Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 114.00
Bid: 114.00
Ask: 124.00
Change: -0.50 (-0.42%)
Spread: 10.00 (8.772%)
Open: 114.00
High: 114.00
Low: 114.00
Prev. Close: 119.50
ALTN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Preliminary Results

7 Jun 2005 07:01

Hambledon Mining PLC07 June 2005 HAMBLEDON MINING PLC Preliminary Results Hambledon Mining Plc ("Hambledon" or the "Group" or the "Company), an AIM-listedmining and exploration company developing precious metal deposits in Kazakhstan,announces its unaudited Preliminary Results for the year ended 31 December 2004. Highlights: > Joined AIM in June 2004 raising £2.5m > Successful drilling programme showing greater open-pit resources > Open-pit project approved on a stand-alone basis > Open pit optimisation studies have identified three mineable ore zones allowing a 6-year open pit project life (approximately 600,000 tonnes per annum with around 30,000 oz per year gold production); operating costs of approximately US$250 per ounce > Construction planned to commence 2005; production mid-2006 > Initial production to be around 30,000 oz per annum rising to around 100,000 oz when underground ore is treated > Tserkovka tender won, adding over 700,000 ounces of Soviet P1 (Prognosticated) and C2 resource > £5m fundraising (before expenses) April 2005 Nicholas Bridgen, Chief Executive of Hambledon Mining Plc, commented: "AIM has seen many new mining entrants in the last 18 months. I am delightedthat Hambledon has either delivered or exceeded the commitments that we made onour entry to the market. "The open pit mine provides an efficient, viable and rapid route to production.Efficient because it allows us to establish a treatment plant for the open pitwhich can then be used for the underground mine. Viable because we can largelyfinance it out of the proceeds of our recent fundraising. Rapid in that itshould allow us to be in production and generate cash flow in 2006; allowing usto plan and develop the underground mine and to explore Tserkovkasimultaneously. "We look forward to continuing to deliver in 2006 and to propelling the Groupinto the ranks of profitable gold producers". 7 June 2005ENQUIRIES: Hambledon Mining PlcNicholas Bridgen, Chief Executive Tel: +44 7791 327180 Bankside Consultants Tel: +44 207444 4140Michael Spriggs / Michael Padley About Hambledon Mining Plc Hambledon Mining Plc is an AIM listed mining and exploration company developingprecious metal deposits in Kazakhstan. It holds the rights to the Sekisovskoyegold and silver deposit, on which the feasibility study is at an advanced stage,and has won the tender for the adjacent Tserkovka deposit and exploration areas.Construction of a treatment plant is scheduled to commence in the second half of2005, with start-up from open pit mining expected in mid 2006. The feasibilitystudy into the development of the larger underground resources is continuing. CHAIRMAN'S STATEMENT Review Hambledon has had a busy and exciting year. We completed the pre-feasibilitystudy on the Sekisovskoye project in May 2004. In June 2004 the Group wasreorganised under Hambledon Mining Plc and listed on the Alternative InvestmentMarket ("AIM") of the London Stock Exchange, raising £2.5 million beforeflotation costs to fund the ongoing needs of the business and to complete thefeasibility study. Subsequent positive results from this ongoing feasibility study and a successfuldrilling programme culminated in the board's decision to approve the stand-aloneopen pit project which has proven far more substantial than envisaged at thetime of the Company's flotation. In April 2005 we raised a further £5 million(before expenses) to allow us to finalise the open-pit element and furtherdevelop the overall project. In November 2004, we won a tender for the Tserkovka licence area, which isadjacent to our original Sekisovskoye licence. The new area, which will increasethe title area from around one square kilometre to some thirty squarekilometres, contains four areas of gold mineralisation known as Tserkovka,Feodulikha, Area 4 and Area 5. These areas were discovered in Soviet times andan initial evaluation of the data concludes that noteworthy gold mineralisationwill be focal points for exploration drilling targets. Some of these areascontain breccia types similar to