SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAOGL.L Regulatory News (AOGL)

  • There is currently no data for AOGL

Operations Update

19 Oct 2017 14:23

RNS Number : 1134U
Mayan Energy Limited
19 October 2017
 

19 October 2017

 

Mayan Energy Ltd / Index: AIM / Epic: MYN/ ISIN: VGG6622A1057 / Sector: Oil and Gas

 

Mayan Energy Ltd ("Mayan" or "the Company")

Operations Update, Production in Stockdale Field

 

Mayan (AIM: MYN), the US onshore focused oil and gas development company, is pleased to provide an operational update across its interests. This includes the restoration of production at the Morris #1 well ('Morris1' or 'the Well') at the Stockdale Field, Wilson County, Texas in which the Company has an 60% working interest ('WI') and 45% net revenue interest ('NRI'). 

 

Restoration of production at the Morris1 Well at the Stockdale Field

The Well produced a total of 74 barrels of crude oil at an average of approximately 4 barrels per hour during an 18 hour period over three days

Following restoration of the Well's electric infrastructure, water handling is being added to enable continuous production

Follow-up testing has confirmed significant reservoir pressure at the Well with the static fluid level measured at 110 metres from the surface

As the reservoir is a fractured carbonate, production at the Well is to be optimised to deliver the average field level EUR of over 80,000 barrels per well via an acid stimulation

There are 10 wells within the Stockdale Field suitable for work over; the Morris1 Well being the first well expected to recommence production on the Field

 

Forest Hill Field, Wood County, Texas (70% WI and 52.5% NRI)

Initiation of work programme at Forest Hill Field - restoration of the electric service and access to salt water disposal facilities has been completed 

Three wells have been pumped up with good pressure and fluid levels with flow test to commence shortly

There are 30 wells within the Forest Hill Field suitable for work over with a conservative average field level EUR of 50,000 barrels per well

 

Zink Ranch Field, Osage County Oklahoma

Workover planned at Zink Ranch in coming weeks to test the Prue formation in select existing well bores 

 

Shoats Creek Field, Louisiana

Management expects to access the Shoats Creek field in the next week shortly to enable re-starting production at the LM 20 well

 

Eddie Gonzalez, Managing Director, said: "The initial results at the Stockdale Field begin to validate our new strategy and asset focus, which is firstly to acquire underperforming assets in Texas and Oklahoma, and then enhance production by applying the expertise of our new team and the specialised technology we now have at our command. With operations at Forest Hill Field now underway and work due to commence shortly at Zink Ranch and Shoats Creek, this is an exciting time for the Company. We are well on our way towards becoming a cash flow positive company with a healthy balance sheet and new growth opportunities appropriate for Mayan."

 

Special note concerning the Market Abuse Regulation

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No 596/2014 ("MAR"). Market soundings, as defined in MAR, were taken in respect of the Subscription, with the result that certain persons became aware of inside information, as permitted by MAR. That inside information is set out in this announcement. Therefore, those persons that received inside information in a market sounding are no longer in possession of inside information relating to the Company and its securities.

 

All of the technical information, including information in relation to reserves and resources that is contained in this announcement has been reviewed by, Mr John Ladd. Mr Ladd is a petroleum engineer who is a suitably qualified person with over 30 years' experience in assessing hydrocarbon reserves and has reviewed the release and consents to the inclusion of the technical information.

 

Technical Glossary

bopd

means barrels of oil per day. There are 42 gallons (approximately 159 litres) in one barrel of oil, which will contain approximately 5.8 million British Thermal Units.

 

EUR

Estimated ultimate recovery (EUR) is an approximation of the quantity of oil or gas that is

potentially recoverable or has already been recovered from a reserve or well.

 

Workover

The process of performing major maintenance or remedial treatments on an oil or gas well. In many cases, workover implies the removal and replacement of the production tubing string after the well has been killed and a workover rig has been placed on location. This operation saves considerable time and expense.

