Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksADV.L Regulatory News (ADV)

  • There is currently no data for ADV

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Buffalo Project Update

22 Sep 2021 07:00

RNS Number : 4996M
Advance Energy PLC
22 September 2021
 

22 September 2021 

Advance Energy plc

("Advance Energy" or the "Company") 

Buffalo Project Update

Advance Energy (AIM:ADV), the energy company seeking growth through acquisition or farm-in to non-operated interests in discovered upstream projects, is pleased to provide an update on the Buffalo project offshore Timor-Leste (the "Buffalo Project") ahead of the drilling of the Buffalo-10 well.

Highlights:

· Buffalo-10 well on schedule to spud in early November 2021

· Shallow water depth of 30 metres, with reservoir depth between 3,200-3,300 metres

· Mid case recoverable volume estimate is 34 million barrels (gross, 2C contingent resource) in the Buffalo field

· Buffalo-10 considered by RISC Advisory to have an 85% probability of confirming a sanctionable development project based on the minimum economic field size

· Buffalo-10 to be retained as first production well in development program

· Discussions underway to seek to facilitate accelerated first production

· Equipment currently being mobilised for drilling

 

The Buffalo Project, in which Advance Energy holds a 50% working interest, involves the redevelopment of the Buffalo oil field in the Timor Sea. The field resides in only 30 metres of water, with a reservoir depth between 3,200 and 3,300 meters below the sea bed.

The previous BHP Buffalo development, of 20 years ago, demonstrated the existence of a very high deliverability reservoir containing high quality light oil that is expected to sell at a premium to Brent in today's market.

Carnarvon Petroleum Limited (ASX:CVN) ("Carnarvon"), as the operator of the Buffalo Project, is preparing to drill a well that will penetrate the remaining oil column (confirmed from when the field was still producing at the time of shut-in in 2004), and assess the extent of the revised mapped attic oil column.

RISC Advisory have certified the mid case recoverable volume in the Buffalo field to be 34 million barrels (gross, 2C contingent resource). Further, given that the RISC Advisory certified 1C resource of 16 MMstb is economic down to an oil price of US$35/bbl, it is considered that there is a strong likelihood that the Buffalo-10 well will confirm an economic development project. Accordingly, Carnarvon's drilling plans provide for the Buffalo-10 well to be retained as the first production well in a wider redevelopment program.

In light of the perceived likelihood of an economically viable redevelopment project, the joint venture of Carnarvon and Advance Energy are also working on plans to compress the timeline to first production once the Buffalo-10 well confirms the expected recoverable oil resource. These plans include engaging with industry for supply and installation of suitable equipment to produce the oil.

As announced on 2 September 2021, the VALARIS JU-107 drilling rig has been contracted to drill the Buffalo-10 well. The rig will move to the Buffalo drilling site once it has completed its current operations which are around 300 kilometres from the Buffalo location, with Buffalo drilling operations expected to commence in early November 2021. A site survey of the anticipated surface location has been undertaken, with confirmation that the location is suitable for the jack-up drilling rig.

Aside from the drilling rig, a number of ancillary contracts have now been signed with support vessels, helicopters, drilling service providers and shore base and logistics providers. Equipment is being mobilised in preparation for drilling to commence within a few weeks.

While the majority of support services for the drilling have been confirmed, the final well timing will be subject to the release of the rig from the previous operator, securing the last remaining services and equipment, and receiving the necessary joint venture and regulatory approvals.

Leslie Peterkin, CEO of Advance Energy, commented:

"Advance Energy is pleased to note from that everything is on track for the Buffalo-10 well to spud in early November. As noted in this update, the joint venture has been working hard to ensure everything is lined up to enable the safe drilling of this material well for the Company. The joint venture is confident of Buffalo-10 being both a geological and economic success, and is therefore laying the groundwork to bring the field into production on an accelerated timeline. We look forward to providing a further update to confirm that the rig is in transit to location in due course."