those at Sekisovskoye, suggesting that theseare similar in nature and perhaps with a similar magnitude. In total, the newregion has added some 740,000 ounces to our current resource statement but thesewere based on only a limited amount of drilling and we believe that there isgood potential to increase the resource significantly. Project Developments Already, the current year is proving to be equally eventful. The immediate taskis to complete the regulatory approval steps required in Kazakhstan to put theSekisovskoye open-pit into production whilst we finalise the open-pitfeasibility study. These regulatory steps go beyond those normally required inWestern countries and represent a significant hurdle. Although we have anexcellent local team and are confident that the required submissions will bemade in good time, there is some uncertainty as to the speed with which theregulatory authorities can process the applications and there is a possibilityof some time slippage outside our control. If the necessary approvals arereceived on schedule, we expect to be able to start construction in late 2005,with start-up of production towards the end of the first half of 2006. In addition, we have already started the exploration of the new Tserkovka areaand will commence an initial programme of core drilling shortly. The newprospects are all within a five kilometre distance from the proposedSekisovskoye treatment plant and we envisage that, after exploration, the sameplant will be expanded to treat any mineable ore arising from this source. Initial gold production from the open pit is likely to be some 30,000 ounces peryear. Whilst the relevant aspects of the feasibility study have not yet beencompleted, we envisage that annual production will expand to around 100,000ounces as higher grade ore from underground is substituted over the followingtwo years. Thereafter, we will be looking for production to be further expandedfrom the new prospects, although this will, of course, depend upon the resultsof the ongoing exploration work. The current year is proving to be another year of achievement for Hambledon -the extensive drilling programme is underway, construction is about to start,and all the work being carried out continues to highlight the quality of ourresources. We have made very real progress since the flotation and we hope thatour shareholders share our excitement about the future prospects for ourcompany. REVIEW OF PROJECTS Sekisovskoye Summary • The full feasibility study initiated in 2004 is now nearing completion. We have employed a mix of local and western engineering groups that have maintained western standards while ensuring rapid processing of submissions by Kazakhstani authorities. • Additional drilling in the 2003 and 2004 seasons was mainly focused on due diligence, metallurgical samples, open pit geotechnics, continuity and sterilisation, with only minor drilling for orebody in-fill and extensions. Nevertheless, it has resulted in an increased open pit ore resource which has demonstrated the viability of the open pit project on a stand-alone basis. • The discovery of previously-unidentified "dilation zones" from closely-spaced drilling suggests that a significantly larger quantity of gold will be mined than the current resource statement suggests. • The geotechnical evaluation has confirmed that the orebodies occur in highly competent rock allowing steep mine bench and pit walls, thus reducing the overall stripping ratio significantly. We expect this will carry through to good mining conditions in underground mine development. • Recent metallurgical testing in Kazakhstan as well as in Australia has confirmed high gold recoveries (92-95%) with simple gravity and carbon-in-pulp leaching technology. • Environmental testwork conducted in Kyrgyzstan and Australia has verified the non-acidic nature of the ore and waste rock. • Open pit optimisation studies have identified three mineable ore zones allowing a six-year open pit project life (600,000 tonnes per annum with around 30,000 oz per year gold production) and operating costs of approximately US$250 per ounce. This offers an excellent starter project prior to development of the higher grade underground mine. Introduction The Sekisovskoye deposit was selected for further development for a number ofreasons. The