Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.725
Bid: 0.70
Ask: 0.75
Change: 0.00 (0.00%)
Spread: 0.05 (7.143%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.725
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Drill Results from Mahenge Liandu Graphite Project

18 Oct 2016 07:00

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

18 October 2016

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Positive drill results extend visual discovery of high-gradecoarse flake graphite mineralisation at Mahenge Liandu project

Armadale, the AIM quoted investment company focused on natural resource projects, is pleased to confirm visual logging of Reverse Circulation (‘RC’) chips has extended the discovery of high-grade coarse flake graphite mineralisation at its Mahenge Liandu Graphite Project in Tanzania (‘Mahenge Liandu’).

Summary:

Reverse circulation drilling has confirmed a thick graphite schist deposit with a typical width of 40-60m; Thick intervals of mineralisation have now been intersected from four drill lines which includes 12 RC holes covering 2km of strike length with mineralisation typically commencing near the surface; Graphite mineralisation visually logged as high-grade coarse flake on all four drill lines and is along strike from previously announced results of 60m @ 10.7% Total Graphite Carbon (‘TGC’); Preliminary modelling has indicated a potentially substantial sized graphite resource; and Drilling is continuing on site and is expected to be completed shortly with the results expected before the end of Q4 2016.

William Frewen, Chairman of Armadale said:

“Being able to confirm an extended discovery of high-grade coarse flake graphite mineralisation from an four lines of extensive RC drilling, so shortly after announcing preliminary results, is extremely positive and the Board is highly encouraged with the progress made by the drilling team so far. Moreover, with initial resource modelling pointing towards a substantial near surface graphite resource, the commercial viability of the Mahenge Liandu project is clearly evident.

“Interestingly, recent reports suggest the demand for natural flake graphite could more than double by 2020 to meet the requirements of the battery industry. Concurrently, regulatory changes in China and Europe, could result in demand for expandable graphite, used in flammable retardant building materials, evolving rapidly. Some industry commentators believe this market would require the same quantity of natural flake graphite feedstock as the lithium-ion battery sector further highlighting the exceptional market dynamics of the burgeoning graphite industry.”

Further Information

The RC drilling undertaken, since the inaugural report, the initial results of which were announced on 7 October 2016, comprised four drill lines with new lines of drilling still continuing. All four drill lines intersected substantial graphite mineralisation near the surface within the 2km strike length tested by this drilling programme, which was visually logged as high-grade course flake. The drilling in along strike from previously reported results of 60m @ 10.7% TGC.

The current drilling campaign is expected to conclude shortly. It is expected that the first assay results will be received later in Q4 2016, with an initial Inferred JORC resource anticipated for publication by the end of 2016.

Mahenge Liandu

The Mahenge Liandu project is located in the Ulanga District in south east Tanzania, approximately 300km south west of Morogoro and 10km from the town Mahenge.

High grade graphite mineralisation of up to 33.8% TGC has been demonstrated through analysis of rock-chip samples taken from Mahenge Liandu in June 2016. Previous drilling has confirmed high-grade mineralisation from the surface, with results including 60m @ 10.7% TGC including 24m @ 12.9% TGC and 5m @ 21.5% TGC. The samples were taken from graphite schist outcrops over 1.5km of strike that was mapped by the previous owner surrounding the initial discovery holes.

The area is highly prospective for graphite with Mahenge Liandu located immediately to the east of Kibaran’s Epanko project. In July 2015, Kibaran completed a bankable feasibility study, with the following key findings:

Proven and probable ore reserves of 10.9mt at 8.6% TGC; Annual EBITDA of US$33.6m for 15 years; Sales price US$1,466/t of concentrate, opex FOB Dar es Salaam $570/t; and Metallurgical results: 85.7% of distribution greater than 106 micron, carbon concentrate of 96.3% TGC.

Black Rock Mining’s (`Black Rock’ and ASX:BKT) Mahenge project is situated 1km north-west of Armadale’s Mahenge Liandu project. It has a global resource of 131mt at 7.9% TGC (including 38mt at 10.2% TGC or 16.6mt at 11.1% TGC). Furthermore, Black Rock has delineated circa 80% of its resources in eight months, demonstrating the opportunity to add significant value to the Mahenge Liandu project in a short time frame. On 22 March 2016, Black Rock announced the results of an independent scoping study with:

52,000 tpa graphite concentrate mining operation (25-year mine life); at cash costs of US$458/t; and a sales price of US$1,236/t (FOB Dar es Salaam).

