Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAngus Energy Regulatory News (ANGS)

Share Price Information for Angus Energy (ANGS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.475
Bid: 0.45
Ask: 0.50
Change: 0.025 (5.56%)
Spread: 0.05 (11.111%)
Open: 0.475
High: 0.575
Low: 0.45
Prev. Close: 0.45
ANGS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Balcombe Field Well Test Result

2 Oct 2018 08:00

RNS Number : 6639C
Angus Energy PLC
02 October 2018
 

2 October 2018

 

Angus Energy Plc

("Angus Energy" or the "Company")

 

Angus Energy Completes 7-Day Well Test at Balcombe

 

 

Horizontal Well Balcombe-2z Flowed at 853 Bopd and 1,587 Bopd

During Separate Test Runs

 

Balcombe Field Discovery Capable of Producing at Commercial Rates

 

Angus Energy Plc (LSE:ANGS), a leading UK conventional oil and gas production and development company, is pleased to announce the completion of the 7-day flow test programme for the horizontal well, Balcombe-2z.

 

The test utilised Nitrogen and coiled tubing to clean and prime the well which when removed allowed a natural flow at 853 bopd equivalent, not including 22.5% water. A second flow period was undertaken with the well flowing naturally at 1,587 bopd equivalent, not including 6.6% water.

 

The Balcombe-2z well produces from a single Micrite Layer, just one of the Kimmeridge Micrite Layers. During the initial flow period, the well slugged at up to 3,000 barrels per day which had to be reduced as it exceeded separator operating capacity. Duration of the test runs were limited.

 

No CO2 or H2S were observed or measured.

 

The water produced was not expected, the Company's testing team believes a small high-pressure water zone was intersected in the horizontal section of the well which will require isolation in the future. Currently, the testing team believes the water production is not from the main Kimmeridge Reservoir itself but through fractured communication. To correctly identify the water zone, a Production Logging String was run on coiled tubing. Unfortunately, the coiled tubing equipment supplied by a third-party service provider, failed after the second test resulting in a delay. Subsequently only two flow tests were performed before the test had to be concluded due to planning restrictions. All the collected data is being further analysed and the company will provide an update in due course.

 

The Company believes based on the results of this 7-day flow test, it can isolate the water producing zone and establish commercial production under normal pumped production conditions.

 

The oil quality was light around 34 API though this may be an underestimate due to light hydrocarbons being removed by the Nitrogen used to assist the well to flow. Currently, the Company anticipates that the oil quality will be similar to that seen elsewhere in the Kimmeridge formation per the Company RNS of 3 July reporting the Kimmeridge producing 38 - 40 API, Light Crude at Lidsey on the outer edge of the Weald Basin.

Paul Vonk, Managing Director of Angus Energy stated:

"We are obviously pleased with the results of the Balcombe-2z flow test and encouraged as we take our next steps towards producing from the Kimmeridge layers in the near future at the Brockham Field. This programme was successful because our team at Angus and our service providers maintained the highest standards, the most important of all being safe operations."

 

The Balcombe Field Discovery is a joint venture between Cuadrilla Balcombe Limited, Lucas Bolney Limited and Angus Energy. Angus Energy assumed Operatorship of the Balcombe licence on behalf of the partnership in July of 2018.

 

Qualified Person's Statement:

Chris de Goey, a Non-Executive Director of the Company, who has over 20 years of relevant experience in the oil and gas industry, has approved the information contained in this announcement. Mr de Goey is a member of the Petroleum Exploration Society of Great Britain and the Society of Petroleum Engineers.

 

END.

 

About Angus Energy plc.

Angus Energy plc. is a UK AIM quoted, independent onshore oil and gas production and development company focused on leveraging its expertise to advance its portfolio of UK assets as well as acquire, manage and monetise select projects. Angus Energy majority owns and operates conventional oil production fields at Brockham (PL 235) and Lidsey (PL 241) and has a 12.5% interest in the Holmwood licence (PEDL143) and a 25% interest in the Balcombe Licence (PEDL244).