deposit had undergone substantial development during Soviet timesand had significant Soviet classified resources. The main ore zones outcrop in alow hill, providing easy initial access, but gold-bearing mineralisationcontinues to a depth of at least 950 metres. The ore is free-milling andtherefore simple to treat via carbon-in-pulp cyanidation technology with gravityrecovery of coarse gold. It has a low sulphide content with no arsenic or otherdeleterious elements, giving relatively few environmental concerns. In addition, the project site is located near Sekisovka village which is onlysome 40 km from the major regional city of Ust Kamenogorsk (capital of EastKazakhstan Oblast) on a well-maintained sealed road. Ust Kamenogorsk has aninternational airport as well as connections to both major highway and raillinks (including the Trans-Siberian Railway). Several high voltage power linesrun through the area, providing cheap electricity due in part to generation fromhydroelectric schemes. Sekisovka village has telephone and internet serviceswhile the area in general is home to several major mining enterprises, ensuringa supply of experienced and relatively low-cost labour. The exploration and mining rights are held by TOO Sekisovskoye (a 100% ownedsubsidiary) under a licence and sub-soil use contract which expire in July 2020but which can be extended. The costs of building the treatment plant and starting open-pit production areprojected to be low as a result of the proximity to infrastructure, theoutcropping nature of the ore, the simple treatment methodology required forgold recovery, and the sourcing of plant, engineering and equipment eitherlocally or from the former Soviet Union. Overall, the capital costs are estimated at approximately £5.5 million(approximately US$10 million). Based on the preliminary studies and new data tohand, production costs are expected to range from around US$250 per ounce fromthe initial open pit, to about US$175 per ounce when wholly underground ore istreated. Financing for the plant construction will come from the recent equityissue, supplemented by loans from local banking institutions. Feasibility Study The feasibility study currently underway was predicated on preliminary studiesof milling and mining methods conducted in 2003 as well as geological modelsprepared by Computer Resource Services (based in Almaty and the UK). Initially a500,000 tonnes per annum mining/treatment rate was envisaged but this has beenincreased to 600,000 tonnes per annum. The initial annual gold production(including silver equivalent) will be around 30,000 oz based on an open pit millfeed grading from 1.6 g/t of gold at a stripping ratio of less than 1.5 to 1.When higher grade underground ore is mined, annual production is expected torise to around 100,000 ounces from the same process plant. We anticipate that local mining contractors will carry out the open pit miningusing standard open-cut drill and blast techniques. Since the ore outcrops,there will be no pre-strip required to access mill feed. Run-of-mine ore will bedelivered to a pad or directly fed to a 200 tonnes per hour ("tph") crushingplant. Crushed ore will be milled at an average rate of 75 tph with cycloneunderflow directed to a gravity concentration circuit. Cyclone overflow will bedirected to a carbon-in-pulp circuit with a minimum of six stages and 30 hoursof total retention. After gold recovery, the mill tailings will be thickened anddetoxified before pumping to a surface tailings storage facility. Tailingsreturn water will be recycled such that the overall project will be a "zerodischarge" facility. Gold recoveries of 92 to 95% are expected, based onprevious and current testwork, with relatively low cyanide and lime usages (0.4to 0.7 kg/t and 1.2 kg/t respectively). Once the open-pit is in production, we will initiate development of the highergrade underground ore almost immediately. The Soviet exploration developmentsincluded an adit level and a shaft to another level 120 metres below surface. Weenvisage that further underground drilling will be conducted from these levelsand trial underground mining will provide some higher grade ore as mill feed atan early stage. In any event, we consider that it is important to begindevelopment of the underground resources as quickly as possible