Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksArmadale Capital Regulatory News (ACP)

Share Price Information for Armadale Capital (ACP)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.80
Bid: 0.75
Ask: 0.85
Change: 0.00 (0.00%)
Spread: 0.10 (13.333%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.80
ACP Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exceptionally High Purity – Metallurgical Test-work

8 Aug 2019 07:00

 

Armadale Capital Plc / Index: AIM / Epic: ACP / Sector: Investment Company

8 August 2019

Armadale Capital Plc (‘Armadale’ or ‘the Company’)

Exceptionally High Purity – Metallurgical Test-work

97% Purity Average Concentrate Grade

for Jumbo, Large and Medium Flake Concentrate Achieved

Armadale Capital plc (LON: ACP), the AIM quoted investment group focused on natural resource projects in Africa, is pleased to announce exceptionally high purity results from ongoing metallurgical test-work on diamond drill core from its wholly-owned Mahenge Liandu Graphite Project in Tanzania.

The results, which include 96.8% for jumbo size graphite flakes, 97.1% for large and 97.1% for medium flake sizes, comfortably exceed the 95% average used in the scoping study, while they are in line with the exceptional graphite quality sourced from the Mahenge region in Tanzania.

Highlights:

Ongoing metallurgical test-work delivers exceptional graphite concentrates of up to 97.1% purity for large and medium size flake fractionsTest-work on a high-grade composite currently underway is aimed at maximising the proportion of larger flake sizesResults confirm that premium quality, high-value graphite concentrates can be produced from the Mahenge Liandu depositPrices for premium purity graphite concentrates (concentrations >95%) are materially higher than the standard grade (c.95% or less)Further optimisation work is ongoing at leading metallurgical laboratory, Bureau Veritas in Perth, AustraliaThis test-work forms part of ongoing Definitive Feasibility Study into a high value 400,000tpa graphite operation at Mahenge with a 32-year mine life

Nick Johansen Director of Armadale said: “As we move to gain greater traction with prospective Chinese off-take and project finance partners, it is extremely pleasing to verify high-purity graphite concentrates can be consistently produced from the Mahenge Liandu project.

“The ability to deliver a premium product to fast-growing end markets such as lithium-ion batteries clearly enhances the Project’s overall economics at a time when we are steadily progressing from explorer to emerging producer.

“The Board looks forward to further updating shareholders as progress executing the business plan in the lead up to the Definitive Feasibility Study being finalised towards year end.”

FURTHER INFORMATION

Metallurgical Test-work

Material from seven diamond drill holes from the pit area were used to generate metallurgical composites with the results of the master fresh ore composite now returned.

The results of the test-work indicate a premium quality, high purity graphite concentrate can be produced from a representative sample or mineralisation. The average grade of the composite was 8.65% TGC and this produced an average purity of 96% across all flake sizes with an average of 97.0% in the high value jumbo, large and medium flake size ranges.

Flake Size

Sieve Size

Fresh Master Comp

 

 

 

Head TGC (%) 8.65

 

(µm)

Mesh

Mass (%)

TGC (%)

Jumbo

-500 to 300

15

9.4

96.8

Large

-300 to 180

30

20.6

97.1

Medium

-180 to 150

20

22.6

97.1

Fines

– 150

-100

47.4

94.9

Overall Concentrate Grade (TGC %)

100.0

96.0

Table 1: Flake size distribution and purity from fresh ore composite

The purity levels targeted for the programme are between 95-97% at this stage of metallurgical test-work, which is at the higher end of graphite projects globally.

Test-work on a higher grade composite of ~15% TGC is currently underway with a focus on maximising the proportion of higher value larger flake sizes while maintaining high purity levels.

Reverse Circulation Drilling Results Update

Assay results from the infill drilling are expected to be finalised shortly. Notably, infill drilling targeted higher-grade parts of the deposit. Previous results returned exceptionally high-grade results including 7m @ 16.9% TGC, 7m @ 16.8% TGC and 9m @ 14.8% TGC.

PROJECT BACKGROUND

Mahenge Liandu Graphite Project, Tanzania

Armadale Capital’s wholly-owned Mahenge Liandu graphite project is in a highly prospective region, with a high-grade JORC compliant indicated and inferred mineral resource estimate announced February 2018 – 51.1Mt at 9.3% TGC. This includes 38.7Mt Indicted at 9.3% and 12.4Mt at 9.1% TGC, making it one of the largest high-grade resources in Tanzania.

The work to date has demonstrated the Project’s potential as a commercially viable deposit, with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Currently, Armadale Capital is completing a Definitive Feasibility Study based on the results of a Scoping Study that was completed in March 2018. The study was based on a throughput of 400,000tpa over a 32-year mine life and showed the project has robust economics and warrants further development.

