Pin to quick picksAntofagasta Regulatory News (ANTO)

Share Price Information for Antofagasta (ANTO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2,230.00
Bid: 2,237.00
Ask: 2,238.00
Change: 32.00 (1.46%)
Spread: 1.00 (0.045%)
Open: 2,198.00
High: 2,241.00
Low: 2,183.00
Prev. Close: 2,198.00
ANTO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2016 PRODUCTION REPORT

27 Apr 2016 07:00

RNS Number : 4327W
Antofagasta PLC
27 April 2016
 

NEWS RELEASE, 27 APRIL, 2016

Q1 2016 PRODUCTION REPORT

Antofagasta plc CEO, Iván Arriagada said:

 "We made good progress during the first quarter of 2016, with the integration of Zaldivar and the ramp-up at Antucoya. Combined, these projects added 25,000 tonnes of production over the period. Our cost savings programme is also benefiting our results, contributing to a fall in our net cash costs of 4% versus Q1 2015 to $1.37/lb and our guidance for the year remains unchanged at 710-740,000 tonnes, at a net cash cost of $1.35/lb.

 "Movements in the copper price over the quarter may suggest the market is beginning to stabilise. However, with price growth likely to remain subdued in the near term our focus continues to be on operating safely, efficiently and profitably."

HIGHLIGHTS

PRODUCTION

· Copper production in Q1 2016 was 157,100 tonnes, an increase of 7.3% on Q1 2015 with the first full quarter of production from Zaldívar and increases at Antucoya offset by lower production at Centinela Cathodes, as grade declined, and no contribution from Michilla, now that it is on care and maintenance

· Copper production in the quarter was 7.5% lower than in Q4 2015 despite the production from Zaldívar and Antucoya following extended maintenance during the quarter at Los Pelambres coupled with lower production at Centinela Cathodes and no production from Michilla

· Gold production in Q1 2016 was 56,700 ounces, a 1.8% increase on Q4 2015 largely due to higher gold recoveries at Centinela

· Molybdenum production at Los Pelambres was 1,700 tonnes in Q1 2016, compared to 2,100 tonnes in Q1 2015, principally due to a fall in grade

 

CASH COSTS

· Cash costs before by-product credits in Q1 2016 were $1.72/lb, 6.0% lower than in Q1 2015, but 4.2% higher than in Q4 2015. The increase from Q4 2015 is mainly related to lower production offset by cost savings and lower input prices, particularly energy

· Net cash costs were better than expected at $1.37/lb in Q1 2016, a 4.2% decrease compared with Q1 2015 with a significantly higher realised gold price offsetting the impact of lower production

OTHER

· As previously announced, Iván Arriagada succeeded Diego Hernández as CEO on 8 April 2016

· Antucoya achieved commercial production at the end of the quarter

· Group production and cash cost guidance for the full year is unchanged with an improvement in throughput expected at Los Pelambres and Centinela Concentrates, and in copper grade at Centinela Concentrates together with the continued ramp-up of Antucoya

· Michilla was put on care and maintenance at the end of 2015 with no production in this quarter.

 

 

GROUP PRODUCTION AND CASH COSTS

Year to date

Q1

Q4

 

 

 

2016

2015

%

2016

2015

%

Copper production(1)

kt

157.1

146.4

7.3

157.1

169.9

(7.5)

Gold production

koz

56.7

57.4

(1.2)

56.7

55.7

1.8

Molybdenum production

kt

1.7

2.1

(19.0)

1.7

2.8

(39.3)

Cash costs before by-product credits

$/lb

1.72

1.83

(6.0)

1.72

1.65

4.2

Net cash costs

$/lb

1.37

1.43

(4.2)

1.37

1.38

(0.7)

 

(1) Copper production tonnage includes pre-commercial production at Antucoya, which is not included in unit costs, and attributable production from Zaldívar from 1 December 2015

 

 

MINING OPERATIONS

Los Pelambres

Los Pelambres produced 82,200 tonnes of copper in Q1 2016 compared with 78,800 tonnes in the same quarter in the prior year. This increase of 4.3% was primarily due to one-off community disruptions at the mine access road during Q1 2015. Compared to the previous quarter copper production decreased by 15.8%, mainly due to lower throughput as a result of extended maintenance in February and harder ore.