Competent Person statement

The information in this announcement that relates to exploration results is based on information compiled by Mr Matt Bull, a competent person, who is a Member of the Australian Institute of Geoscientists. Mr Bull has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Bull consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

This information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:

Armadale Capital Plc

+44 20 7233 1462

Charles Zorab, Company Secretary

Nomad and broker: finnCap Ltd +44 20 7220 0500

Christopher Raggett / Simon Hicks

Joint Broker: Beaufort Securities Limited +44 20 7382 8300

Jon Belliss

Press Relations: St Brides Partners Ltd

+44 20 7236 1177

Charlotte Page / Susie Geliher

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The project is located in a highly prospective region with proven coarse flake, high grade graphite resources – ASX listed Kibaran and Black Rock have both identified and are developing significant proven and valuable graphite projects immediately adjacent to Mahenge Liandu. A mineralised trend about 2km in strike length and up to 500m wide has been identified at the project, which remains open at depth. Armadale geologists have mapped and sampled the graphite schist, with results from seven previous samples ranging from 12.8% - 24.0% TGC. Exploration drilling completed at the project in December 2015 has further confirmed the mineral potential of the license area, with results including 10mt at 6.54% TGC, 24mt at 12.9% TGC and 5mt at 21.5% TGC. Armadale is targeting a maiden resource estimation in late 2016.

Other assets Armadale has an interest in include the Mpokoto Gold project in the DRC and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

View source version on businesswire.com: http://www.businesswire.com/news/home/20161017006621/en/

Copyright Business Wire 2016

Date   Source Headline
13th Aug 20201:15 pmBUSAssessment of Mahenge Natural Flake Graphite for Battery Applications
16th Jul 202011:43 amBUSUpdated Corporate Presentation
2nd Jul 202010:45 amBUSMining Licence Application Submitted
30th Jun 202010:30 amBUSAGM Statement
18th Jun 202012:00 pmBUSBlock Admission
15th Jun 202010:00 amBUSProject Finance Update
8th Jun 20202:00 pmRNSPrice Monitoring Extension
8th Jun 202011:45 amBUSConversion of CLNs, Exercise of Warrants and Issue of Equity
5th Jun 202011:45 amBUSDFS update increases Mahenge NPV to $430 million
4th Jun 20207:37 amBUSFinal Results and Notice of AGM
29th May 20202:00 pmBUSExercise of Warrants and Issue of Equity
27th May 20202:06 pmRNSSecond Price Monitoring Extn
27th May 20202:00 pmRNSPrice Monitoring Extension
26th May 20207:30 amBUSExercise of Warrants and Issue of Equity
18th May 20207:00 amBUSConversion of CLNs, Exercise of Warrants and Issue of Equity
12th May 202010:00 amBUSUpdated Mine Plan Materially Increases Production
11th May 202010:30 amBUSExercise of Warrants and Issue of Equity
5th May 202011:05 amRNSSecond Price Monitoring Extn
5th May 202011:00 amRNSPrice Monitoring Extension
4th May 202010:45 amBUSExercise of Warrants and Issue of Equity
30th Apr 202010:54 amBUSSubscription
29th Apr 20202:51 pmBUSConversion of Convertible Loan Note
24th Apr 202010:35 amBUSBoard Appointment
16th Apr 202012:45 pmBUSDirectorship Changes
31st Mar 20202:00 pmBUSDFS confirms Mahenge as a long-life low-cost graphite project with US$358m NPV and IRR of 91%
25th Mar 20202:01 pmRNSPrice Monitoring Extension
25th Mar 20201:15 pmBUSTest work produces 97% TGC concentrates
24th Mar 20202:06 pmRNSSecond Price Monitoring Extn
24th Mar 20202:00 pmRNSPrice Monitoring Extension
18th Mar 20204:43 pmRNSSecond Price Monitoring Extn
18th Mar 20204:38 pmRNSPrice Monitoring Extension
10th Mar 202011:30 amBUSImproved Mine Plan Increases Production Output by 100% via staged ramp-up
21st Feb 20207:00 amBUSProject Update
17th Jan 20207:00 amRNSExercise of Warrants and Issue of Equity
7th Jan 202011:01 amBUSAppointment of Non-executive Director
27th Dec 20191:00 pmBUSREPLACEMENT: Exercise of Warrants and Issue of Equity
23rd Dec 20191:45 pmBUSExercise of Warrants
18th Dec 201912:00 pmBUSCorporate Update
6th Dec 20197:00 amRNSAppointment of Non-executive Director
26th Nov 20198:25 amBUSDirectorate change
11th Nov 20199:25 amBUSMine Design & Project Engineer Site Visit Update
1st Nov 201910:36 amRNSFurther Information on Strategic Financing
30th Oct 201910:15 amBUSFurther Strategic Financing
25th Oct 20199:40 amBUSFurther Offtake Agreement MOU
18th Oct 20197:00 amRNSShareholder Webinar
15th Oct 20199:40 amBUSResource Upgrade Confirms High Grade Near Surface Mineralisation
3rd Oct 20197:00 amRNSNew Corporate Presentation
26th Sep 20197:00 amBUSFurther Offtake Agreement MOU
25th Sep 20192:20 pmRNSInvestor Presentation Evening
16th Sep 20191:41 pmBUSStrategic Financing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.