 

 

 

**ENDS**

 

For further information visit www.Mayanenergy.com or contact the following:

 

Eddie Gonzalez

Mayan Energy Ltd

+ 1 469 394 2008

Charlie Wood

Mayan Energy Ltd

+44 7971 444 326

Roland Cornish

Beaumont Cornish Ltd

+44 20 7628 3396

James Biddle

Beaumont Cornish Ltd

+44 20 7628 3396

Nick Bealer

Cornhill Capital Limited

+44 20 7710 9612

 

 

 

 

Notes:

Mayan Energy Limited is an AIM listed (London Stock Exchange) oil and gas energy Company; focussed on the redevelopment and enhancement of its upstream oil and gas interests in Oklahoma and Texas.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDZMMMGFLGGNZM
Date   Source Headline
1st Aug 20147:00 amRNSStrategic Agreement Provides Exposure to Mexico
10th Jul 201412:45 pmRNSResult of AGM
10th Jul 20147:00 amRNS2014 work programme update
8th Jul 20146:15 pmPRNHoldings in Company
30th Jun 20147:00 amRNSFinal Results
17th Jun 20147:00 amPRNSale and Purchase Agreement Signed with Aminex Plc
5th Jun 20147:00 amRNSCorrection: Positive Results From First Zink Ranch
4th Jun 20147:00 amRNSPositive Results From First Zink Ranch Well Test
21st May 20149:00 amRNSZink Ranch Update
9th May 20147:00 amRNSAgreement to Acquire 35% Interest in Shoats Creek
2nd May 20147:00 amRNSOperations Update
25th Apr 20147:00 amRNSOperations Update
14th Mar 20142:00 pmRNSOperations update and farm-out of Zink Ranch
27th Feb 20147:00 amPRNZink Ranch Update & Commencement of 2014 work programme
25th Feb 20142:40 pmRNSIssue of Equity, Total Voting Rights
22nd Jan 20147:00 amPRNOperations Update
16th Dec 20132:33 pmPRNBRR Audio Interview
16th Dec 20137:00 amPRNPositive Development Update on US Acreage
6th Dec 20137:00 amPRNAcquisition & Farm Out of Producing Unit, Oklahoma
18th Nov 20137:00 amPRNOil Production Rises Seven Fold at Oklahoma Well
14th Oct 20137:00 amRNSAcquires highly prospective acreage
11th Oct 20133:10 pmRNSCompletion of the South Weslaco Acquisition
11th Oct 20132:58 pmRNSShares to be admitted to trading
9th Oct 20137:01 amPRNAppointment of Joint Broker
9th Oct 20137:00 amPRNRaises GBP1.75 million through Placing
7th Oct 20137:05 amPRNManaging Director Interview on BRR
7th Oct 20137:00 amPRNPositive Frack Update, Horizon Project, Oklahoma
4th Oct 20137:00 amPRNIntention to Drill 1st Horizontal Well Mississippi Lime
30th Sep 20137:00 amPRNInterim Results
28th Aug 20137:00 amPRNAcquisition of Producing Leases in Texas
7th Aug 20137:01 amPRNManaging Director Interview on BRR
7th Aug 20137:00 amPRNProduction Exceeds 100BOEPD Target
5th Aug 20137:00 amPRNFrack Programme and Completion of Pipeline Project
4th Jul 20137:01 amPRNManaging Director Video on BRR Media
4th Jul 20137:00 amPRNNorthcote Drilling Partners LP Established
1st Jul 20137:00 amPRNOperations Update - OKE Project
20th Jun 20133:00 pmPRNResult of AGM
20th Jun 20137:00 amPRNAGM Statement
18th Jun 201311:00 amPRNCompletion of Mathis Acquisition
4th Jun 201311:00 amPRNNotice of AGM and Investor Presentation
28th May 20137:30 amPRNPositive Frac Update
3rd May 20137:05 amPRNIncreased Acreage in Oklahoma and Issue of Equity
3rd May 20137:00 amPRNCompletion of Hydraulic Fracture Stimulation
4th Apr 201310:45 amPRNGrant of Options
3rd Apr 20133:15 pmPRNCompletion of the OKE Acquisition and Placing
28th Mar 20137:00 amPRNFinal Results
25th Mar 20137:00 amPRNAcquisition of Project & Options & GBP1.5m Placing
13th Mar 20137:00 amPRNOperational Update
28th Feb 20137:00 amPRN40% Increase in Value of Total Net Proved Reserves
20th Feb 20137:00 amPRNOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.