We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.725
Bid: 0.70
Ask: 0.75
Change: 0.00 (0.00%)
Spread: 0.05 (7.143%)
Open: 0.725
High: 0.725
Low: 0.725
Prev. Close: 0.725
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on 2017 Exploration Programme at Mahenge Liandu Graphite Project

5 Jun 2017 07:00

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Update on 2017 Exploration Programme at Mahenge Liandu Graphite Project

Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce an update on the Company’s 2017 exploration programme at its Mahenge Liandu Graphite Project in Tanzania (‘the Project’ or ‘Mahenge Liandu’).

Overview

Drilling contract signed and mobilisation underway ahead of 2,500m drilling programme due to commence at Mahenge Liandu Objective of drilling programme is to increase both the quantum and confidence category of the maiden JORC Resource estimate of 40.9Mt at 9.41% Total Graphitic Content (‘TGC’) Field work ramping up and access roads improved to support 2017 exploration campaign Bulk sampling of mineralisation commenced to produce graphite concentrate for downstream test work – processing and analysis in Perth, Western Australia Concentrates to be sent to potential offtake partners with preliminary discussions underway

Nick Johansen, Director of Armadale said, Our 2017 exploration programme has now commenced in earnest with the mobilisation of the drill rig and commencement of bulk sampling on site. Although delayed somewhat by an extended rainy season, I am confident that we remain on target to increase our total Resource tonnes and also move a substantial portion of our maiden JORC Resource into the higher confidence Indicated category to enable a prefeasibility study to commence before the end of the year.

“In tandem with our drilling activities, test work will continue including the production of samples of graphite concentrates for the expandable graphite market and the lithium ion battery market, together with the traditional graphite markets. Test work conducted to date has delivered highly positive results, with purity of above 99.95% being achieved for size fractions between 106 µm and 500µm, which are typically used for the production of spherical graphite. These consistently encouraging results underpin the Project’s ability to produce high quality graphite concentrates, which should be suitable for a number of commercial applications.”

Drilling Programme Update

Armadale has signed a drilling contract with CoreworthyDrilling (T) Ltd, an established Tanzanian based drilling company. Mobilisation of the Reverse Circulation (‘RC’) drill rig has commenced and drilling is anticipated to begin in early June.

The exploration programme for 2017 is focused on upgrading the size of the JORC compliant Resource as well as upgrading the resource category so that a significant portion of it moves into the Indicated category. Areas of near surface higher grade mineralisation have been identified for closer spaced drilling. Initial drilling will be RC with selected areas infilled with diamond drilling to provide samples for more detailed metallurgical test work.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:
Armadale Capital Plc

Tim Jones, Company Secretary

+44 20 7236 1177
Nomad and broker: finnCap Ltd

Christopher Raggett / Simon Hicks

+44 20 7220 0500
Joint Broker: Beaufort Securities Limited

Jon Belliss

+44 20 7382 8300
Press Relations: St Brides Partners Ltd

Susie Geliher / Charlotte Page

+44 20 7236 1177

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant inferred mineral resource estimate of 40.9Mt @ 9.41% TGC. At least 32Mt of this resource has an average grade of 10.47% TGC, one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

View source version on businesswire.com: http://www.businesswire.com/news/home/20170604005006/en/

Copyright Business Wire 2017

Date   Source Headline
28th Sep 20107:00 amBUSHalf-yearly Report
9th Sep 20107:00 amBUSIssue of Equity
13th Aug 20108:52 amBUSDirectorate Change
21st Jul 201010:22 amBUSResult of AGM
30th Jun 20104:07 pmBUSResult of AGM
29th Jun 20107:00 amBUSFinal Results 2009
23rd Jun 20102:50 pmBUSFurther re Placing
7th Jun 201010:00 amBUSNotice of AGM
28th May 201012:34 pmBUSHolding(s) in Company
28th May 201011:04 amBUSIssue of Equity
26th May 20107:00 amBUSProposed Placing
14th May 20108:40 amBUSProject Update
21st Apr 201012:15 pmBUSClarification
20th Apr 201010:56 amBUSProject Update
21st Dec 20097:00 amBUSWatermark: Final Scoping Report Approval
7th Dec 20097:00 amBUSRe Agreement
2nd Dec 20092:32 pmBUSHolding(s) in Company
19th Nov 200910:50 amBUSCompany Update
30th Oct 20097:00 amBUSCompany update
7th Oct 20094:10 pmBUSHolding(s) in Company
7th Oct 200910:24 amBUSHolding(s) in Company
5th Oct 20097:00 amBUSInformation Update
29th Sep 20091:59 pmBUSHolding(s) in Company
25th Sep 20091:34 pmBUSHolding(s) in Company
22nd Sep 20093:44 pmBUSHolding(s) in Company
3rd Sep 20092:28 pmBUSIssue of Equity
1st Sep 20097:30 amBUSIssue of Equity
1st Sep 20097:00 amBUSHalf-yearly Report
7th Aug 200910:39 amBUSResource Verification
24th Jul 200911:22 amBUSAGM Statement
30th Jun 200912:04 pmBUSFinal Results
23rd Jun 20094:33 pmBUSHolding(s) in Company
23rd Jun 20091:57 pmBUSHolding(s) in Company
15th Jun 200911:28 amBUSResult of EGM
20th May 20093:33 pmBUSIssue of Equity
17th Mar 20099:10 amBUSIssue of Equity
19th Feb 200911:56 amBUSConclusion of Funding Arrangement with the Development Bank of South Africa ("DBSA")
13th Jan 200911:38 amBUSRe Agreement
13th Oct 20087:00 amRNSPilot Plant Production Results
9th Oct 200810:30 amRNSIssue of Equity
25th Sep 20085:16 pmRNSHolding(s) in Company
5th Sep 200810:10 amRNSHolding(s) in Company
2nd Sep 20084:45 pmRNSHolding(s) in Company
29th Aug 20087:00 amRNSInterim Results
27th Aug 200810:00 amRNSIssue of Equity
27th Aug 20088:00 amRNSDirectorate Change
8th Jul 200810:22 amRNSTotal Voting Rights
30th Jun 20087:00 amRNSAGM statement, Directors deal
12th Jun 20085:33 pmRNSAnnual Report and Accounts
30th May 200811:17 amRNSPreliminary Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.