Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMER.L Regulatory News (AMER)

  • There is currently no data for AMER

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

20 Apr 2017 07:00

RNS Number : 8240C
Amerisur Resources PLC
20 April 2017

20 April 2017

Amerisur Resources Plc ("Amerisur" or the "Company")

Operations Update

Platanillo-22 Flow tested ahead of pre-drill expectations - Deeper oil-water contact found - Reserves upgrade expected

Amerisur Resources Plc, the oil and gas producer and explorer focused on South America, is pleased to announce an update on operations in the Platanillo field in Colombia.

Platanillo-22聽has been tested at 613 barrels of oil per day (BOPD)聽materially ahead of pre-drill expectations聽

Well has been placed on commercial production and produced oil is being trucked to the southern pads for export via the OBA system

Observed聽results suggest that the oil accumulation at Pad 2N has a separate closure from Pad 3N and the greater Platanillo field - importantly, the oil water contact ("OWC") is deeper than聽the main field

As a result, provisional re-mapping indicates the potential for up to 7.82MMBO聽of recoverable reserves聽within the Pad 2N structure, previous estimate of 1.4MMBO

Serinco D-10 rig expected to spud Platanillo-21 from Pad 2N in next few days

Platanillo-22 has been tested at 613 barrels of oil per day (BOPD) with 0.22% water cut from a 14ft perforated interval in the lower U sand using a hydraulic pump lifting system. The tested oil quality is slightly better than the main Platanillo field at 31.5 degrees API. The pre-drill production estimate for this well was in the range of 300 to 400 BOPD. The well has been placed on commercial production and produced oil is being trucked to the southern pads for export via the OBA system.

The structure drilled by Platanillo-22, located at Pad 2N, approximately 3.38 km north of Pad 3N was previously undrilled but was believed, on the basis of seismic data to be connected to Pad 3N. Drilling and logging data indicate that the structure is separate and the nature of its closure may offer further reserves upside than previously envisaged on the basis of 3D seismic.

The reservoir units in the Cretaceous Villeta formation were encountered slightly deeper than prognosed. However, the Oil Water Contact (OWC) within the reservoirs was encountered significantly deeper than expected, being 37ft deeper in the Upper U and 23ft deeper in the Lower U formation. No OWC was observed in the N sand. The T sand did not indicate pay in this well. The greater effective oil column in the U sands is likely to increase certified reserves in the field.

The observed results suggest that the oil accumulation at Pad 2N has a separate closure compared to Pad 3N and the greater Platanillo field. This indicates the presence of a permeability barrier between those pads, which may be formed either by a sub-seismic fault or a stratigraphic feature which allowed the Pad 2N structure to be filled to a greater extent than the remainder of the field. Since the reception of these data the Company has been closely evaluating the 3D seismic cube and the anomaly processing and has identified certain subtle features within the basement and overlying formations which may be the cause of that barrier. Provisional re-mapping has been performed and the Company estimates, using volumetric calculations, the potential for up to 7.82 million barrels of oil (MMBO) of recoverable reserves within the Pad 2N structure, as opposed to the previous estimate of approximately 1.4MMBO. Further testing of Platanillo-22, and drilling of further wells are required to define the actual increase in potential reserves. Once these activities are performed Amerisur will commission an independent reserves report to SPE standards.

The Company has now moved the drilling rig Serinco D-10 over the adjacent drilling cellar on Pad 2N, and expects to spud Platanillo-21 in the next few days. Platanillo-21 is a short deviation directional well aimed at the crest of the mapped structure, with a drilling offset of 250ft and a total planned measured depth of 8,485ft. Given the important results from Platanillo-22, the Company plans to log this well with both Logging While Drilling and Wireline techniques, and additionally to acquire core data through the entire Villeta sequence, i.e. from top N Sand to the igneous basement. These data will be important in terms of enhancing understanding at Pad 2N and in our nearby prospects and adjoining blocks.

On the CPO-5 block, well Mariposa-1 is currently at a casing point at 10,575ft.

John Wardle, Chief Executive Officer of Amerisur, commented:

"Our production expectations of Platanillo-22 have been exceeded by the testing results from the perforated interval, with further pay available in the well to exploit in the future. The important discovery that the OWC is deeper than the main field is very good news indeed, and we look forward to confirming the magnitude of the increase in reserves this creates as operations continue. This result will lead us to drill further wells from Pad 2N than previously envisaged, and we are currently planning the drilling of a third well from Pad 2N."

"I look forward to updating the market on the progress of Platanillo-21 and the continuing production from Platanillo-22."

Giles Clarke, Chairman of Amerisur said:

"The confirmation of the production potential of Platanillo-22 and the existence of a deeper OWC is an exciting development which adds further value to Amerisur shareholders through increasing our reserves and is an important step towards our production targets. Our continuing drilling success is a tribute to the quality of the Platanillo Field but also gives me great confidence in our ability to add further reserves from similar structures in our strategically located portfolio."