so that highergrade underground ore can be substituted for the lower grade open-pit ore. Basedon the current mine development plan, we expect annual gold production fromunderground mining to reach up to 100,000 oz (gold equivalent) with an overallproject life exceeding 10 years. It is likely that the plant will later beexpanded to treat the remaining open pit ore plus ore from any successfuldevelopment of Tserkovka or other exploration targets. We intend to construct the milling facilities so that they can be easilyexpanded to cope with the additional open pit or underground resources that weexpect to identify from the other known deposits on the Sekisovskoye andadjoining Tserkovka leases. Drilling During the 2004 drill season 40 diamond drill-holes totalling 3,984 metres and52 sterilisation holes totalling 1,140 metres were completed at the SekisovskoyeProject site. The goals of the 2004 drilling were several: • To expand knowledge of the rock geotechnical characteristics for mine design; • To obtain core samples for physical testing (mining and milling) and for the metallurgical testing programmes; • To verify the continuity of gold mineralisation using a pattern of closely spaced drillholes over an area of 40 x 40 metres; • To provide in-fill drill data and identify potential orebody extensions for initial open pit operations; and • Plant and tailings area sterilisation. The results of this drilling included: 1. The open pit geotechnical studies show that slope angles can be increased to 55+ degrees, thus improving stripping ratios; 2. The continuity drilling demonstrates that the former Soviet modeling approach did not always adequately represent the geometry and spatial grade distributions and that unexpected large dilation zones, containing high grades and tonnages, can be expected during open pit operations; and 3. Infill drilling results reveal that significant additional zones of gold mineralisation can be expected and that continuity extensions of these zones beyond the delineated known limits of the deposit will add to the resource. Geology The main focus of activities over the period has involved the collation,assessment and updating of the geological and assay databases from the recentdrilling programmes for the Sekisovskoye deposit. This resulted in a newresource modeling approach that better reflects our understanding of the spatialgold grade distributions and geometry within the breccia pipe. Final adjustmentsto the new open pit model are nearing completion. Under the direction of our Project Director, Baurzhan Yerkeyev, we havesignificantly increased our technical staff by retaining five experiencedgeologists and four support staff. Roger Rhodes of Computer Resource Services(UK) has been retained to assist in drilling programme development andassessment of results. We have continued to expand the Group's capabilities foron-going exploration and mine operations in order to meet both our short-termand long-term goals. Mining Engineering Western consultants as well as local mining personnel have been involved indeveloping mining concepts for use in open pit and underground mining. The boarddecided in March to proceed with an open pit mining project based on thefavourable results of the 2004 drilling. Several options for development of theunderground resource are currently under consideration. We have already recruited an open pit mine design engineer while near-term plansrequire the hiring of a senior expatriate mining engineer and a localunderground mining specialist. Detailed planning for underground mining will beundertaken when the new in-house team has had time to make a detailedexamination of the various options. Geotechnical Issues A study was completed on the open-pit geotechnical issues based on laboratorytesting of samples obtained in the 2004 drilling programme. The results haveindicated that steep bench and pit walls can be used. These steep pit angleshave contributed significantly to a reduction in the projected strip ratiorequired for open pit mining. The study also indicates that overall undergroundmining conditions related to rock characteristics will be favourable. Site Survey In 2004 we conducted a detailed survey of the exploration licence area which wasemployed in the drilling programme and in rationalising previous drill