The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAltyngold Regulatory News (ALTN)

Share Price Information for Altyngold (ALTN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 112.00
Bid: 110.00
Ask: 111.00
Change: 0.00 (0.00%)
Spread: 1.00 (0.909%)
Open: 111.00
High: 112.00
Low: 110.00
Prev. Close: 110.50
ALTN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Production Update

10 Jan 2011 10:33

Hambledon Mining Plc

("Hambledon" or "the Company")

10 January 2011

The issuer advises that the following replaces the announcement No. 0109005025 made today at 07.00 which incorrectly stated some of the figures in the table of production. Given below is the full text of the corrected announcement.

The Company reports its production for the three months from 1 October 2010 to 31 December 2010.

October November December Total
Milled tonnes (dry) 83,794 66,368 46,763 199,925
Gold grade (g/t) 0.93 1.20 1.42 1.14
Contained gold (gms) 78,119 83,259 66,302 227,682
Contained gold (oz) 2,511 2,676 2,133 7,320
Gold recovery % 85.2 % 84.2% 83.7% 84.4%
Recovered gold (oz) 2,359 2,268 1,864 6,491
Recovered silver (oz) 5,035 5,076 3,451 13,562

PROCESSING

The 4th quarter of 2010 consolidated the performance of the Sekisovskoye operation as the metallurgical plant achieved good production and sustained higher levels of gold recovery. Mining activities were primarily from the main open pit, with modest amounts of ore extracted from the north pit. The phase 1 refurbishment of the two main hydraulic excavators was undertaken during the quarter, matched to ore inventory levels, so that production from the open pit mine was not hampered.

The performance of the metallurgical plant has been improved with recovery levels averaging 84.7% for Q4, and YTD 83% for gold, and for silver 86% in Q4, and 84% YTD. Work is ongoing to improve the grinding of the ore prior to cyanidation and to improve the dissolved oxygen levels in the cyanide circuit. With this we aim to improve plant recovery to a sustainable 85%-90% recovery of both gold and silver. GBM Minerals Engineering Consultants Ltd.,London, have been engaged to assist with the plant optimisation programme. The mined gold grade at Sekisovskoye remains erratic and is predicted to remain volatile until the open pit mine is deepened further.

Phase 1 winterisation of the crushing and screening plant was completed prior to the onset of the harsh winter period. This infrastructure has helped to mitigate the impact of the cold weather on plant operations. Phase 2 winterisation, combined with upgrading of the surface infrastructure will be undertaken in 2011, in conjunction with construction works associated with the underground mine project.

The cold continental climate is predicted to be harsh in Q1 2011 and whilst the Sekisovskoye operation has remedied the most sensitive components of the surface infrastructure, gold output is budgeted to be less during this winter period.

UNDERGROUND

Development of the underground infrastructure and access tunnels is progressing well, and on schedule to extract ore in December 2011. To date, the infrastructure installed includes electrical substations, dewatering stations, explosives magazines and electrical reticulation for ventilation and construction equipment. The tunneling contractor continues to achieve its driveage targets and maintain a good safety record.

The diamond drilling programme to delineate the resources for the underground mine has commenced. A programme of some 25,000 meters is planned, which will be completed during the second half of 2011. The information from the drilling and sampling will validate the Soviet resource statement, allow detailed mine planning and extraction scheduling as well as upgrade a portion of the resources from inferred to JORC Measured and Indicated. A revised mineral resource and ore reserve statement will be prepared in Q1 2011 reflecting the increased geological knowledge.

Engineering and mine design studies undertaken by consultants AMC of Australia have been completed and additional studies by Golders Associates UK are now focused on the detailed engineering studies relating to the operational design and strata control aspects of the underground operation.

The project will be using a combination of contract mining services and the Company's own resources to further develop the underground operations at Sekisovskoye.

INFRASTRUCTURE

A review of the Life of Mine project cost base (Open Pit and Underground) has highlighted that to meet long term security of electrical supply, lowest process waste capital and unit costs, maintenance of environmental compliance and a continuation of the low social and environmental impact of the operation; upgrading of the surface infrastructure is required. These works will take place in 2011 in order that the underground project development and construction works can be carried out symbiotically and at lowest construction cost.