The Scoping Study verified the Mahenge Liandu project could produce a coarse flake, high-purity graphite product underpinning a compelling business case to progress commercialisation plans.

The Scoping Study, based on a 400,000tpa throughput, highlighted the following key positive metrics:

Producing an average of 49,000tpa of high-quality graphite products for a 32-year mine lifeThe near surface nature of the deposit produced a low 1:1 strip ratio for the life of the mineLow operating cost of US$408/t, based on an average 12.5% TGC life of mine gradePre-tax IRR of 122% and NPV of US$349m, with a low development capex of US$35mMaximum draw-down during the construction of the project is US$34.9m and the after-tax payback period is 1.2 years

There remains significant scope to further improve returns, with staged expansions as the current mine plan is based on circa 25% of the total resource.

The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

**ENDS**

Enquiries:

 

Armadale Capital Plc

Paul Johnson, Non-Executive Director (UK)

Tim Jones, Company Secretary

+44 (0) 20 7236 1177

Nomad and broker: FinnCap Ltd

Christopher Raggett / Max Bullen-Smith

+44 (0) 20 7220 0500

Joint Broker: SI Capital Ltd

Nick Emerson

+44 (0) 1483 413500

Press Relations: St Brides Partners Ltd

Isabel de Salis / Juliet Earl

+44 (0) 20 7236 1177

 

Notes

Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant Indicated and inferred mineral resource estimate of 51.1Mt @ 9.3% TGC, making it one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

Other assets Armadale has an interest in, include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments.

More information can be found on the website www.armadalecapitalplc.com.

View source version on businesswire.com: https://www.businesswire.com/news/home/20190807005571/en/

Copyright Business Wire 2019

Date   Source Headline
8th Oct 201011:51 amBUSHolding(s) in Company
28th Sep 20107:00 amBUSHalf-yearly Report
9th Sep 20107:00 amBUSIssue of Equity
13th Aug 20108:52 amBUSDirectorate Change
21st Jul 201010:22 amBUSResult of AGM
30th Jun 20104:07 pmBUSResult of AGM
29th Jun 20107:00 amBUSFinal Results 2009
23rd Jun 20102:50 pmBUSFurther re Placing
7th Jun 201010:00 amBUSNotice of AGM
28th May 201012:34 pmBUSHolding(s) in Company
28th May 201011:04 amBUSIssue of Equity
26th May 20107:00 amBUSProposed Placing
14th May 20108:40 amBUSProject Update
21st Apr 201012:15 pmBUSClarification
20th Apr 201010:56 amBUSProject Update
21st Dec 20097:00 amBUSWatermark: Final Scoping Report Approval
7th Dec 20097:00 amBUSRe Agreement
2nd Dec 20092:32 pmBUSHolding(s) in Company
19th Nov 200910:50 amBUSCompany Update
30th Oct 20097:00 amBUSCompany update
7th Oct 20094:10 pmBUSHolding(s) in Company
7th Oct 200910:24 amBUSHolding(s) in Company
5th Oct 20097:00 amBUSInformation Update
29th Sep 20091:59 pmBUSHolding(s) in Company
25th Sep 20091:34 pmBUSHolding(s) in Company
22nd Sep 20093:44 pmBUSHolding(s) in Company
3rd Sep 20092:28 pmBUSIssue of Equity
1st Sep 20097:30 amBUSIssue of Equity
1st Sep 20097:00 amBUSHalf-yearly Report
7th Aug 200910:39 amBUSResource Verification
24th Jul 200911:22 amBUSAGM Statement
30th Jun 200912:04 pmBUSFinal Results
23rd Jun 20094:33 pmBUSHolding(s) in Company
23rd Jun 20091:57 pmBUSHolding(s) in Company
15th Jun 200911:28 amBUSResult of EGM
20th May 20093:33 pmBUSIssue of Equity
17th Mar 20099:10 amBUSIssue of Equity
19th Feb 200911:56 amBUSConclusion of Funding Arrangement with the Development Bank of South Africa ("DBSA")
13th Jan 200911:38 amBUSRe Agreement
13th Oct 20087:00 amRNSPilot Plant Production Results
9th Oct 200810:30 amRNSIssue of Equity
25th Sep 20085:16 pmRNSHolding(s) in Company
5th Sep 200810:10 amRNSHolding(s) in Company
2nd Sep 20084:45 pmRNSHolding(s) in Company
29th Aug 20087:00 amRNSInterim Results
27th Aug 200810:00 amRNSIssue of Equity
27th Aug 20088:00 amRNSDirectorate Change
8th Jul 200810:22 amRNSTotal Voting Rights
30th Jun 20087:00 amRNSAGM statement, Directors deal
12th Jun 20085:33 pmRNSAnnual Report and Accounts

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.