resultsfrom Soviet times. We also conducted a survey of the 441 level adit and previoustrial mining workings. State-of-the-art survey equipment has been purchased to meet our on-goingrequirements for exploration, site construction activities and mining. Hydrogeology Extensive hydrogeological investigations were conducted in Soviet times tosupport exploration and mining activities. This database has been collected,collated and summarised in a new report for use in on-going studies. With asmall verification programme, the previous database is considered sufficient foruse in mining licence submissions. Additional work is underway regardinggroundwater mapping in the tailings dam area, determination of available watersupply sources, updating requirements for dewatering of underground workings,and other water-related issues. Processing & Infrastructure Metallurgical samples obtained from the 2004 drilling programme and additionalunderground channel samples were submitted to the Vnitsvetmet Institutemetallurgical facilities in Ust Kamenogorsk, East Kazakhstan, for development ofthe process flowsheet. The results supported previous testing programmes thatidentified gravity recovery followed by cyanide leaching of gravity tailings asthe most effective flowsheet for gold and silver recovery. Recoveries in therange of 92 to 94% gold and around 70% silver were achieved at a cyanideconsumption of 0.4 kg/t. Core samples were also sent to the AMMTEC facilities in Perth. Physical testingis now complete and optimisation of the gravity and leach circuits is underway.Additional characterisation of the ores, including tailings behaviour, will begenerated for use in process and tailings storage facility design (TSF). A preliminary assessment of TSF requirements was prepared by Australian TailingsConsultants (Melbourne). On-going site investigations are underway, includingadditional sterilisation drilling, soils assessments, hydrogeology in the areaand geotechnical investigations for determination of construction requirementsfor mill facilities, sedimentation dams and waste stockpiles. Several options are available regarding high voltage power supply to the projectsite. A recently-completed study of the most likely options is being reviewedand negotiations will be initiated within the next few weeks. Water supply for construction and milling will be supplied for the most part bymine dewatering and existing bores. The hydrogeological investigations willfinalise water supply issues within the next drilling season. Ecology We carried out a baseline environmental study using local specialists inconjunction with Wardell-Armstrong International (UK) to ensure that westernenvironmental and social standards are met. We are currently augmenting baselinedata through continuing soil and water sampling, weather data collection, etc.Community and stakeholder liaisons have been initiated. Representative samples of waste and low grade ore have been tested for acid rockdrainage characterisation. The results show that the acid generating potentialis very low to negligible. This is in line with the quartz-carbonate, lowsulphide mineralogy of the deposit. Tserkovka Prospect TOO Sekisovskoye won the tender for Tserkovka in November 2004 and is nowfinalising the Subsoil Use Agreement with the Government. A highly prospectivearea, 39 sq km in size, Tserkovka is adjacent to and surrounds the 100%-ownedSekisovskoye licence. The area was developed in Soviet times and contains fourknown areas of mineralisation. Soviet era reports refer to 740,000 oz of gold,mostly in the Soviet P1 (Prognosticated) resource category with a little C2.Planning for a 4,000 metre drilling programme is currently underway followingsite surveying and a review of existing Soviet drill data. Exploration sampling data covering the Tserkovka and three other prospectiveareas in the region have been have been received and are being compiled into acomprehensive database. Assessment of the sampling results from the formerSoviet drill logs and plans show positive targets for further exploration. • Tserkovka is situated 5.5km NW along strike from the Sekisovskoye deposit and here a number of gold zones have been intersected from surface, underground and drillhole sampling. A total of 91 exploration drillholes (1978 and 1982) to a maximum