The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAlba Mineral Resources Regulatory News (ALBA)

Share Price Information for Alba Mineral Resources (ALBA)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0575
Bid: 0.055
Ask: 0.06
Change: -0.0013 (-2.08%)
Spread: 0.005 (9.091%)
Open: 0.0625
High: 0.0612
Low: 0.0612
Prev. Close: 0.0625
ALBA Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Amitsoq Project Update

30 Nov 2015 15:06

RNS Number : 4172H
Alba Mineral Resources PLC
30 November 2015
 

30 November 2015

Alba Mineral Resources plc

("Alba" or the "Company")

Amitsoq Project Update

High grade, large flake size confirmed in initial petrographic and geochemical results from Amitsoq Graphite Project in southern Greenland

 

Further to the company announcement on 6 October 2015, Alba Mineral Resources plc (AIM:ALBA) is pleased to report that a field visit has been completed at the Amitsoq graphite project (the "Project") near Nanortalik in southern Greenland in which Alba has an option to earn up to a 70 per cent. interest. Samples taken from historic workings at the Amitsoq mine have been subjected to graphitic carbon analysis and a petrographic determination of flake size by the British Geological Survey ("BGS") at their laboratory in Keyworth, near Nottingham.

 

HIGHLIGHTS

· Graphitic carbon contents vary from 20.5% to 35.4%, with an overall mean graphitic carbon content of 28.7%, significantly higher than the previously reported historic average grade of 20% and higher than most reported advanced graphite projects globally.

· The graphite exists in various morphologies, ranging from fine-grained specular forms to large discrete crystals, to agglomerations which span areas of up to 15 mm in size.

· Measurements of the discrete graphite flakes suggests that the mean flake-size varies from 300-500 µm ('Jumbo') to 180-300 µm ('Large'), however the single most common flake size is in fact 'Super-Jumbo' (>500 µm). The larger flake sizes attract a premium in the market.

 

Historic Exploration and Production

Greenland has a long history of graphite mining. The Amitsoq graphite mine was an open-cut operation between 1914 and 1924 and produced circa 5,500 tonnes at an average grade of 20 per cent graphite. The graphite was sent to Copenhagen for processing. Other than a local government funded mineral inventory and potential study in 1986, conducted by Danish company A/S Nielson, no other graphite exploration or development has taken place in the licence area since production ceased. Metallurgical testwork on behalf of A/S Nielson reported some flakes reaching a maximum of 15 mm ("Super-Jumbo" flake size), with the average flake size being 0.2-0.3 mm (200-300 µm, or "Jumbo" flake size). Adits into the hillside are also present.

 

Present Results

A field visit was undertaken to the historic Amitsoq mine site. The objectives were: to determine the access to the historic mine site via marine and aerial means; to ascertain the suitability of siting drill rigs in the area; to safely access any open workings; and to collect representative samples of one of the worked graphite horizons to determine carbon content and flake size.

The Company is pleased to report that access to the site was straightforward and was achieved by chartering a helicopter from the Narsaq heliport, located 85 km to the northwest. Several landing sites were identified, but access by sea from the port of Nanortalik, 16 km to the southwest, will be the preferred method of access in future. During the helicopter flypast, a 500 m long flat-lying area above the dipping graphite horizons was observed that is considered ideal for the location of drilling pads if resource definition drilling takes place at the site in future.

Access to the underground workings was by structurally-robust unsupported adits that had been driven "horizontally" into the hillside along the graphite lens. The lens varied between 1 to 2 m in thickness, striking northeast, and dipping to the northwest at 35°. Historical records of the workings state the lens attained a maximum width of 15.2 m, but this was not confirmed during the field visit. A total of ten (10) grab samples (G15101-G15110) were collected during the underground examination: 4 samples across the vein near the entrance; 3 samples across the vein 20 m down the adit; and 3 samples further down the adit to the deepest accessible part of the mine (approximately 40 m from entrance). One grab sample (G15111) from the surface dump was also collected to determine the effects of over 100 years of surficial weathering on the graphite.

 

Graphitic Carbon Assay

All eleven samples were independently analysed by the BGS at their laboratory in Keyworth, near Nottingham. A 50 g subsample was crushed to

The samples present a range of graphitic carbon contents from 20.5% (G15105) to 35.4% (G15101) with an overall mean graphitic carbon content of 28.7% for the eleven samples. Additional metallurgical test work will need to be performed to determine the total recoverable graphitic carbon. These results should be considered to be accurate to +/- 2% as a result of possible loss from ignition of other volatile compounds, such as sulphur and water.

The average grade of 28.7% from these samples at Amitsoq compares favourably with the average grades ofadvanced graphite projects globally. Of 36 projects analysed, only two have grades of 20% or more1. While these results at Amitsoq are taken from grab samples, the grade, coupled with the confirmation of the prevalence of Jumbo and Super-Jumbo flake size, provides great encouragement for future work.