Molybdenum production was lower at 1,700 tonnes in Q1 2016 compared to the previous quarter, primarily due to the lower grades.

Cash costs before by-product credits in Q1 2016 were $1.49/lb, 6.9% lower than in Q1 2015. This decrease was principally due to higher production during 2016, and lower input prices and cost savings. Compared with the previous quarter cash costs before by-product credits were 6.4% higher mainly due to lower production, offset slightly by lower input prices, such as diesel and energy.

Net cash costs in Q1 2016 at $1.22/lb were 3.9% lower than in Q1 2015, reflecting higher copper and gold production and a higher realised gold price, offset by a much lower contribution from molybdenum with production down and lower realised prices.

LOS PELAMBRES

 

Year to date

Q1

Q4

 

 

 

2016

2015

%

2016

2015

%

Daily ore throughput

kt

147.5

151.8

(2.8)

147.5

170.2

(13.3)

Copper grade

%

0.70

0.69

1.4

0.70

0.72

(2.8)

Copper recovery

%

89.3

87.0

2.6

89.3

89.3

-

Copper production

kt

82.2

78.8

4.3

82.2

97.6

(15.8)

Copper sales

kt

83.4

79.9

4.4

83.4

103.8

(19.7)

Molybdenum grade

%

0.016

0.019

(15.8)

0.016

0.022

(27.3)

Molybdenum recovery

%

76.5

81.3

(5.9)

76.5

76.6

(0.1)

Molybdenum production

kt

1.7

2.1

(19.0)

1.7

2.8

(39.3)

Molybdenum sales

kt

1.9

1.9

-

1.9

2.8

(32.1)

Gold production

koz

14.2

11.3

25.7

14.2

15.9

(10.7)

Gold sales

koz

15.7

12.4

26.6

15.7

17.3

(9.2)

Cash costs before by-product credits(1)

$/lb

1.49

1.60

(6.9)

1.49

1.40

6.4

Net cash costs(1)

$/lb

1.22

1.27

(3.9)

1.22

1.15

6.1

 

(1)  Includes tolling charges of $0.26/lb in Q1 2016, $0.26/lb in Q4 2015 and $0.24/lb in Q1 2015

 

Centinela

Total copper production at Centinela was 49,800 tonnes in Q1 2016, 17.5% lower than in the same quarter last year due to significantly lower grades at both Centinela Concentrates and Centinela Cathodes offset in part by higher throughput at Centinela Concentrates. Compared with the previous quarter production was 4.4% lower due to lower production of copper cathodes slightly offset by higher production of copper in concentrates.

Production of copper in concentrates was 37,200 tonnes in Q1 2016, compared with 38,400 tonnes in the same period last year as grade declined by 26.8% to 0.52% offset by throughput increasing by 23.2% to 92,000 tonnes of ore per day. Compared to the previous quarter production increased by 6.6% primarily due to higher recoveries partially offset by slightly lower throughput.

The copper grade at Centinela Concentrates is expected to increase during the second half of the year together with throughput, which will increase throughput to a maximum of 105,000 tonnes of ore per day once the final thickener is completed in the fourth quarter of the year.

Cathode production in Q1 2016 was 12,600 tonnes, a 42.5% decrease on the 21,900 tonnes produced in Q1 2015 as grades declined as expected as mining moved to the lower grade zones of the Tesoro Central and Tesoro Noreste pits, together with lower throughput and recoveries. Compared with the last quarter, cathode production was 26.7% lower largely as a result of lower throughput, due to restrictions at the reclamation system, and lower grades.

Gold production was 42,500 ounces in Q1 2016, 3,600 ounces lower than in the same quarter last year primarily due to higher recoveries slightly offset by a drop in the grade.

Cash costs before by-product credits were $2.14/lb in Q1 2016 were 3.9% higher than in Q1 2015 as grades at Centinela Concentrates and Centinela Cathodes declined significantly. Compared with the previous quarter costs were 13.4% lower as lower input prices and cost savings more than offset the impact of lower production.

