Sapan Ghai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltona Energy Regulatory News (ANR)

  • There is currently no data for ANR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Feasibility Study

14 Feb 2006 07:01

Altona Resources PLC14 February 2006 14 February 2006 Altona Resources Plc ("Altona" or "The Company") World leading engineering Consultants appointed for Coal-to-Oil Study Altona Resources Plc (AIM: ANR) has commissioned Jacobs Consultancy ("Jacobs"),one of the world's largest and most diverse providers of professional technicalservices, to carry out a feasibility study on the four leading gasificationtechnologies suitability to Arckaringa Coal for the production ofenvironmentally-friendly, ultra-clean (0% sulphur) diesel fuel, aviation fueland other applications. Phase One of the Jacobs coal to oil study, which will be conducted inconjunction with the Company's planned drilling programme at Arckaringaannounced in November 2005, is expected to be concluded by no later than earlyin the second quarter of 2006. It is intended to identify a preferredgasification technology for the coal feedstock available from Arckaringa. Coal to Oil Coal based FT technology(1) can be used to produce a wide range of productsincluding diesel fuel, aviation fuel, fuel cell fuel, chemicals (includingdetergents, plastics, synthetic plastics and synthetic rubber), waxes and steamfor electricity production. Following preparation (by drying or adding water), the coal feedstock is fed toa gasifier together with oxygen to produce raw synthetic gas ("syngas"). The rawsyngas is then conditioned by cooling to generating steam and carbon monoxideshifting (both subject to gasification technology adopted) and acid gas removalto produce clean syngas with 0% sulphur content and low levels of carbondioxide. The clean syngas is then routed to a FT synthesis plant for processinginto liquid hydrocarbons. The offgas from the FT synthesis plant is then fed toa gas turbine to generate electricity. Additional steam, generated from theexhaust gas leaving the gas turbine is combined with the earlier steam togenerate more electricity in a steam turbine. Coal based FT technology can have the added benefit of substantial powergeneration capability which can contribute to positive economics and base loadsupply for the state of South Australia. Christopher Lambert, Chairman of Altona, commented: "The appointment of Jacobsrepresents a significant step on the road to bringing the Arckaringa resource tobeing a substantial project. Arckaringa represents a potentially strategic coalresource, given its size and long term supply potential, that could be furtherenhanced by successful application of coal-to-oil technology. Appointment of Consultants Altona also announces the appointment of Bill McIntosh and Chris Schrape asconsultants to the Arckaringa Project. Chris Schrape, has more than 25 years' experience in the resource and miningindustries. He was most recently Chief Executive Officer of Griffin Coal, aPerth based company for whom he worked from 1997- 2004. Before that he spentsome 20 years with Rio Tinto in a variety of senior coal marketing andmanagement roles. Bill McIntosh is a widely respected mining engineer with over 33 years'international experience who has played a key role in mining projects inAustralia and globally. The majority of his career has been involved with opencut coal mining developments. Mr McIntosh has a mining engineering degree fromthe University of Melbourne and Master of Science (Mining) degree from Queen'sUniversity in Canada. He is a member of the Australasian Institute of Mining andMetallurgy and the Mineral Industry Consultants Association, as well as being aChartered Professional (Management). "The appointment of Bill McIntosh and Chris Schrape gives the Company access tosubstantial experience in coal resources development. The Board and I lookforward to benefiting from their contribution to the Company at a managementlevel", Mr Lambert said. -ends- For further information please contact: Altona Resources Plc Nabarro Wells & Co Limited Parkgreen CommunicationsChristopher Lambert, Chairman Hugh Oram, Director Justine Howarth / Victoria Thomas+44 (0) 20 7016 5100 +44 (0) 20 7710 7400 +44 (0) 20 7493 3713 Notes to Editors: The Arckaringa Coal Project: The Arckaringa Coal Project ("Arckaringa") comprises the 100% interest in threeexploration licences in South Australia, which have previously been calculatedas a JORC