
29th Aug 20193:34 pmRNSUpdate on Investee Company: Petroteq Update
28th Aug 20197:00 amRNSFurther Contract for Oil Services Division
19th Aug 20193:00 pmRNSPetroteq Energy Inc. Update
14th Aug 20197:00 amRNSService Division and Operations Update
31st Jul 20198:53 amRNSUpdate on timing of Technical Studies
11th Jul 20191:53 pmRNSResult of AGM
11th Jul 20197:00 amRNSAGM Statement
4th Jul 20198:00 amRNSUpdated Corporate Presentation
4th Jul 20197:00 amRNSGrant of Options
21st Jun 201911:03 amRNSNotice of AGM
11th Jun 20191:10 pmRNSISIN effective date
11th Jun 20197:01 amRNSBoard Changes and Change of Name
11th Jun 20197:00 amRNSFinal Results
7th Jun 20197:00 amRNSOperational Update
31st May 20195:33 pmRNSTotal Voting Rights
10th May 201910:27 amRNSHolding(s) in Company
10th May 20198:31 amRNSHolding(s) in Company
9th May 20195:13 pmRNSHolding(s) in Company
9th May 20195:10 pmRNSHolding(s) in Company
30th Apr 20197:57 amRNSCompletion of Placing
30th Apr 20197:56 amRNSReplacement: Attis Acquisition
30th Apr 20197:00 amRNSAcquisition, Board Change, Raise & Name Change
15th Apr 20197:00 amRNSOperations Update
12th Apr 20192:05 pmRNSSecond Price Monitoring Extn
12th Apr 20192:00 pmRNSPrice Monitoring Extension
3rd Apr 20195:00 pmRNSPetroteq Energy Inc. Update
29th Mar 20191:00 pmRNSPetroteq Energy Inc. Update
26th Mar 20194:36 pmRNSHolding(s) in Company
18th Mar 20194:30 pmRNSPetroteq Energy Inc. Update
28th Feb 20197:00 amRNSAustin Field Update
21st Feb 20192:57 pmRNSPetroteq Energy Inc. Update
13th Feb 20194:07 pmRNSHolding(s) in Company
13th Feb 20199:50 amRNSHolding(s) in Company
11th Feb 201912:00 pmRNSPetroteq Energy Inc Update
8th Feb 201910:30 amRNSIssue of Equity
30th Jan 20197:00 amRNSUpdated Corporate Presentation
29th Jan 20197:10 amRNSUpdate and Equity Raise
31st Dec 20187:00 amRNSCorporate and Operational Update
29th Nov 20187:00 amRNSBoard Appointment and Corporate Update
20th Nov 201810:45 amRNSUpdate on Investee Company: Block Energy
20th Nov 201810:45 amRNSHoldings in Company
15th Nov 20187:00 amRNSPetroteq Energy Inc Update
7th Nov 20188:00 amRNSPetroteq Energy Inc Update
25th Oct 20187:00 amRNSDistribution of Petroteq Shares and Warrants
17th Oct 201810:25 amRNSIssue of Equity
11th Oct 201812:52 pmRNSResult of AGM
9th Oct 20187:00 amRNSUpdate From Chairman

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.