Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmara Mining Regulatory News (AMA)

  • There is currently no data for AMA

Operations Update

17 Aug 2006 07:01

Cluff Gold PLC17 August 2006 17 August 2006 CLUFF GOLD PLC Encouraging drill results from Angovia Gold Project, Cote d'Ivoire Update on Baomahun Gold Project, Sierra Leone Angovia Cluff Gold Plc ("Cluff Gold" or "the Company") today announces assay resultsfrom the ongoing reverse circulation (''RC'') drill programme at the AngoviaGold Project ("Angovia" or "the Project") in Cote d'Ivoire. Further resultshave now been received from Prospects 2, 3 and 4. Highlights: • 5,700 metres of drilling completed to date • Established mineralised trends confirmed by infill drilling results • Mineralisation remains open along strike and down dip of the four satellite deposits drill tested to date. • Oxide ore from all satellite deposits treatable in a central heap leach plant • Best intercepts: • ARC49 intersects 47m @ 2.62 g/t Au • ARC122 intersects 3m @ 38.99g/t Au (including 1m @ 114.37g/t Au) • ARC118 intersects 1m @ 48.33 g/t Au The infill drilling is being done at fifty-metre centres between sections inorder to confirm continuity of mineralisation. Below is a table of some of the significant intersections encountered in holesat all Prospects using a cut off grade of 0.5g/t Au: Hole ID Dip (degrees) Intercept From (m) Prospect Comment ARC49 45 5m@1.02g/t 2 4ARC49 45 2m@4.42.36g/t 20 4ARC49 45 13m@1.09g/t 54 4ARC49 45 47m@2.62g/t 69 4ARC50 45 4m@1.47g/t 52 4ARC50 45 8m@2.20g/t 73 4ARC50 45 3m@1.02g/t 85 4ARC50 45 2m@1.35g/t 96 4ARC50 45 10m@1.62g/t 120 4ARC51 55 10m@1.72g/t 41 4ARC51 55 2m@2.58g/t 83 4ARC51 55 6m@3.10g/t 89 4ARC52 55 14m@1.76g/t 46 4ARC52 55 5m@1.14g/t 63 4ARC52 55 24m@1.17g/t 81 4ARC117 50 3m@6.84g/t 15 2ARC117 50 9m@2.47g/t 24 2ARC117 50 2m@1.13g/t 49 2ARC118 50 1m@48.33g/t 1 2ARC118 50 1m@1.99g/t 13 2ARC118 50 1m@2.67g/t 19 2ARC119 50 8m@2.32g/t 5 2ARC120 50 8m@2.18g/t 26 2ARC122 50 3m@38.99g/t 46 2 Including 1m@114.3 7g/t from 46m ARC124 50 2m@1.05g/t 1 3ARC124 50 3m@2.40g/t 49 3ARC125 50 2m@1.70g/t 21 3ARC125 50 3m@1.22g/t 27 3ARC126 50 1m@19.48g/t 8 3 The current drilling is being undertaken to define near surface oxide resourcesfrom the four satellite deposits - Prospect AN2, Prospect 2, Prospect 3 andProspect 4 - tested to date. It is planned that the ore from these depositscould be trucked and treated in the recently purchased heap leach processingplant, located centrally in the Angovia permit area. Historical data fromCOGEMA's previous mining activities demonstrates that heap leach recoveries ofup to 80% are achievable for the near surface oxide ore using the existingplant. The vertical depth of oxidation in the drilled out areas is 70 metres. Theunderlying sulphides below the satellite ore bodies, and the areas which wereformerly mined for oxides by COGEMA, will be investigated in due course. Themineralisation remains open along strike and down dip of the four satellitedeposits drill tested to date. Douglas Chikohora, Technical Director of Cluff Gold plc, comments, "The latestinfill assay results at Angovia continue to confirm the continuity ofmineralisation on the Angovia project and demonstrate good gold grades. We awaitthe assay results from the remaining holes from Prospect 3 before undertaking aresource update in early September.'' Baomahun A resource update is underway at the Baomahun Gold Prospect in Sierra Leonefurther to the follow up drilling programme which was conducted to define thestrike and down dip extensions of the Eastern, Central and Western zones of thedeposit. This update is expected to be announced by the end of the month. Qualified Person: Douglas D Chikohora has reviewed the information contained in this announcement.Douglas D Chikohora, Msc, MIMMM, CEng, is the Technical Director of the Company. For further information, please contact: Cluff Gold WH Ireland Parkgreen CommunicationsJ.G. Cluff / Douglas Chikohora David Youngman Cathy Malins / Annabel LeatherChairman / Technical Director Tel: 0161 832 2174 Tel: 020 7493 3713Tel: 020 7340 9790 Notes to Editors: Mt. Yaoure, Cote d'Ivoire The Mt. Yaoure permit is located 40km northwest of Yamoussoukro, the