Competent person: Technical information in this announcement has been reviewed by John Wardle Ph.D., the Company's Chief Executive. John Wardle has 31 years' experience in the industry, having worked for BP, Britoil, Emerald Energy and Pebercan, and is a trained drilling engineer.聽

Glossary:

"Degrees API" - is a measure of the density of a hydrocarbon fluid. 10 degrees API is a hydrocarbon of equivalent density to fresh water. The higher the API in degrees, the less dense the hydrocarbon fluid. The API degree is calculated from the specific gravity of the hydrocarbon fluid via the following formula:

API Gravity (in degrees) = (141.5/Specific Gravity of fluid) - 131.5

ENDS

Enquiries:

Nick Harrison, CFO

Amerisur Resources

Tel: +44 (0)330 333 8246

Billy Clegg/Georgia Edmonds

Tel: +44 (0)203 757 4980

Camarco

Callum Stewart/Ashton Clanfield

Stifel Nicolaus Europe Limited

Tel: +44 (0)20 7710 7600

Chris Sim/George Price

Tel: +44 (0)207 597 4000

Investec

Darrell Uden/Marcus Jackson

RBC Capital Markets

Tel: +44 (0)207 653 4000

Notes to editors

Amerisur Resources is an independent full-cycle oil and gas company focused on South America, with assets in Colombia and Paraguay and production from the Platanillo field in southern Colombia. In 2016 Amerisur successfully built and is 100% owner of the strategic OBA oil transfer line into Ecuador.

In Colombia, the Company is operator and has a 100% working interest in the Platanillo block which includes the Platanillo field, which is currently producing circa 4,200 BOPD. The Company has a strong position in the Putumayo basin and has a cluster of near term activity assets around the OBA export line. It has a diverse portfolio of longer term exploration assets.

This announcement contains inside information as defined in EU Regulation No. 596/2014 and is in accordance with the Company's obligations under Article 17 of that Regulation.

www.amerisurresources.com

This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCEBLBLDZFFBBV
Date   Source Headline
23rd Jul 20192:15 pmBUSForm 8.3 - Amerisur Resources Plc
23rd Jul 20191:25 pmRNSForm 8.3 - Amerisur Resources plc - Amendment
23rd Jul 201912:00 pmRNSForm 8.5 (EPT/RI) - Amerisur Resources plc
23rd Jul 201911:55 amRNSForm 8.5 (EPT/NON-RI)
23rd Jul 201910:58 amRNSForm 8.5 (EPT/NON-RI)
23rd Jul 201910:01 amRNSForm 8.3 - Amerisur Resources plc
23rd Jul 20199:48 amGNWForm 8.5 (EPT/RI) - Amerisur Resources plc
22nd Jul 20194:09 pmEQSForm 8.3 - Chelverton UK Dividend Trust plc: Amerisur Resources Plc
22nd Jul 20193:29 pmRNSForm 8.3 - Amerisur Resources Plc
22nd Jul 20193:18 pmRNSForm 8.3 - [AMERISUR RESOURCES PLC]
22nd Jul 201912:00 pmRNSForm 8.5 (EPT/RI) - Amerisur Resources plc
22nd Jul 201911:57 amRNSForm 8.5 (EPT/NON-RI)
22nd Jul 201911:45 amPRNForm 8.3 - Amerisur Resources Plc
22nd Jul 201910:48 amRNSForm 8.5 (EPT/NON-RI)
22nd Jul 201910:38 amRNSForm 8.3 - Amerisur Resources plc
22nd Jul 201910:24 amGNWForm 8.3 - [Amerisur Resources plc]
22nd Jul 20199:01 amGNWForm 8.5 (EPT/RI) - Amerisur Resources plc
22nd Jul 20198:10 amRNSPossible offer from Etablissements Maurel & Prom
22nd Jul 20197:00 amRNSPossible Offer for Amerisur Resources plc
19th Jul 20192:28 pmRNSForm 8.3 - Amerisur Resources Plc
19th Jul 20199:30 amRNSStrategic review including formal sale process
17th Jun 20197:00 amRNSProposed Disposal of 50% of Put-8 to Occidental
17th Jun 20197:00 amRNSSol-1 Update
11th Jun 20197:00 amRNSOperations Update
31st May 20197:00 amRNSBlock Listing Six Monthly Return
29th May 201911:05 amRNSHolding(s) in Company
14th May 20195:00 pmRNSResult of Annual General Meeting
14th May 20197:00 amRNSPre AGM Operations Update
9th May 201911:00 amRNSNotice of Annual General Meeting
7th May 20197:00 amRNSOBA Third Party Transportation Approvals
23rd Apr 20197:00 amRNSDeath of Non-Executive Director
15th Apr 20197:00 amRNSLong Term Incentive Plan ("LTIP") Awards
9th Apr 20197:00 amRNSFinal Results for the year ended 31 December 2018
26th Mar 20197:00 amRNSOperations Update
20th Mar 20197:00 amRNSExercise of Right of First Refusal Put-8
6th Mar 20197:00 amRNSReserves Update
4th Feb 20197:00 amRNSSpudding of Calao-1X, CPO-5
23rd Jan 20197:00 amRNSExercise of Options under Long Term Incentive Plan
22nd Jan 20197:00 amRNSReserves, Operational and Production Update
3rd Jan 20191:24 pmRNSDirector Share Dealing
3rd Jan 20191:10 pmRNSDirector Share Dealing
2nd Jan 20192:51 pmRNSDirector Share Dealing
2nd Jan 20197:00 amRNSCPO -5 Operational Update
31st Dec 201812:33 pmRNSRetirement of Non-Executive Director
31st Dec 20187:00 amRNSCompletion of Putumayo Acquisition
27th Dec 20187:00 amRNSDirectorate Change
18th Dec 20184:37 pmRNSPrice Monitoring Extension
10th Dec 20187:00 amRNSOil Discovery at Indico-1
30th Nov 20187:00 amRNSBlock listing six monthly return
29th Nov 20188:49 amRNSDirector Share Dealing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.