compliant resource of over 7 billion tonnes of sub bituminous Permiancoal, amenable to open pit mining, and suitable as fuel for power generation andpotential application of coal to oil technology. The three explorationlicences, EL3360, EL3361, and EL3362 ("the Licences"), cover a combined area ofapproximately 2,500 square kilometres in the northern portion of the PermianArckaringa Basin in South Australia. The Licences include three coal deposits,known as the Westfield Deposit (EL3360), the Wintinna Deposit (EL3361), and theMurloocoppie Deposit (EL3362), are located in close proximity to the Adelaide toDarwin railroad, facilitating improved economic potential for despatch of coalto coastal based industries and export ports. The railroad will also facilitatemine development and operations. Coal to Oil Technology: The technology required to convert coal to oil has been available for over 80years, having been invented by German chemists Franz Fischer and Hans Tropsch in1923. The Fischer-Tropsch ("FT") Synthesis was used during WWII to produce600,000 barrels (bbl) per year from coal and coke. The technology has been further developed in the intervening years, primarily bySASOL in South Africa and worldwide current production stands at just under200,000 bbl/day. Since the 1950s, SASOL has produced 160,000 bbl/day from coal;SASOL technology has been used by Petro SA since 1993 to produce 23,000 bbl/dayfrom natural gas; and in Malaysia Shell has produced 15,000 bbl/day since 1995. Advantages Coal to oil represents a significant opportunity for global energy supplies asdemand for traditionally sourced petroleum continues to outstrip current andprojected supply: • Ultra-clean FT diesel fuel provides significant environmental benefits with, typically, 0% sulphur emissions (USA regulations from 2006 will require an emission rate of
Date   Source Headline
1st Mar 20196:00 pmRNSAltona Energy
1st Mar 20197:00 amPRNBusiness Update and Non-Executive Appointment
1st Feb 20197:30 amRNSSuspension - Altona Energy Plc
1st Feb 20197:00 amPRNAdmission to NEX Exchange
28th Jan 201912:56 pmPRNCorrection: Application for Admission to NEX Exchange
28th Jan 20197:00 amPRNApplication for Admission to NEX Exchange
25th Jan 20194:40 pmRNSSecond Price Monitoring Extn
25th Jan 20194:35 pmRNSPrice Monitoring Extension
25th Jan 201912:37 pmRNSResult of AGM and Directorate Changes
24th Jan 20194:50 pmRNSDirectorate Change
24th Jan 20192:41 pmRNSDirectorate Change
16th Jan 20199:59 amRNSDirector/PDMR Shareholding
16th Jan 20199:08 amRNSHolding(s) in Company
16th Jan 20197:00 amRNSNominated Adviser Status Update
15th Jan 20198:55 amRNSDirector/PDMR Shareholding
14th Jan 20194:40 pmRNSSecond Price Monitoring Extn
14th Jan 20194:35 pmRNSPrice Monitoring Extension
14th Jan 20191:48 pmRNSResult of General Meeting
11th Jan 20197:00 amRNSConditional Subscriptions for Convertible Notes
4th Jan 201910:02 amRNSAmendment to Final Results
31st Dec 201810:20 amRNSPublication of Annual Report and AGM Notice
28th Dec 20184:02 pmRNSFinal Results
19th Dec 20181:45 pmRNSNotice of GM - Clarification
14th Dec 20182:49 pmRNSNotice of GM
14th Dec 20187:00 amRNSPyrolysis Update
5th Dec 201812:57 pmRNSShareholder Requisition Notice
29th Nov 20187:00 amRNSDirectorate Changes and Company Update
2nd Nov 20187:00 amRNSNomad Status
17th Oct 201812:07 pmRNSResult of General Meeting
11th Oct 20183:37 pmRNSWithdrawal of Change of Name Resolution
2nd Oct 20187:00 amRNSProposed Capital Re-organisation and Notice of GM
20th Sep 20182:05 pmRNSSecond Price Monitoring Extn
20th Sep 20182:00 pmRNSPrice Monitoring Extension
14th Sep 20183:00 pmRNSDrilling Programme Update
28th Aug 20187:00 amRNSPyrolysis Licence Agreement
9th Aug 20187:00 amRNSDirector Appointment
17th Jul 20187:00 amRNSDrilling Approvals Update & Potential Pyrolysis JV
5th Jun 20187:00 amRNSMOU regarding Pyrolysis Technology
18th May 20187:00 amRNSInitial Drilling Programme Update
24th Apr 20187:00 amRNSUpdate on meetings in Australia
29th Mar 20187:00 amRNSHalf-year Report
20th Mar 20187:00 amPRNDrilling Programme
27th Feb 20188:43 amPRNRenewal of Exploration Licences
26th Feb 20187:00 amPRNAppointment of Consulting Geologist
2nd Feb 20187:00 amPRNMoU with Joint Venture Partners
1st Feb 20187:00 amPRNBusiness Update
10th Jan 201812:34 pmRNSResult of AGM
10th Jan 20187:00 amPRNWestfield Coal Report
19th Dec 20177:00 amPRNFinal Results
30th Nov 20177:00 amPRNAckaringa Report Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.