Enquiries:

 

Advance Energy plc

Leslie Peterkin (CEO) / Stephen West (CFO)

+44 (0)1624 681 250

 

Strand Hanson Limited (Financial and Nominated Adviser)

Rory Murphy / James Harris/ James Bellman

+44 (0)20 7409 3494

 

 

Buchanan (Public Relations)

Ben Romney / Jon Krinks 

+44 (0)20 7466 5000

 

Tennyson Securities Limited (Joint Broker)

Peter Krens / Ed Haig-Thomas

+44 (0)20 7186 9030

 

 

Optiva Securities Limited (Joint Broker)

Christian Dennis

+44 (0)20 3411 1881

 

 

 

 

 

For further information, please visit www.advanceplc.com and @advanceplc on Twitter

To register for Advance Energy's email alerts, please complete the following form: https://www.advanceplc.com/media-centre/news/#alerts

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as it forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDLBMJTMTATBIB
Date   Source Headline
12th Jun 20207:00 amRNSAppointment of Buchanan as Communications Adviser
1st Jun 20207:00 amRNSCFO Appointment & Board Reorganisation
1st May 20209:39 amRNSMaster Service Agreement and Strategic Partner
11th Mar 202010:53 amRNSChange of Registered Office
4th Mar 20207:00 amRNSCompletion of strategic review
26th Feb 20202:02 pmRNSResult of EGM & Details of Company name change
20th Feb 20207:00 amRNSReview of Strategy
11th Feb 20202:04 pmRNSHolding(s) in Company
10th Feb 20204:23 pmRNSPosting of Notice of Extraordinary General Meeting
4th Feb 202010:59 amRNSBoard Changes and Subscription
4th Feb 20207:00 amRNSBoard Changes and Subscription
21st Jan 202011:38 amRNSHolding(s) in Company
21st Jan 202010:49 amRNSHalf-year Report
23rd Dec 20192:37 pmRNSPlacing and total voting rights
25th Nov 201912:23 pmRNSResult of AGM
6th Nov 201911:55 amRNSHolding(s) in Company
5th Nov 20197:00 amRNSOperations Update
1st Nov 20193:16 pmRNSNotice of AGM
1st Nov 20197:00 amRNSUKCS 31st Round Update
31st Oct 201910:00 amRNSAnnual Financial Report
2nd Oct 20194:11 pmRNSHolding(s) in Company
27th Sep 20198:15 amRNSOperations Update
18th Sep 20197:00 amRNSOperations Update
16th Aug 20199:00 amRNSOperations Update
7th Aug 20197:00 amRNSOperations Update and Company Presentation
1st Aug 201911:58 amRNSHolding(s) in Company
31st Jul 20195:16 pmRNSTotal Voting Rights
17th Jul 20193:29 pmPRNHolding(s) in Company
16th Jul 20199:49 amPRNHolding(s) in Company
3rd Jul 20199:35 amRNSFurther Loan Note Drawdown and Conversion
26th Jun 20193:39 pmRNSCompany presentation
26th Jun 20198:49 amRNSConversion Notice and Issue of Equity
21st Jun 20197:00 amRNSServices Agreement to Indonesian KSO: Betun-Selo
5th Jun 20197:00 amRNSOffer of New UK Offshore Licences
10th Apr 201910:23 amPRNHolding(s) in Company
4th Apr 20197:00 amPRNResignation of Director
2nd Apr 20196:06 pmRNSTotal Voting Rights
29th Mar 20192:30 pmPRNHolding(s) in Company
29th Mar 201910:57 amPRNHolding(s) in Company
15th Mar 201911:57 amPRNResult of EGM
8th Mar 20199:05 amRNSSecond Price Monitoring Extn
8th Mar 20199:00 amRNSPrice Monitoring Extension
8th Mar 20197:00 amPRNUpdate on Colter
8th Mar 20197:00 amPRNUpdate on Eagle Gas Limited
27th Feb 20197:00 amPRNIssue of Equity
25th Feb 20197:00 amRNSColter Well Update
18th Feb 20197:00 amPRNBunga Mas Update
12th Feb 20191:25 pmRNSBunga Mas Update
6th Feb 201910:55 amPRNColter Well Spud
31st Jan 20197:07 amPRNInterim results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.