Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksADV.L Regulatory News (ADV)

  • There is currently no data for ADV

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Buffalo Project Update

22 Sep 2021 07:00

RNS Number : 4996M
Advance Energy PLC
22 September 2021
 

22 September 2021 

Advance Energy plc

("Advance Energy" or the "Company") 

Buffalo Project Update

Advance Energy (AIM:ADV), the energy company seeking growth through acquisition or farm-in to non-operated interests in discovered upstream projects, is pleased to provide an update on the Buffalo project offshore Timor-Leste (the "Buffalo Project") ahead of the drilling of the Buffalo-10 well.

Highlights:

· Buffalo-10 well on schedule to spud in early November 2021

· Shallow water depth of 30 metres, with reservoir depth between 3,200-3,300 metres

· Mid case recoverable volume estimate is 34 million barrels (gross, 2C contingent resource) in the Buffalo field

· Buffalo-10 considered by RISC Advisory to have an 85% probability of confirming a sanctionable development project based on the minimum economic field size

· Buffalo-10 to be retained as first production well in development program

· Discussions underway to seek to facilitate accelerated first production

· Equipment currently being mobilised for drilling

 

The Buffalo Project, in which Advance Energy holds a 50% working interest, involves the redevelopment of the Buffalo oil field in the Timor Sea. The field resides in only 30 metres of water, with a reservoir depth between 3,200 and 3,300 meters below the sea bed.

The previous BHP Buffalo development, of 20 years ago, demonstrated the existence of a very high deliverability reservoir containing high quality light oil that is expected to sell at a premium to Brent in today's market.

Carnarvon Petroleum Limited (ASX:CVN) ("Carnarvon"), as the operator of the Buffalo Project, is preparing to drill a well that will penetrate the remaining oil column (confirmed from when the field was still producing at the time of shut-in in 2004), and assess the extent of the revised mapped attic oil column.

RISC Advisory have certified the mid case recoverable volume in the Buffalo field to be 34 million barrels (gross, 2C contingent resource). Further, given that the RISC Advisory certified 1C resource of 16 MMstb is economic down to an oil price of US$35/bbl, it is considered that there is a strong likelihood that the Buffalo-10 well will confirm an economic development project. Accordingly, Carnarvon's drilling plans provide for the Buffalo-10 well to be retained as the first production well in a wider redevelopment program.

In light of the perceived likelihood of an economically viable redevelopment project, the joint venture of Carnarvon and Advance Energy are also working on plans to compress the timeline to first production once the Buffalo-10 well confirms the expected recoverable oil resource. These plans include engaging with industry for supply and installation of suitable equipment to produce the oil.

As announced on 2 September 2021, the VALARIS JU-107 drilling rig has been contracted to drill the Buffalo-10 well. The rig will move to the Buffalo drilling site once it has completed its current operations which are around 300 kilometres from the Buffalo location, with Buffalo drilling operations expected to commence in early November 2021. A site survey of the anticipated surface location has been undertaken, with confirmation that the location is suitable for the jack-up drilling rig.

Aside from the drilling rig, a number of ancillary contracts have now been signed with support vessels, helicopters, drilling service providers and shore base and logistics providers. Equipment is being mobilised in preparation for drilling to commence within a few weeks.

While the majority of support services for the drilling have been confirmed, the final well timing will be subject to the release of the rig from the previous operator, securing the last remaining services and equipment, and receiving the necessary joint venture and regulatory approvals.

Leslie Peterkin, CEO of Advance Energy, commented:

"Advance Energy is pleased to note from that everything is on track for the Buffalo-10 well to spud in early November. As noted in this update, the joint venture has been working hard to ensure everything is lined up to enable the safe drilling of this material well for the Company. The joint venture is confident of Buffalo-10 being both a geological and economic success, and is therefore laying the groundwork to bring the field into production on an accelerated timeline. We look forward to providing a further update to confirm that the rig is in transit to location in due course."