 

Graphitic Flake-Size Analysis

The flake size and petrography of four thin section samples was performed at the BGS utilising polarizing microscope equipment. Petrographic analysis indicated the samples were all recrystallized graphitic gneiss/mica-schist. The graphite exists in various morphologies ranging from fine-grained specular forms to dust and are intergrown with silicate minerals to coarser-grained, discrete, elongate laths that often lie parallel to the rock's fabric to dense mesh- or web-like agglomerations which span areas of up to 15 mm in size.

 

 

 

 

 

Sample number

Flake counts

Graphite flake-size (%)

Mean size (µm)

>500 µm

300-500 µm

180-300 µm

150-180 µm

75-150 µm

Super Jumbo

Jumbo

Large

Medium

Small

G15101

940

39

21

17

7

15

300-500

G15104

504

26

23

25

11

15

300-500

G15106

432

31

20

18

15

17

300-500

G15110

68

16

17

28

17

22

180-300

N.B. These grain sizes only correspond to discrete graphite flakes, and do not consider specular/aggregated forms.

 

The mean flake-size of the discrete graphite varies from 300-500 μm ('Jumbo') (G15101, G15104 and G15106) to 180-300 μm ('Large') (G15110). This is in reasonable agreement with a historic study by A/S Nelson, which reported a slightly smaller average flake size of 0.2-0.3 mm (200 - 300 μm). However the most common flake size in three of the four samples tested is in fact 'Super-Jumbo' (>500 µm), comprising 16 to 39 per cent of the total graphite flake size across the four thin sections sampled. The market places a premium on larger graphite flake sizes.

 

Proposed Future Work

 

Several of the samples will now be dispatched to an independent assay laboratory to determine the presence of deleterious elements and to quantify the presence of sulphides.

A remote sensing study on the Project is expected to begin shortly, funded by Alba, with the main aim of identifying surficial occurrences of graphite on the 146 km² land mass of the licence area. A second aim of this study is to identify ultramafic intrusions which were investigated on Amitsoq in the early 1970s and found to contain up to 2.4 g/t combined gold, platinum, and palladium.

Quotations are currently being reviewed for a high-resolution modern airborne electromagnetic (EM) and magnetic surveys to identify graphitic horizons and sulphide bodies associated with ultramafic intrusions. It is anticipated that this work will commence in the summer of 2016. Follow-up work, if warranted, will consist of diamond drilling to provide a resource estimation.

Additional maps and photographs of the Project area are available on the Alba website at www.albamineralresources.com.

 

Mike Nott, Alba's CEO, commented:

 

"The results from this preliminary study are highly encouraging. We have demonstrated that Amitsoq contains large flake size graphite and appears to be of a high grade. Both of these factors provide great encouragement for future work and development at Amitsoq.

"The priority for Alba is to now determine the graphite prospectivity on other parts of the licence by using modern remote sensing and airborne geophysical techniques. The results of these surveys can then be used to prove continuity and to plan an exploration drilling programme to estimate the thickness and to confirm continuity of the graphite horizons known to exist in the Project area.

"The additional prospect of receiving Platinum Group Element (PGE) credits within the Licence will be an exciting area for Alba to investigate."

 

Competent Person's Declaration

The information in this announcement that relates to the geology, exploration results and work programme is based on information compiled by and reviewed by EurGeol Dr Sandy M. Archibald, PGeo, Aurum Exploration Services, who is a Professional Geologist and Member of the Institute of Geologists of Ireland, and a Fellow of the Society of Economic Geologists. He is a geologist with thirteen years of experience in the exploration industry, and ten years post-graduate studies.

Sandy M. Archibald is a Technical Advisor to Alba Mineral Resources plc and has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration, and to the type of activity which he is undertaking to qualify as a Competent Person as defined in the June 2009 Edition of the AIM Note for Mining and Oil & Gas Companies. Sandy M. Archibald consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears and confirms that this information is accurate and not false or misleading.

 

For further information please contact:

 

Alba Mineral Resources plc

Michael Nott, CEO

 

 

+44 20 3696 4616

Cairn Financial Advisers LLP

Avi Robinson / James Caithie

 

+44 20 7148 7900

 

Dowgate Capital Stockbrokers Limited

Jason Robertson / Neil Badger

 

+44 1293 517744

 

About Alba

Alba holds interests in the following projects:

· UK onshore oil & gas

o A 15 per cent interest in Horse Hill Developments Limited, the owner of a 65 per cent participating interest and operatorship of the Horse Hill oil and gas project (Licence PEDL 137 and PEDL 246) ("Horse Hill"), located on the northern side of the Weald Basin near Gatwick Airport. Independent reports prepared by Nutech and Schlumberger have assessed the petrophysics of the Horse Hill-1 well ("HH-1") (refer to our announcement on 26 August 2016 for details) and the report findings will be integrated into the planned flow test of HH-1 expected in early 2016, subject to final approvals from the Health and Safety Executive ("HSE") and Oil and Gas Authority ("OGA"). Environmental Agency approval was granted on 30 November 2015.

