SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAOGL.L Regulatory News (AOGL)

  • There is currently no data for AOGL

Operations Update

19 Oct 2017 14:23

RNS Number : 1134U
Mayan Energy Limited
19 October 2017
 

19 October 2017

 

Mayan Energy Ltd / Index: AIM / Epic: MYN/ ISIN: VGG6622A1057 / Sector: Oil and Gas

 

Mayan Energy Ltd ("Mayan" or "the Company")

Operations Update, Production in Stockdale Field

 

Mayan (AIM: MYN), the US onshore focused oil and gas development company, is pleased to provide an operational update across its interests. This includes the restoration of production at the Morris #1 well ('Morris1' or 'the Well') at the Stockdale Field, Wilson County, Texas in which the Company has an 60% working interest ('WI') and 45% net revenue interest ('NRI'). 

 

Restoration of production at the Morris1 Well at the Stockdale Field

The Well produced a total of 74 barrels of crude oil at an average of approximately 4 barrels per hour during an 18 hour period over three days

Following restoration of the Well's electric infrastructure, water handling is being added to enable continuous production

Follow-up testing has confirmed significant reservoir pressure at the Well with the static fluid level measured at 110 metres from the surface

As the reservoir is a fractured carbonate, production at the Well is to be optimised to deliver the average field level EUR of over 80,000 barrels per well via an acid stimulation

There are 10 wells within the Stockdale Field suitable for work over; the Morris1 Well being the first well expected to recommence production on the Field

 

Forest Hill Field, Wood County, Texas (70% WI and 52.5% NRI)

Initiation of work programme at Forest Hill Field - restoration of the electric service and access to salt water disposal facilities has been completed 

Three wells have been pumped up with good pressure and fluid levels with flow test to commence shortly

There are 30 wells within the Forest Hill Field suitable for work over with a conservative average field level EUR of 50,000 barrels per well

 

Zink Ranch Field, Osage County Oklahoma

Workover planned at Zink Ranch in coming weeks to test the Prue formation in select existing well bores 

 

Shoats Creek Field, Louisiana

Management expects to access the Shoats Creek field in the next week shortly to enable re-starting production at the LM 20 well

 

Eddie Gonzalez, Managing Director, said: "The initial results at the Stockdale Field begin to validate our new strategy and asset focus, which is firstly to acquire underperforming assets in Texas and Oklahoma, and then enhance production by applying the expertise of our new team and the specialised technology we now have at our command. With operations at Forest Hill Field now underway and work due to commence shortly at Zink Ranch and Shoats Creek, this is an exciting time for the Company. We are well on our way towards becoming a cash flow positive company with a healthy balance sheet and new growth opportunities appropriate for Mayan."

 

Special note concerning the Market Abuse Regulation

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No 596/2014 ("MAR"). Market soundings, as defined in MAR, were taken in respect of the Subscription, with the result that certain persons became aware of inside information, as permitted by MAR. That inside information is set out in this announcement. Therefore, those persons that received inside information in a market sounding are no longer in possession of inside information relating to the Company and its securities.

 

All of the technical information, including information in relation to reserves and resources that is contained in this announcement has been reviewed by, Mr John Ladd. Mr Ladd is a petroleum engineer who is a suitably qualified person with over 30 years' experience in assessing hydrocarbon reserves and has reviewed the release and consents to the inclusion of the technical information.

 

Technical Glossary

bopd

means barrels of oil per day. There are 42 gallons (approximately 159 litres) in one barrel of oil, which will contain approximately 5.8 million British Thermal Units.

 

EUR

Estimated ultimate recovery (EUR) is an approximation of the quantity of oil or gas that is

potentially recoverable or has already been recovered from a reserve or well.

 

Workover

The process of performing major maintenance or remedial treatments on an oil or gas well. In many cases, workover implies the removal and replacement of the production tubing string after the well has been killed and a workover rig has been placed on location. This operation saves considerable time and expense.