Enquiries:

 

Advance Energy plc

Leslie Peterkin (CEO) / Stephen West (CFO)

+44 (0)1624 681 250

 

Strand Hanson Limited (Financial and Nominated Adviser)

Rory Murphy / James Harris/ James Bellman

+44 (0)20 7409 3494

 

 

Buchanan (Public Relations)

Ben Romney / Jon Krinks 

+44 (0)20 7466 5000

 

Tennyson Securities Limited (Joint Broker)

Peter Krens / Ed Haig-Thomas

+44 (0)20 7186 9030

 

 

Optiva Securities Limited (Joint Broker)

Christian Dennis

+44 (0)20 3411 1881

 

 

 

 

 

For further information, please visit www.advanceplc.com and @advanceplc on Twitter

To register for Advance Energy's email alerts, please complete the following form: https://www.advanceplc.com/media-centre/news/#alerts

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as it forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDLBMJTMTATBIB
Date   Source Headline
30th Nov 202112:09 pmRNSResult of AGM
30th Nov 20218:00 amRNSBuffalo Project Update
9th Nov 20217:00 amRNSInvestor Webinar
1st Nov 20217:00 amRNSNotice of AGM
27th Oct 20217:00 amRNSInvestor Presentation
18th Oct 202111:05 amRNSSecond Price Monitoring Extn
18th Oct 202111:00 amRNSPrice Monitoring Extension
18th Oct 20219:05 amRNSSecond Price Monitoring Extn
18th Oct 20219:00 amRNSPrice Monitoring Extension
23rd Sep 20217:00 amRNSFinal Results
22nd Sep 20217:00 amRNSBuffalo Project Update
2nd Sep 20217:00 amRNSRig Contract Signed for Buffalo-10 Well
28th Jul 20219:05 amRNSSecond Price Monitoring Extn
28th Jul 20219:00 amRNSPrice Monitoring Extension
30th Jun 20217:30 amRNSBuffalo-10 Drilling Update
11th May 20217:00 amRNSBuffalo-10 Drilling Update
22nd Apr 202111:00 amRNSRelease of Escrow Documents
20th Apr 20219:05 amRNSSecond Price Monitoring Extn
20th Apr 20219:00 amRNSPrice Monitoring Extension
20th Apr 20217:00 amRNSInvestor Presentation
19th Apr 20217:00 amRNSCompletion of Acquisition, Admission and TVR
16th Apr 202110:16 amRNSResults of EGM
1st Apr 20218:00 amRNSSchedule One - Advance Energy PLC
31st Mar 20214:35 pmRNSPrice Monitoring Extension
31st Mar 20212:05 pmRNSSecond Price Monitoring Extn
31st Mar 20212:01 pmRNSPrice Monitoring Extension
31st Mar 20217:30 amRNSRestoration - Advance Energy PLC
31st Mar 20217:00 amRNSUpdate re Proposed Reverse Takeover Transaction
11th Mar 20211:00 pmRNSBuffalo Oil Field Farm-in
15th Feb 20217:00 amRNSUpdate on Buffalo Oil Field
12th Feb 20217:00 amRNSIssue of Warrants
10th Feb 20217:00 amRNSTermination of Wessex Basin Licences
26th Jan 20217:00 amRNSInterim Results
13th Jan 20217:00 amRNSAppointment of Joint Broker
17th Dec 20207:30 amRNSSuspension - Advance Energy plc
17th Dec 20207:00 amRNSReverse Takeover Transaction and Suspension
2nd Dec 20202:16 pmRNSHolding(s) in Company
30th Nov 202011:59 amRNSResult of AGM
27th Nov 20207:00 amRNSChange of Adviser
12th Nov 20202:37 pmRNSPlacing and Issue of Equity
2nd Nov 20207:00 amRNSNotice of AGM
30th Oct 20202:37 pmRNSFinal Results
7th Oct 20207:00 amRNSTermination of Betun-Selo KSO Agreement
23rd Sep 20209:01 amRNSDirector/PDMR Shareholding
22nd Sep 20207:00 amRNSDirector/PDMR Shareholding
14th Sep 20207:00 amRNSOperations Update
4th Sep 20201:23 pmRNS32nd Offshore Licensing Round Award
27th Aug 20202:22 pmRNSUpdated Company Presentation
31st Jul 20207:00 amRNSCorporate Update
8th Jul 20208:46 amRNSGrant of Share Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.