Net cash costs in Q1 2016 at $1.57/lb were marginally better than in the same period last year and 24.5% lower than in the previous quarter with the substantial improvement in realised gold prices and higher gold production.

 

CENTINELA

 

Year to date

Q1

Q4

 

 

 

2016

2015

%

2016

2015

%

CONCENTRATES

 

 

 

 

 

 

 

Daily ore throughput

kt

92.0

74.7

23.2

92.0

93.3

(1.4)

Copper grade

%

0.52

0.71

(26.8)

0.52

0.50

4.0

Copper recovery

%

85.6

88.0

(2.7)

85.6

83.0

3.1

Copper production

kt

37.2

38.4

(3.1)

37.2

34.9

6.6

Copper sales

kt

33.6

37.8

(11.1)

33.6

35.4

(5.1)

Gold grade

g/t

0.21

0.30

(30.0)

0.21

0.22

(4.5)

Gold recovery

%

75.9

78.8

(3.7)

75.9

68.0

11.6

Gold production

koz

42.5

46.1

(7.8)

42.5

39.8

6.8

Gold sales

koz

37.5

46.9

(20.0)

37.5

40.6

(7.6)

CATHODES

 

Daily ore throughput

kt

21.9

25.4

(13.8)

21.9

25.0

(12.4)

Copper grade

%

0.75

1.17

(35.9)

0.75

0.85

(11.8)

Copper recovery

%

66.2

70.6

(6.2)

66.2

69.6

(4.9)

Copper production - heap leach

kt

10.5

19.4

(45.9)

10.5

14.3

(26.6)

Copper production - total(1)

kt

12.6

21.9

(42.5)

12.6

17.2

(26.7)

Copper sales

kt

13.0

21.8

(40.4)

13.0

19.8

(34.3)

Total copper production

kt

49.8

60.4

(17.5)

49.8

52.1

(4.4)

Cash costs before by-product credits(2)

$/lb

2.14

2.06

3.9

2.14

2.47

(13.4)

Net cash costs(2)

$/lb

1.57

1.58

(0.6)

1.57

2.08

(24.5)

 

(1) Includes production from ROM material

(2) Includes tolling charges for copper in concentrates of $0.28/lb in Q1 2016, $0.27/lb in Q4 2015 and $0.25/lb in Q1 2015

 

Zaldívar

Following the acquisition of 50% of Zaldívar in December last year attributable copper production was 12,400 tonnes in Q1 2016 compared with 4,400 tonnes in December. Lower plant throughput was due to maintenance of the stacking and reclaiming system, which was completed during the quarter.

Zaldívar has a heap leach operation with secondary leaching as well as a run-of-mine (ROM) dump leach and production is separated between the two principal process routes in the table below. A small quantity of copper in concentrates is also produced, which is reported as part of total production.

Despite the fall in throughput in the heap leach, cash costs in Q1 2016 were $1.59/lb compared with $1.73/lb in the previous quarter primarily due to savings under the Group's Cost and Competitiveness Programme and lower input costs.

ZALDÍVAR(1)

 

Year to date

Q1

Q4

 

 

 

2016

2015

%

2016

2015

%

Daily ore throughput

kt

44.8

-

-

44.8

51.6

(13.2)

Copper grade

%

0.65

-

-

0.65

0.65

-

Copper recovery

%

62.9

-

-

62.9

64.9

(3.1)

Copper production - heap leach

kt

8.2

-

-

8.2

2.9

182.8

Copper production - total(2)

kt

12.4

-

-

12.4

4.4

181.8

Copper sales

kt

11.5

-

-

11.5

5.5

109.1

Cash costs(3)

$/lb

1.59

-

-

1.59

1.73

(8.1)

 

(1) Acquired 1 December 2015. Attributable production and sales

(2) Includes production from ROM material and in concentrates

 

Antucoya

The ramp-up of Antucoya advanced, with production of 12,700 tonnes during the quarter and full capacity expected to be reached by mid-2016. A solution for the problem with excessive dust has started and is expected to be completed by the end of the year.