GBM Minerals have been engaged to undertake various studies and provide site based staff to assist in the development of the mineral process plant and surface infrastructure. Golders Associates UK have been engaged to integrate the design of the process plant waste handling facility with the underground backfill and strata control plant and machinery.

ENQUIRIES:

HAMBLEDON MINING:

Telephone +44 (0)207 233 1462

Charles Zorab

FAIRFAX I.S. PLC:

Telephone +44 (0)207 598 5368

Ewan Leggat

Copyright Business Wire 2011

Date   Source Headline
6th Oct 20205:00 pmBUSIssue of Equity
30th Sep 20206:25 pmBUSHalf-year Report
10th Aug 20204:41 pmRNSSecond Price Monitoring Extn
10th Aug 20204:36 pmRNSPrice Monitoring Extension
10th Aug 202011:35 amBUSAltyn's production update 2Q 2020
23rd Jul 20204:40 pmRNSSecond Price Monitoring Extn
23rd Jul 20204:35 pmRNSPrice Monitoring Extension
21st Jul 20204:40 pmRNSSecond Price Monitoring Extn
21st Jul 20204:36 pmRNSPrice Monitoring Extension
20th Jul 20209:18 amBUSSubsoil use contract extended until 2030
15th Jul 20204:41 pmRNSSecond Price Monitoring Extn
15th Jul 20204:35 pmRNSPrice Monitoring Extension
13th Jul 20204:36 pmRNSPrice Monitoring Extension
30th Jun 20207:00 amBUSAIX Bond placement complete
26th Jun 20204:41 pmRNSSecond Price Monitoring Extn
26th Jun 20204:36 pmRNSPrice Monitoring Extension
26th Jun 20201:36 pmBUSAGM Statement
15th Jun 20207:00 amBUSSocial responsibility update
9th Jun 20207:00 amBUSProduction and financing update
29th May 20205:00 pmBUSAnnual General Meeting (AGM) - 2020
26th May 20207:00 amBUSDrilling rig delivery
22nd May 20205:00 pmBUSIssue of New Shares
18th May 20207:00 amBUSAltyn Plc: Extension to subsoil mining contract at Sekisovskoye
11th May 20207:00 amBUSQ1 production results
1st May 20207:00 amBUSAnnual Financial Report
16th Apr 20204:41 pmRNSSecond Price Monitoring Extn
16th Apr 20204:36 pmRNSPrice Monitoring Extension
16th Mar 20207:00 amBUSAltyn Plc - Production update
28th Feb 20206:11 pmBUSStandard form for notification of major holdings
11th Dec 201911:02 amBUSBond Issue
9th Dec 201912:07 pmRNSSecond Price Monitoring Extn
9th Dec 201912:02 pmRNSPrice Monitoring Extension
4th Dec 20193:24 pmBUSFunding Update
19th Nov 20194:41 pmRNSSecond Price Monitoring Extn
19th Nov 20194:36 pmRNSPrice Monitoring Extension
29th Oct 201911:15 amBUSIssue of new shares - Replacement
28th Oct 20197:00 amBUSIssue of new shares
15th Oct 20197:00 amBUSCPR Results Teren-Sai (Area #2)
8th Oct 20197:00 amBUSCPR Results (Sekisovskoye)
11th Sep 20197:00 amBUSFunding update
6th Sep 20197:00 amBUSAltyn Plc: Updated Website
2nd Sep 20197:00 amBUSHalf-year Report
11th Jul 20197:00 amBUSUnderground machinery delivery
9th Jul 201912:54 pmBUSResignation of Director
28th Jun 20193:42 pmBUSAGM Statement
1st May 20197:00 amBUSFinal Results
19th Mar 20192:37 pmBUSFunding Update
11th Mar 201912:07 pmRNSSecond Price Monitoring Extn
11th Mar 201912:02 pmRNSPrice Monitoring Extension
24th Dec 201812:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.