depth of 400m were drilled along cross sections, of which 70 were drilled for in situ rock type determinations. Potentially auriferous breccia rocks, similar to the gold breccia zones at Sekisovskoye, were intersected along a strike length of 400m and reported to contain sulphides. Additional exploration work, via a 450m long adit, showed high grade gold mineralisation from channel sampling such as 13.6 g/t over a length of 5.2m and 8.6 g/t over a length of 15.0m. Other encouraging results included channel samples of 8.1 g/t over 10m and 11.7 g/t over 6.6m. Continuity of this gold mineralisation to surface was confirmed from surface trench sampling, with a maximum gold grade of 159 g/t across a 1.3m wide zone. • Area 4 is situated 1 km NNE of Sekisovskoye and numerous lithology holes were drilled to bedrock for rock type determinations. Some low grade gold was intersected at a granite/diorite contact, but no potentially auriferous-type breccia has been reported in this area so far. At present, Area 4 will have a relatively low exploration priority. • Area 5 is centred 800m SE along strike from Sekisovskoye and appears be potentially more attractive as an exploration target than Area 4. Here, well-developed breccias, up to 200m wide, were interpreted on the geological sections. Exploration diamond drill holes reached a maximum depth of 530m and one hole intersected a 1m gold zone grading 6.8 g/t within a breccia zone. It should be noted that in this Area 5, unreliable spectral analysis was first used to assess the presence of gold and, if positive, fire assay would be used to accurately determine the gold content of the core samples. This indicates that gold mineralisation may have been missed and, with the presence of wide breccia zones along strike from Sekisovskoye, this area has very good potential. • Feodulikha is situated 3.5 km west of Sekisovskoye. At the moment only very limited data have been received and this includes a geological section with 2 drillholes and a plan showing a projected 250m long mineralised zone with trench sample data. Only minor gold grades have been seen to date, but plans show other additional holes for which drill logs are required before a proper assessment of this area's potential can be concluded. CONSOLIDATED PROFIT AND LOSS ACCOUNT Notes Year ended Year ended 31 Dec 2004 31 Dec 2003 Unaudited Unaudited £000's £000's Administrative expenses: - exceptional expenditures (96) (69) - other administrative expenses (331) (96) ----------- ----------- OPERATING LOSS (427) (165) Net interest and similar charges (11) (22) LOSS ON ORDINARY ACTIVITIES BEFORE TAXATION AND TRANSFERRED TO ----------- ----------- RESERVES (438) (187) RETAINED LOSS FOR THE FINANCIAL YEAR (438) (187) =========== =========== Loss per ordinary share UK pence per share) 3 (0.22) (0.09) Diluted loss per share (UK pence per share) 3 (0.22) (0.09) All results are derived from ongoing activities. CONSOLIDATED BALANCE SHEET As at As at 31 Dec 2004 31 Dec 2003 Unaudited Unaudited £000's £000's FIXED ASSETS: Intangible assets 672 238 Tangible assets 19 1 ------------ ----------- 691 239 ------------ ----------- CURRENT ASSETS: Debtors 13 11 Cash at bank and in hand 1,263 14 ------------ ----------- 1,276 25 ------------ ----------- CREDITORS: AMOUNTS FALLING DUE WITHIN ONE YEAR (418) (394) ------------ ----------- NET CURRENT ASSETS / (LIABILITIES) 858 (369) ------------ ----------- NET ASSETS / (LIABILITIES) 1,549 (130) ============ =========== CAPITAL AND RESERVES: Called up equity share capital 200 - Share premium account 2,069 - Merger reserve (148) - Profit and loss account (572) (130) ------------ ----------- EQUITY SHAREHOLDERS' FUNDS 1,549 (130) ============ =========== CONSOLIDATED CASH FLOW STATEMENT Year ended Year ended 31 Dec 2004 31 Dec 2003 Unaudited Unaudited £000's £000's Net cash(outflow)/inflow from continuing operating activities (428) 119 ------------ ----------- Returns on investments and servicing of finance Interest received 27 - Interest paid (16) (18) ------------ ----------- 11 (18) ------------ ----------- Capital expenditure and financial investment Purchase of fixed assets (453) (54) ------------ ----------- Net cash outflow (870) 47 ------------ ----------- Financing Issue of ordinary share capital (net of share issue expenses) 2,119 - ------------ ----------- Increase in net cash in the period 1,249 47 ============ =========== Analysis and reconciliation of net (debt) / funds (unaudited) As at Cashflow Exchange As at 31 Dec 2003 Movements 31 Dec 2004 ------------ --------- --------- ------------ Cash at bank 14 1,239 11 1,263 and in hand ------------ --------- --------- ------------ Debt due (340) 53 13 (273) within one year ------------ --------- --------- ------------ Net (debt) / funds (335) 1,292 24 835 ============ ========= ========= ============ STATEMENT OF TOTAL RECOGNISED GAINS AND LOSSES AND RECONCILIATION OF MOVEMENTS IN SHAREHOLDERS' FUNDS Year ended Year ended 31 Dec 2004 31 Dec 2003 Unaudited Unaudited £000's £000's Statement of total recognised gains and losses Profit (loss) for the financial year (438) (187) Foreign exchange loss arising on retranslation of subsidiary entities' opening balances (2) - Foreign exchange loss arising from reorganisation (2) - ------------ ----------- Total recognised gains and losses since 31 December 2003 (442) (187) ------------ ----------- Reconciliation of movements in Group shareholders' funds Total recognised gains and losses (442) (187) New share capital subscribed 200 - New share premium subscribed 2,450 - Issue costs offset against share premium (381) - Merger reserve (148) - Net change in shareholders'funds 1,679 (187) Opening shareholders' funds on 1 January 2004 (130) 57 ------------ ----------- Closing shareholders'funds 1,549 (130) ============ =========== NOTES TO PRELIMINARY RESULTS 1. Statutory accounts The financial information presented does not constitute statutory accounts as defined in Section 240 of the Companies Act 1985 as amended. The results have been extracted from the accounts of the Company for the year ended 31 December 2004. The financial information contained herein has been prepared on the basis of the accounting policies to be set out in the accounts for the year ended 31 December 2004. The financial information has been prepared on the going concern basis. The Company's Annual Report and audited accounts will be sent to shareholders and delivered to the Registrar of Companies in due course. This report will contain complete notes to the accounts. 2. BASIS OF PREPARATION Hambledon was incorporated on 18 February 2004 and its Ordinary Shares were listed on the Alternative Investment Market on 10 June 2004 (the "Listing"). Hambledon acquired the Hambledon Mining Company Limited ("HMC") Group shortly before listing. Prior to the Listing, the HMC Group comprised HMC, a company incorporated and resident in the British Virgin Islands, and its subsidiary TOO Gornorudnoe Predpriatie Sekisovskoye ("TOO Sekisovskoye"), a company incorporated and resident in Kazakhstan. After the Group reconstruction on 3 June 2004, HMC became a 100% owned subsidiary of Hambledon Mining Plc., with its underlying investment in TOO Sekisovskoye remaining unchanged. The directors believe that the preparation of the financial statements on the basis that the Group had existed throughout the two-year period beginning 1 January 2003 is the most meaningful way to reflect the operation of the Group. Hambledon's combination with the HMC Group has been accounted for as a group reconstruction under the provisions of FRS 6 ("Mergers and Acquisitions") and is presented as if the Company had been the holding company of the HMC Group for each year presented. As the Company was only incorporated on 18 February 2004, the Company Balance Sheet is presented at 31 December 2004 only and no comparatives are presented. The consolidated financial information for the Group has been prepared under the historical cost convention and in accordance with applicable United Kingdom accounting standards. This year, for the first time, the financial statements are presented in UK pounds. The move results from the growing preponderance of Sterling in the make-up of the Group's costs following the reconstruction referred to above and the Company's listing on AIM. Almost none of the Group's costs is dollar based and the continuing use of US dollars as the Group's reporting currency would have lead to the reporting of significant but illusory exchange differences. Sterling is now regarded as the Company's functional currency. 