 

o An option to farm into 5 per cent of Production Licence 235, which comprises the producing onshore Brockham Oil Field.

 

· Amitsoq (graphite) - an option to earn up to a 70 per cent interest in a graphite project in Southern Greenland. The licence area comprises the historic Amitsoq graphite mine and is prospective not only for graphite but also for copper, gold, nickel and platinum group elements. During the option period, Alba intends to undertake further historical data acquisition and to carry out field work (ground truthing, mapping and sampling). A remote sensing study is expected to be commissioned to complete this first phase of work (refer to our announcement dated 6 October 2015 for further details).

 

· Mauritania (uranium) - a joint venture with FOSSE Investments Limited comprising early phase exploration targets.

 

· Ireland (base metals) - 10 km away from and part of the same target unit as the Pallas Green property.

Alba continues actively to review and discuss other project opportunities which have value-enhancing potential for the Company whether by acquisition, farm in or joint venture in a range of jurisdictions around the world.

 

[1] http://www.techmetalsresearch.com/metrics-indices/tmr-advanced-graphite-projects-index/

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCWGGGUGUPAGAU
Date   Source Headline
3rd Apr 202010:05 amRNSPublication of Annual Report and Notice of AGM
31st Mar 202011:19 amRNSFinal Results
16th Mar 20202:06 pmRNSSecond Price Monitoring Extn
16th Mar 20202:01 pmRNSPrice Monitoring Extension
13th Mar 20207:00 amRNSHorse Hill Update
9th Mar 202010:07 amRNSHorse Hill Update
3rd Mar 20201:04 pmRNSRelated Party Transaction
3rd Mar 202010:15 amRNSIssue of Convertible Security
24th Feb 20207:00 amRNSInvestment Facility
19th Feb 202012:30 pmRNSHorse Hill Update
19th Feb 20207:00 amRNSAmitsoq Update
28th Jan 202012:29 pmRNSClogau Drilling Results
28th Jan 20207:00 amRNSHorse Hill Update
16th Jan 20207:00 amRNSMining Projects Update
23rd Dec 20197:00 amRNSHorse Hill Update
29th Nov 20191:30 pmRNSClogau Drilling Completion
27th Nov 20197:00 amRNSHorse Hill Update
14th Nov 20197:00 amRNSClogau Drilling Mobilisation
12th Nov 20197:00 amRNSHorse Hill Update
6th Nov 20192:54 pmRNSIssue of Equity
4th Nov 20197:34 amRNSHorse Hill Update
1st Nov 20197:00 amRNSUpdated Corporate Presentation
31st Oct 20192:06 pmRNSAmitsoq Update
22nd Oct 20197:00 amRNSHorse Hill Update
15th Oct 20199:00 amRNSHorse Hill Update
11th Oct 20192:28 pmRNSUpdated Corporate Presentation
11th Oct 201910:23 amRNSHorse Hill Update
9th Oct 20198:38 amRNSHorse Hill Update
8th Oct 20197:00 amRNSHorse Hill Update
30th Sep 20197:01 amRNSHorse Hill Update
24th Sep 20197:00 amRNSHorse Hill Update
12th Sep 20197:00 amRNSHorse Hill Update
11th Sep 201912:54 pmRNSHorse Hill Update
30th Aug 20197:00 amRNSHalf-year Report
21st Aug 20191:55 pmRNSOperational Update and Portfolio Review
6th Aug 201911:30 amRNSClogau Update and Change of Adviser (Broker)
1st Aug 20197:00 amRNSHorse Hill Update
28th Jun 20194:12 pmRNSBrockham Update - Alba Comment
28th Jun 201910:15 amRNSBrockham Update
18th Jun 20197:00 amRNSProject and Investment Update
11th Jun 20197:00 amRNSHorse Hill Update
4th Jun 20197:00 amRNSPlacing and Appointment of Joint Broker
3rd Jun 20197:00 amRNSBrockham Update
31st May 20192:00 pmRNSResult of AGM
29th May 20197:00 amRNSExpanded Areas of Gold Mineralisation at Clogau
17th May 20199:15 amRNSDrilling Commences at Limerick Project
17th May 20197:00 amRNSHorse Hill Update
14th May 20194:30 pmRNSCorporate Presentation
14th May 20193:55 pmRNSMaiden Mineral Resource Estimate for TBS Project
10th May 201910:35 amRNSBrockham Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.