If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

Share Price is delayed by 15 minutes
Get Live Data
872.00    -32.00 (-3.54%)
Bid:
864.00
Ask:
878.00
Spread: 14.00 (1.62%)
Market Cap: £238.34m
ALTN Live PriceLast checked at - London Stock Exchange

Intraday Altyngold Share Chart

Production Update

10 Jan 2011 10:33

Hambledon Mining Plc

("Hambledon" or "the Company")

10 January 2011

The issuer advises that the following replaces the announcement No. 0109005025 made today at 07.00 which incorrectly stated some of the figures in the table of production. Given below is the full text of the corrected announcement.

The Company reports its production for the three months from 1 October 2010 to 31 December 2010.

October November December Total
Milled tonnes (dry) 83,794 66,368 46,763 199,925
Gold grade (g/t) 0.93 1.20 1.42 1.14
Contained gold (gms) 78,119 83,259 66,302 227,682
Contained gold (oz) 2,511 2,676 2,133 7,320
Gold recovery % 85.2 % 84.2% 83.7% 84.4%
Recovered gold (oz) 2,359 2,268 1,864 6,491
Recovered silver (oz) 5,035 5,076 3,451 13,562

PROCESSING

The 4th quarter of 2010 consolidated the performance of the Sekisovskoye operation as the metallurgical plant achieved good production and sustained higher levels of gold recovery. Mining activities were primarily from the main open pit, with modest amounts of ore extracted from the north pit. The phase 1 refurbishment of the two main hydraulic excavators was undertaken during the quarter, matched to ore inventory levels, so that production from the open pit mine was not hampered.

The performance of the metallurgical plant has been improved with recovery levels averaging 84.7% for Q4, and YTD 83% for gold, and for silver 86% in Q4, and 84% YTD. Work is ongoing to improve the grinding of the ore prior to cyanidation and to improve the dissolved oxygen levels in the cyanide circuit. With this we aim to improve plant recovery to a sustainable 85%-90% recovery of both gold and silver. GBM Minerals Engineering Consultants Ltd.,London, have been engaged to assist with the plant optimisation programme. The mined gold grade at Sekisovskoye remains erratic and is predicted to remain volatile until the open pit mine is deepened further.

Phase 1 winterisation of the crushing and screening plant was completed prior to the onset of the harsh winter period. This infrastructure has helped to mitigate the impact of the cold weather on plant operations. Phase 2 winterisation, combined with upgrading of the surface infrastructure will be undertaken in 2011, in conjunction with construction works associated with the underground mine project.

The cold continental climate is predicted to be harsh in Q1 2011 and whilst the Sekisovskoye operation has remedied the most sensitive components of the surface infrastructure, gold output is budgeted to be less during this winter period.

UNDERGROUND

Development of the underground infrastructure and access tunnels is progressing well, and on schedule to extract ore in December 2011. To date, the infrastructure installed includes electrical substations, dewatering stations, explosives magazines and electrical reticulation for ventilation and construction equipment. The tunneling contractor continues to achieve its driveage targets and maintain a good safety record.

The diamond drilling programme to delineate the resources for the underground mine has commenced. A programme of some 25,000 meters is planned, which will be completed during the second half of 2011. The information from the drilling and sampling will validate the Soviet resource statement, allow detailed mine planning and extraction scheduling as well as upgrade a portion of the resources from inferred to JORC Measured and Indicated. A revised mineral resource and ore reserve statement will be prepared in Q1 2011 reflecting the increased geological knowledge.

Engineering and mine design studies undertaken by consultants AMC of Australia have been completed and additional studies by Golders Associates UK are now focused on the detailed engineering studies relating to the operational design and strata control aspects of the underground operation.

The project will be using a combination of contract mining services and the Company's own resources to further develop the underground operations at Sekisovskoye.