By the end of March, approximately 12 million tonnes of crushed material were stacked on the heap, with 4.9 million tonnes of material added to the heap during the quarter.

With both lines now operating simultaneously in the electro-winning plant commercial production is regarded as starting at the beginning of April.

The project's final total construction capital expenditure was in line with the budget of $ 1.9 billion.

Transport

Total volumes transported by the division were 1.7 million tonnes in Q1 2016, 12.8% higher than in the same period last year and 4.1% lower than in the previous quarter. The increase compared with Q1 2015 reflects the improved utilisation of rolling stock and additional demand. The decrease since Q4 2015 is mainly due to the seasonality of copper shipments.

 

 

Year to date

Q1

Q4

 

 

 

2016

2015

%

2016

2015

%

TONNAGE TRANSPORTED

Rail

kt

1,368

1,168(1)

17.1

1,368

1,417

(3.5)

Road

kt

302

313

(3.5)

302

325

(7.1)

Total tonnage transported

kt

1,670

1,481

12.8

1,670

1,742

(4.1)

(1) Excludes 233kt transported by FCA, which was sold in August 2015

Commodity prices and exchange rates

 

 

Year to date

Q1

Q4

 

 

 

2016

2015

%

2016

2015

%

Copper

Market price

$/lb

2.12

2.64

(19.7)

2.12

2.22

(4.5)

Realised price

$/lb

2.22

2.45

(9.4)

2.22

2.00

11.0

Gold

Market price

$/oz

1,180

1,220

(3.3)

1,180

1,105

6.8

 

Realised price

$/oz

1,316

1,252

5.1

1,316

1,077

22.2

 

Molybdenum

Market price

$/lb

5.3

8.5

(37.6)

5.3

4.8

10.3

Realised price

$/lb

5.4

7.6

(28.9)

5.4

4.3

24.5

Exchange rates

Chilean peso

per $

702

624

12.5

702

698

0.6

 

The spot commodity prices for copper, gold and molybdenum as at 31 March 2016 were $2.21/lb, $1,236/oz and $5.3/lb respectively compared with $2.13/lb, $1,062/oz and $5.3/lb as at 31 December 2015 and $2.75/lb, $1,188oz and $8.2/lb as at 31 March 2015.

The provisional pricing adjustments for copper, gold and molybdenum for the quarter were positive $24.8 million, positive $10.2 million and negative $0.04 million respectively.

 

 