politicalcapital of Cote d'Ivoire, and covers a surface area of 534km(2). The licencearea includes the Angovia gold mine which operated between 1998 and 2003. Themine reportedly produced over 180,000 ounces of gold during this period by heapleaching some 2 million tonnes of oxide material. The Cote d'Ivoire governmenthas issued a certificate to CMA, a subsidiary of COGEMA, the French uraniummining group, evidencing that it has complied with the work prescribed by themining regulations relating to the protection of the environment and therestoration of the part of the licence area covered by the Angovia gold mine. The infrastructure in the area is good and includes a hydroelectric dam sixkilometres from the Angovia mine site. About Baomahun: Baomahun is located about 180 km east of the capital of Sierra Leone, Freetown,in the Southern Province of the country and the geological setting is similar tothe Lake Victoria goldfields in Tanzania. Cluff Gold has a right to earn a 60%interest in Baomahun by funding the project to the completion of a bankablefeasibility study or to a maximum of US$5 million. This right is to be acquiredfrom Winston Mines which owns the two exploration licences relating to Baomahun,covering an area of approximately 137 km(2). This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 201412:10 pmRNSResult of Annual General Meeting
30th May 20147:00 amRNSYaoure In-Fill Drilling Results
20th May 201412:01 pmRNSDIRECTORS' DEALINGS
19th May 20147:00 amRNS1st Quarter Results
13th May 20147:00 amRNSCHANGE IN REPORTING ISSUER STATUS IN CANADA
12th May 201412:03 pmRNSPOSTING OF ANNUAL REPORT & NOTICE OF AGM
9th May 20144:42 pmRNSTR-1: Notifications of Major Interests in Shares
1st May 20147:00 amRNSTechnical Report
30th Apr 20149:39 amRNSTr-1 Notification of Major Interest in Shares
23rd Apr 201411:02 amRNSTR-1 Notification
22nd Apr 201410:11 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
17th Apr 20144:00 pmRNSTotal Voting Rights
15th Apr 20147:00 amRNS2013 AUDITED FULL YEAR RESULTS
11th Apr 201412:40 pmRNSRESULT OF OPEN OFFER AND RESULT OF GENERAL MEETING
8th Apr 201410:57 amRNSTR1 Notification of Major Interest in Shares
8th Apr 201410:52 amRNSTR1 Notification of Major Interest in Shares
1st Apr 20147:00 amRNSPRESENTATION AT UK INVESTOR SHOW
31st Mar 20147:00 amRNSNOTICE OF RESULTS
24th Mar 201410:07 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
24th Mar 20147:00 amRNSExpected Timetable of Principal Events
21st Mar 20147:00 amRNSIssue of Equity
20th Mar 20147:00 amRNSHOLDING(S) IN COMPANY
13th Mar 20144:40 pmRNSSecond Price Monitoring Extn
13th Mar 20144:35 pmRNSPrice Monitoring Extension
12th Mar 20147:00 amRNSPRELIMINARY ECONOMIC ASSESSMENT FOR YAOURE
10th Feb 20147:00 amRNSEVENING OF PRESENTATIONS FOR PRIVATE INVESTORS
30th Jan 20147:00 amRNSRESULTS OF FIRST PHASE OF BAOMAHUN OPTIMISATION
23rd Jan 20147:00 amRNSFiling of Technical Report
22nd Jan 20143:35 pmRNSNotification of Major Interest in Shares
20th Jan 20147:00 amRNS2013 PRODUCTION RESULTS FOR KALSAKA/SEGA GOLD MINE
23rd Dec 20139:43 amRNSDIRECTORS' DEALINGS
20th Dec 20137:00 amRNSCHANGE OF ADVISERS
13th Dec 20137:00 amRNSSIX MILLION OUNCE MINERAL RESOURCE AT YAOURE
11th Dec 20134:40 pmRNSSecond Price Monitoring Extn
11th Dec 20134:35 pmRNSPrice Monitoring Extension
28th Nov 20133:38 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
26th Nov 20139:20 amRNSSHARE PURCHASE AGREEMENT AND DIRECTORATE CHANGES
20th Nov 20133:45 pmRNSIssue of Consideration Shares
20th Nov 20137:00 amRNSQ3 2013 UPDATE
18th Nov 20135:40 pmRNSHolding(s) in Company
7th Nov 20137:00 amRNSShare Purchase Agreement with Amlib Holdings Plc
22nd Oct 20137:00 amRNSPRESENTING AT THE LONDON INVESTOR SHOW
21st Oct 20137:00 amRNSAPPLICATION FOR VOLUNTARY DELISTING FROM TSX
17th Sep 20137:00 amRNSCOMMENCEMENT OF TRUCKING OF MATERIAL FROM SEGA
16th Sep 20133:40 pmRNSDIRECTORS' DEALINGS
10th Sep 20135:25 pmRNSHolding(s) in Company
10th Sep 20137:00 amRNSH1/Q2 2013 RESULTS
30th Aug 201310:15 amRNSHolding(s) in Company
16th Aug 20137:00 amRNSFILING OF TECHNICAL REPORT FOLLOWING BAOMAHUN FS
18th Jul 20137:00 amRNSGRANTING OF MINING LICENCE FOR SEGA GOLD PROJECT

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.