 

 

 

**ENDS**

 

For further information visit www.Mayanenergy.com or contact the following:

 

Eddie Gonzalez

Mayan Energy Ltd

+ 1 469 394 2008

Charlie Wood

Mayan Energy Ltd

+44 7971 444 326

Roland Cornish

Beaumont Cornish Ltd

+44 20 7628 3396

James Biddle

Beaumont Cornish Ltd

+44 20 7628 3396

Nick Bealer

Cornhill Capital Limited

+44 20 7710 9612

 

 

 

 

Notes:

Mayan Energy Limited is an AIM listed (London Stock Exchange) oil and gas energy Company; focussed on the redevelopment and enhancement of its upstream oil and gas interests in Oklahoma and Texas.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDZMMMGFLGGNZM
Date   Source Headline
5th Oct 20187:44 amRNSDirectorate Change
28th Sep 20182:05 pmRNSSecond Price Monitoring Extn
28th Sep 20182:00 pmRNSPrice Monitoring Extension
27th Sep 20182:39 pmRNSUpdate on Heavy Oil Sands Project, Utah
27th Sep 201811:15 amRNSAdjournment of AGM
27th Sep 20188:30 amRNSHalf-year Report
20th Sep 20187:00 amRNSOperations Update
31st Aug 20187:00 amRNSNotice of AGM
23rd Aug 20187:00 amRNSCompletion of Acquisition of New Five-Well Package
26th Jul 20187:00 amRNSExtended Completion Period and Issue of Equity
24th Jul 20183:05 pmRNSHolding(s) in Company
10th Jul 201810:00 amRNSUpdate on Heavy Oil Sands Project, Utah
29th Jun 20184:34 pmRNSFinal Results
27th Jun 201810:20 amRNSUpdate on Investee Company Block Energy
25th Jun 20187:00 amRNSAcquisition and Issue of Equity
20th Jun 20182:19 pmRNSMayan CEO Appointed to Advisory Board of Petroteq
19th Jun 20183:00 pmRNSAsphalt Ridge Heavy Oil Sands Project, Utah Opens
19th Jun 20187:00 amRNSZink Ranch Field Development Programme
11th Jun 20188:30 amRNSAdmission to AIM of Investee Company Block Energy
7th Jun 20183:27 pmRNSUpdate on Heavy Oil Sands Project, Utah
4th Jun 20187:00 amRNSUpdate on Gas Discovery at Stockdale Field, Texas
1st Jun 20183:52 pmRNSUpdate on Heavy Oil Sands Project, Utah
31st May 201810:22 amRNSExercise of Warrants
23rd May 201810:04 amRNSUpdate on Deloro Energy Investment
15th May 20187:00 amRNSDevelopment of Zink Ranch Field, Oklahoma
10th May 201812:12 pmRNSIssue of Equity
8th May 201812:00 pmRNSOperations Update
26th Apr 20187:01 amRNSNotice of Gas Discovery at Stockdale Field
26th Apr 20187:00 amRNSUpdate on Heavy Oil Sands Project, Utah
20th Apr 20187:00 amRNSOperations Update from Stockdale Field
4th Apr 20188:00 amRNSOperations Update
23rd Mar 20189:12 amRNSIssue of Equity
20th Mar 20187:00 amRNSIssue of Equity
13th Mar 20187:00 amRNSDirector Dealings
8th Mar 20182:15 pmRNSUpdate on Heavy Oil Sands Project, Utah
7th Mar 201811:10 amRNSUpdate of Heavy Oil Sands Project, Utah
5th Mar 20183:00 pmRNSUpdate on Heavy Oil Sands Project, Utah
23rd Feb 20187:00 amRNSAsphalt Ridge Plant Update
20th Feb 201812:52 pmRNSUpdate: completion of Gilbreath #48 workover
15th Feb 20187:00 amRNSOperations Update
13th Feb 20187:00 amRNSInitiation of Production at Two US Onshore Wells
7th Feb 20183:00 pmRNSAsphalt Ridge Project Update
1st Feb 20187:00 amRNSOperations Update
16th Jan 20187:00 amRNSIssue of Options
15th Jan 20187:30 amRNSAsphalt Ridge Update
9th Jan 20187:00 amRNSOperations Update
22nd Dec 20178:00 amRNSUS Onshore Operations Update
13th Dec 20172:05 pmRNSSecond Price Monitoring Extn
13th Dec 20172:00 pmRNSPrice Monitoring Extension
5th Dec 20172:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.