Investors - London

Media - London

Andrew Lindsay

alindsay@antofagasta.co.uk

Carole Cable

antofagasta@brunswickgroup.com

Paresh Bhanderi

pbhanderi@antofagasta.co.uk

Will Medvei

antofagasta@brunswickgroup.com

Telephone

+44 20 7808 0988

Telephone

+44 20 7404 5959

Investors - Santiago

Media - Santiago

Alfredo Atucha

aatucha@aminerals.cl

Pablo Orozco

porozco@aminerals.cl

Telephone

+56 2 2798 7000

Carolina Pica

cpica@aminerals.cl

Telephone

+56 2 2798 7000

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLIFMPTMBITBIF
Date   Source Headline
8th May 20246:23 pmRNSRESULTS OF 2024 ANNUAL GENERAL MEETING
8th May 202410:05 amRNSCHAIRMAN’S COMMENTS AT THE 2024 AGM
30th Apr 20247:00 amRNSANTOFAGASTA PLC ANNOUNCES PRICING OF BOND
25th Apr 20247:00 amRNSFINAL DIVIDEND PAYABLE
17th Apr 20247:00 amRNSQ1 2024 PRODUCTION REPORT
3rd Apr 202411:00 amRNSNOTIFICATION OF TRANSACTIONS
28th Mar 20247:00 amRNS2023 REPORTING SUITE, 2024 AGM & CORPORATE UPDATE
19th Mar 20248:00 amRNSCENTINELA SECOND CONCENTRATOR FINANCING
20th Feb 20247:00 amRNSFULL-YEAR RESULTS FOR THE YEAR ENDED 31/12/2023
16th Feb 20247:00 amRNSUPDATED EMISSIONS TARGETS
15th Feb 20247:00 amRNS2023 FY RESULTS PRESENTATION & CONFERENCE DETAILS
30th Jan 20244:49 pmRNSAPPOINTMENT OF INDEPENDENT NON-EXECUTIVE DIRECTOR
17th Jan 20247:00 amRNSQ4 2023 PRODUCTION REPORT
2nd Jan 20247:00 amRNSNOTIFICATION OF TRANSACTION BY DIRECTOR / PDMR
20th Dec 20237:00 amRNSCENTINELA SECOND CONCENTRATOR PROJECT APPROVED
15th Dec 20232:24 pmRNSANTOFAGASTA ANNOUNCES INVESTMENT IN BUENAVENTURA
12th Dec 20237:00 amRNSDIRECTOR CHANGE AND CHANGES TO BOARD COMMITTEES
10th Nov 20237:00 amRNSPUBLICATION OF CLIMATE CHANGE REPORT
18th Oct 20237:00 amRNSQ3 2023 PRODUCTION REPORT
7th Sep 20237:00 amRNSINTERIM DIVIDEND PAYABLE
10th Aug 20237:00 amRNSHALF YEARLY FINANCIAL REPORT
3rd Aug 20237:00 amRNS2023 Half Year Results - Participation Details
31st Jul 20237:00 amRNSANTOFAGASTA RELEASES SOCIAL VALUE REPORT
20th Jul 20237:00 amRNSANTOFAGASTA RELEASES TAX REPORT
19th Jul 20237:00 amRNSQ2 2023 PRODUCTION REPORT
30th Jun 20237:00 amRNSReport on Payments to Govts
10th May 20236:37 pmRNSRESULTS OF 2023 ANNUAL GENERAL MEETING
10th May 20231:00 pmRNSCHAIRMAN’S COMMENTS AT THE 2023 AGM
2nd May 20237:00 amRNSFINAL DIVIDEND PAYABLE
19th Apr 20237:00 amRNSQ1 2023 PRODUCTION REPORT
18th Apr 20237:00 amRNSAPPOINTMENT OF INDEPENDENT NON-EXECUTIVE DIRECTOR
31st Mar 20238:38 amRNSPUBLICATION OF 2022 ANNUAL REPORT AND ACCOUNTS
30th Mar 20234:31 pmRNSNOTIFICATION OF TRANSACTIONS
14th Mar 20234:39 pmRNSCHANGES TO BOARD COMMITTEES
21st Feb 20237:00 amRNS2022 Full-year results announcement
14th Feb 20237:00 amRNS2022 Full Year Results - Participation Details
18th Jan 20237:00 amRNSQ4 2022 PRODUCTION REPORT
29th Dec 20228:34 amRNSLOS PELAMBRES ACCESS BLOCKED
15th Dec 20225:15 pmRNSANTOFAGASTA EXITS REKO DIQ PROJECT IN PAKISTAN
19th Oct 20227:00 amRNSQ3 2022 PRODUCTION REPORT
12th Oct 202210:15 amRNSNotice of Q3 2022 Production Report
4th Oct 20222:37 pmRNSLOS PELAMBRES DESALINATION PROJECT UPDATE
12th Sep 20227:00 amRNSPrecautionary Measure at Los Pelambres
9th Sep 20225:31 pmRNSInterim Dividend 2022 FX Rates
11th Aug 20227:00 amRNSHALF YEAR FINANCIAL REPORT FOR PERIOD TO 30.06.22
4th Aug 20227:00 amRNSNotice of Half Year Results 2022
20th Jul 20227:00 amRNSQ2 2022 PRODUCTION REPORT
11th Jul 20227:00 amRNSANTOFAGASTA RELEASES TAX REPORT
1st Jul 20227:00 amRNSREPORT ON PAYMENTS TO GOVERNMENTS
15th Jun 20227:00 amRNSLOS PELAMBRES CONCENTRATE PIPELINE INCIDENT UPDATE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.