 

Further information is available on the company website: www.angusenergy.co.uk 

 

Enquiries:

 

Angus Energy Plc

www.angusenergy.co.uk

Paul Vonk

Tel: +44 (0) 208 899 6380

Stockdale Securities Limited (Nomad and Broker)

www.stockdalesecurities.com

Robert Finlay / Richard Johnson / Ed Thomas

Tel: +44 (0) 20 7601 6100

Yellow Jersey

www.yellowjerseypr.com

Tim Thompson

Tel: +44 (0) 203 735 8825

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

Glossary of Terms:

 

API - The American Petroleum Institute gravity, or API gravity, is a measure of how heavy or light a petroleum liquid is compared to water

 

Bopd - Barrels of oil per day

 

Limestone - a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

 

Micrite Layer - Carbonate rocks (Limestone) that contain fine-grained calcite 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCKMMGGVZNGRZG
Date   Source Headline
31st Dec 20207:00 amRNSTotal Voting Rights
29th Dec 202011:58 amRNSHolding(s) in Company
23rd Dec 20209:05 amRNSSecond Price Monitoring Extn
23rd Dec 20209:00 amRNSPrice Monitoring Extension
22nd Dec 202010:23 amRNSHolding(s) in Company
16th Dec 20205:20 pmRNSResult of Placing
16th Dec 20204:30 pmRNSProposed Placing
30th Nov 20207:00 amRNSMOU signed for Saltfleetby Debt Funding
9th Nov 20201:31 pmRNSResult of Meeting
4th Nov 20207:00 amRNSOperational Update & Final conversion of notes
21st Oct 20204:11 pmRNSNotice of GM and increase in interest in Brockham
16th Oct 20207:00 amRNSHolmwood Licence Update
8th Oct 20203:21 pmRNSWork Commencing on Pipeline at Saltfleetby
1st Oct 20207:00 amRNSTotal Voting Rights
28th Sep 20201:57 pmRNSFurther Repayment of Riverfort Loan Facility
23rd Sep 20201:01 pmRNSNotice of Investor and Analyst Conference Call
23rd Sep 20209:44 amRNSResult of Placing
23rd Sep 20207:00 amRNSProposed Placing and Proposed debt facility
27th Aug 20204:09 pmRNSBrockham Update: Variation of EA application
25th Aug 20205:26 pmRNSFurther Repayment of Riverfort Loan Facility
20th Aug 20201:58 pmRNSBalcombe Planning Application
18th Aug 20204:05 pmRNSReduced Decommissioning Liability
13th Aug 20205:04 pmRNSHolding(s) in Company
13th Aug 202011:05 amRNSSecond Price Monitoring Extn
13th Aug 202011:00 amRNSPrice Monitoring Extension
13th Aug 20207:00 amRNSBalcombe Update
12th Aug 20209:08 amRNSAgreement for the Purchase of Gas from Saltfleetby
11th Aug 20207:00 amRNSSaltfleetby Pipeline Timetable
7th Aug 20205:00 pmRNSPlanning Permission for Saltfleetby Pipeline
24th Jul 20201:45 pmRNSFurther Repayment of Riverfort Loan Facility
9th Jul 20202:45 pmRNSOperations Update
23rd Jun 202010:47 amRNSHalf-year Report
22nd Jun 20204:56 pmRNSFurther Repayment of Riverfort Loan Facility
12th Jun 20207:00 amRNSSatfleetby Planning Update
4th Jun 20207:00 amRNSOperations and Planning Update
21st May 202011:23 amRNSFurther Repayment of Riverfort Loan Facility
5th May 20207:00 amRNSNotice of Investors Conference Call
1st May 20207:00 amRNSOperations and Planning Update
24th Apr 20204:11 pmRNSNotice of Investor Conference Call
20th Apr 20207:00 amRNSIssue of £1.4 million Convertible Loan Note
30th Mar 20201:53 pmRNSResult of AGM
24th Mar 20205:06 pmRNSAGM Arrangements
23rd Mar 202010:07 amRNSHolding(s) in Company
19th Mar 20209:59 amRNSAGM Arrangements
18th Mar 202011:05 amRNSSecond Price Monitoring Extn
18th Mar 202011:00 amRNSPrice Monitoring Extension
17th Mar 20204:13 pmRNSBalcombe Oil Field Planning Application
9th Mar 20209:00 amRNSPrice Monitoring Extension
5th Mar 20202:06 pmRNSSecond Price Monitoring Extn
5th Mar 20202:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.