INFRASTRUCTURE

A review of the Life of Mine project cost base (Open Pit and Underground) has highlighted that to meet long term security of electrical supply, lowest process waste capital and unit costs, maintenance of environmental compliance and a continuation of the low social and environmental impact of the operation; upgrading of the surface infrastructure is required. These works will take place in 2011 in order that the underground project development and construction works can be carried out symbiotically and at lowest construction cost.

GBM Minerals have been engaged to undertake various studies and provide site based staff to assist in the development of the mineral process plant and surface infrastructure. Golders Associates UK have been engaged to integrate the design of the process plant waste handling facility with the underground backfill and strata control plant and machinery.

ENQUIRIES:

HAMBLEDON MINING:

Telephone +44 (0)207 233 1462

Charles Zorab

FAIRFAX I.S. PLC:

Telephone +44 (0)207 598 5368

Ewan Leggat

Copyright Business Wire 2011

Date   Source Headline
19th Feb 200812:31 pmRNSUpdate Sekisovskoye Update
12th Feb 20081:52 pmRNSBoiler accident
1st Feb 20082:28 pmRNSDirector/PDMR Shareholding
24th Jan 20087:00 amRNSProject Update/ Board changes
19th Dec 20077:00 amRNSGold Production Commences
30th Nov 20077:00 amRNSOgnevka production commences
19th Nov 200712:03 pmRNSHolding(s) in Company
19th Nov 20079:07 amRNSAdmission of Placing Shares
19th Nov 20077:01 amRNSUpdate & Placing
8th Oct 200711:56 amRNSDirector Shareholding
28th Sep 200711:27 amRNSTotal Voting Rights
28th Sep 200711:26 amRNSDirector/PDMR Shareholding
17th Sep 20077:00 amRNSInterim Results
20th Aug 20079:17 amRNSAIM Rule 26
17th Jul 200710:15 amRNSAGM Statement
21st Jun 20073:00 pmRNSGrant of Options
5th Jun 20077:01 amRNSFinal Results
18th May 20071:36 pmRNSDirector Shareholding
16th May 20077:01 amRNSSekisovskoye Update
30th Apr 200712:18 pmRNSAdditional Listing
24th Apr 200712:44 pmRNSHolding(s) in Company
23rd Apr 200710:25 amRNSDirector/PDMR Shareholding
16th Apr 20077:01 amRNSRe proposed acquisition
2nd Apr 20078:00 amRNSDirectorate Change
14th Feb 20073:21 pmRNSHolding(s) in Company
14th Feb 200711:27 amRNSHolding(s) in Company
31st Jan 20077:01 amRNSTotal Voting Rights
29th Jan 20077:01 amRNSPlacing, Acquisition & Update
18th Dec 20062:20 pmRNSTotal Voting Rights
30th Nov 20067:01 amRNSProject Update
28th Sep 20062:06 pmRNSDirector Shareholding
27th Sep 20067:02 amRNSInterims; Resource update
17th Jul 200610:30 amRNSAGM Statement
22nd Jun 20067:01 amRNSFinal Results
26th Apr 20067:01 amRNSSekisovskoye permit received
23rd Mar 200610:49 amRNSHolding(s) in Company
10th Mar 20064:01 pmRNSHolding(s) in Company
2nd Mar 200612:24 pmRNSResult of EGM
8th Feb 20069:50 amRNSEquity Fundraising
24th Nov 20057:01 amRNSDrilling Results
4th Nov 200511:20 amRNSHolding(s) in Company
3rd Nov 200510:55 amRNSHolding(s) in Company
30th Sep 20057:00 amRNSInterim Results
22nd Jul 200510:15 amRNSAGM Statement
19th Jul 200511:14 amRNSDirector/PDMR Shareholding
14th Jul 200512:18 pmRNSDirector/PDMR Shareholding
29th Jun 20057:00 amRNSResource Statement
8th Jun 20052:07 pmRNSDirector Shareholding
7th Jun 20057:01 amRNSPreliminary Results
12th Apr 20053:23 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.