3. EARNINGS PER ORDINARY SHARE 31 Dec 2004 31 Dec 2003 Unaudited Unaudited £000's £000's Loss for the period (438) (187) Weighted average number of ordinary shares 199,765,328 199,765,328 ---------- --------- Loss per ordinary share (UK pence per share) (0.22) (0.09) Diluted loss per share (UK pence per share) (0.22) (0.09) It has been assumed that the number of Ordinary Shares in issue immediately after Listing (being 199,765,328) had been in issue from 1 January 2003. The directors believe that this provides a more meaningful comparison of the Group's ongoing business than would have been the case if the shares had only been included from the date of issue. 4. Post Balance Sheet items Acquisition of Tserkovka, Feodulikha, Areas 4 & 5 In November 2004, the Company's wholly owned subsidiary TOO Sekisovskoye was notified that it had won the tender for the exploration and mining rights to the area known as Tserkovka and surrounding territory, amounting to some 29 square kilometres. The Company is now formalising a Subsoil Use Contract. The associated Minimum Work Programme has been approved by the Ministry of Energy and Mineral Resources. This Minimum Work Programme will commit TOO Sekisovskoye to spend US$178,700 (£93,267) in 2005, US$143,800 (£75,052) in 2006 and US$12,500 (£6,524) in 2007 on the exploration and development of this area. Issue of shares In March 2005, the Company issued 62,500,000 ordinary shares (with a nominal value of 0.1 pence each) at 8 pence per share, raising £5 million, before costs, to provide the Company with additional funds to continue the development of its projects. 5. Dividends The Directors are not proposing that a dividend payment be made. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
24th Oct 20237:00 amBUS3rd Quarter Results
29th Sep 20237:00 amBUSHalf-year Report
23rd Jun 202312:14 pmBUSAGM Statement
19th Jun 20237:00 amBUS1st Quarter Results
9th May 20238:12 amBUSStatement re. Suspension
9th May 20237:30 amRNSRestoration - ALTYNGOLD PLC
5th May 20231:19 pmBUSAnnual Financial Report
2nd May 20237:30 amRNSSuspension - ALTYNGOLD PLC
28th Apr 20237:00 amBUSStatement re. Suspension
4th Apr 20233:42 pmBUSIssue of Bonds on AIX
15th Mar 20237:00 amBUSFourth quarter revenue and production update
19th Jan 20232:32 pmBUSAppointment of auditors
13th Dec 202210:56 amBUSRepayment of US$10m bonds
5th Dec 20227:00 amBUSFinancing update
10th Nov 20227:00 amBUS3rd Quarter Results
26th Sep 20227:00 amBUSHalf-year Report
1st Aug 20227:00 amBUS2nd Quarter Results
25th Jul 20224:41 pmRNSSecond Price Monitoring Extn
25th Jul 20224:35 pmRNSPrice Monitoring Extension
25th Jul 20227:00 amBUSFunding updtate
4th Jul 202212:28 pmBUSAGM Statement
27th Jun 20227:00 amBUSFinal Results
16th May 20227:00 amBUS1st Quarter Results
31st Jan 20227:00 amBUS4th Quarter results
24th Jan 202210:21 amBUSDirectorate change
10th Jan 20221:58 pmBUSStatement regarding situation in Kazakhstan
24th Dec 202112:41 pmRNSSecond Price Monitoring Extn
24th Dec 202112:36 pmRNSPrice Monitoring Extension
12th Oct 20217:00 amBUS3rd Quarter Results
15th Sep 202111:05 amBUSCorporate presentation invite
12th Aug 20217:00 amBUSInternational Credit Rating for AltynGold
19th Jul 20217:00 amBUS2nd quarter results
30th Jun 20214:40 pmRNSSecond Price Monitoring Extn
30th Jun 20214:35 pmRNSPrice Monitoring Extension
25th Jun 20215:53 pmBUSAGM Statement
15th Jun 20215:11 pmBUSNotice of AGM
17th May 20217:00 amBUSInitiation Research by Renaissance Capital
11th May 20217:00 amBUS1st Quarter Results
30th Apr 20216:21 pmBUSFinal Results
15th Mar 20217:00 amBUSRenaissance Capital appointment
10th Mar 20217:00 amBUSUnderground mine development update
1st Mar 20217:00 amBUSFirst processing results from Terensai exploration area
1st Feb 20217:00 amBUSAltynGold Plc Quarter Four 2020 production update
9th Dec 20207:00 amBUSChange of Name
8th Dec 20207:00 amBUSThird quarter productions results and financial update
20th Nov 202011:50 amBUSCapital Reorganisation
22nd Oct 20203:04 pmBUSStandard form for notification of major holdings
20th Oct 20207:00 amBUSShare consolidation and change of name
13th Oct 20207:00 amBUSExpansion of the Tailing Storage Facility at Sekisovskoye Gold Processing Plant
7th Oct 20207:00 amBUSInfrastructure development of the Sekisovskoye underground mine

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.