JV UPDATE

2 Sep 2021 07:00

RNS Number : 4466K
Ariana Resources PLC
02 September 2021
Β 

Β 

Β 

Β 

Β 

Β 

Β 

2 September 2021

AIM: AAU

Β 

JV UPDATE

Β 

Ariana Resources plc ("Ariana" or "the Company"), the AIM-listed mineral exploration and development company with joint-venture gold mining operations in Europe, is pleased to announce its half-year 2021 production update for its joint venture Kiziltepe Mine ("Kiziltepe" or "the Project"). Kiziltepe is 23.5% owned by Ariana through its shareholding in Zenit Madencilik San. ve Tic. A.S.

Highlights:

Β 

Β· Process plant expansion at Kiziltepe is complete and automation testing is underway, with gold production through July and August having remained on target for the year, while the process plant expansion was being completed.

Β 

Β· Gross half-year revenue of US$16.2 million at an average realised gold price of US$1,853 per ounce, against an average revenue per gold ounce of US$2,106 (due to silver credit)*.

Β 

Β· Production and sale of 7,941 ounces of gold during the quarter ended 30 June 2021.

Β 

Β· Operating cash costs for the half-year are estimated at US$591 per ounce, in line with the processing of lower grade ore derived largely from Arzu North through the period.

Β 

Β· Environmental Impact Assessment ("EIA") for Tavsan is making its way through the final approval process.

Β 

Dr. Kerim Sener, Managing Director, commented:

Β 

"We are very pleased to report the completion of the processing plant expansion at Kiziltepe, with automation testing now underway. Since the end of last week, the SAG mill has been supplied with ore and during September we are expecting that the full impact of the plant expansion will begin to be seen. Meanwhile, gold production from Kiziltepe has remained very much on track through July and August, while the plant expansion was being completed. This is an excellent achievement for the joint venture team for which we commend them wholeheartedly.

Β 

"Elsewhere, notably at our Tavsan Project, we are very pleased to note that the formal public consultation period has drawn to a close and the EIA has now been returned to the Ministry of the Environment and Urbanisation for final approval. Once this approval is received, we are looking forward to commencing further development work at Tavsan, which will also include an infill and extension resource drilling programme, to complement the Feasibility Study. In addition, land acquisitions are already well underway with approximately 65% of the necessary freehold land now acquired by the joint venture."

Β 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

* Silver production is not provided, as silver is treated as a by-product credit. All figures are stated gross to the Project unless otherwise stated.

Β 

Summary of Project

Β 

The Kiziltepe gold-silver mine is expected to deliver an average of approximately 20,000 oz gold equivalent per annum over eight years of initial mine life, for a total of up to 160,000 oz gold equivalent based on current resources. The operating company, Zenit Madencilik San. ve Tic. A.S., is a JV between Ariana (23.5%), Proccea (23.5%) and Ozaltin (53%). Management control of the JV lies with Proccea. Commercial production was initiated at Kiziltepe during July 2017 and has continued without interruption to the present, with production consistently being delivered above plan.

Β 

The latest resource estimate for Kiziltepe was based on recent drilling and geological interpretation in April 2020. Detailed technical and economic assessments are underway on several satellite vein systems which are not currently in the mining plan, in anticipation of these being developed in future years. The Kiziltepe operation is currently targeting an increase in mine life and an enhanced processing rate of 400,000 tonnes of ore per annum, with operations currently expected to conclude during 2025. The joint venture is confident that an increase in mine life can be achieved following the success of recent exploration and assuming the conversion of existing resources to reserves.

Β 

Contacts:

Β 

Ariana Resources plc

Tel: +44 (0) 20 3476 2080

Michael de Villiers, Chairman

Β 

Kerim Sener, Managing Director

Β 

Beaumont Cornish Limited

Tel: +44 (0) 20 7628 3396

Roland Cornish / Felicity Geidt

Β 

Panmure Gordon (UK) Limited

Tel: +44 (0) 20 7886 2500

John Prior / Hugh Rich / Atholl Tweedie

Β 

Yellow Jersey PR Limited

Tel: +44 (0) 7951 402 336

Dom Barretto / Joe Burgess / Henry Wilkinson

arianaresources@yellowjerseypr.com

Β 

Editors' Note:

About Ariana Resources:

Ariana is an AIM-listed mineral exploration and development company with an exceptional track-record of creating value for its shareholders through its interests in active mining projects and investments in exploration companies. Its current interests include gold production in Turkey and copper-gold exploration and development projects in Cyprus and Kosovo.

The Company holds 23.5% interest in Zenit Madencilik San. ve Tic. A.S. a joint venture with Ozaltin Holding A.S. and Proccea Construction Co. in Turkey which contains a depleted total of c. 2.1 million ounces of gold and other metals (as at July 2020). The joint venture comprises the Kiziltepe Mine and the Tavsan and Salinbas projects.

The Kiziltepe Gold-Silver Mine is located in western Turkey and contains a depleted JORC Measured, Indicated and Inferred Resource of 227,000 ounces gold and 0.7 million ounces silver (as at April 2020). The mine has been in profitable production since 2017 and is expected to produce at a rate of c.20,000 ounces of gold per annum to at least the mid-2020s. A Net Smelter Return ("NSR") royalty of 2.5% on production is being paid to Franco-Nevada Corporation.

The Tavsan Gold Project is located in western Turkey and contains a JORC Measured, Indicated and Inferred Resource of 253,000 ounces gold and 3.7 million ounces silver (as at June 2020). The project is being progressed through permitting and an Environmental Impact Assessment, with the intention of developing the site to become the second joint venture gold mining operation. A NSR royalty of up to 2% on future production is payable to Sandstorm Gold.

The Salinbas Gold Project is located in north-eastern Turkey and contains a JORC Measured, Indicated and Inferred Resource of 1.5 million ounces of gold (as at July 2020). It is located within the multi-million ounce Artvin Goldfield, which contains the "Hot Gold Corridor" comprising several significant gold-copper projects including the 4 million ounce Hot Maden project, which lies 16km to the south of Salinbas. A NSR royalty of up to 2% on future production is payable to Eldorado Gold Corporation.

Ariana is currently earning-in to 75% of Western Tethyan Resources Ltd ("WTR"), which operates across Eastern Europe and is based in Pristina, Republic of Kosovo. The company is targeting its exploration on major copper-gold deposits across the porphyry-epithermal transition.

Ariana is also earning-in to 50% of UK-registered Venus Minerals Ltd ("Venus") and has to date earned into an entitlement to 37.5%. Venus is focused on the exploration and development of copper-gold assets in Cyprus which contain a combined JORC Inferred Resource of 9.5Mt @ 0.65% copper (excluding additional gold, silver and zinc).

Panmure Gordon (UK) Limited is broker to the Company and Beaumont Cornish Limited is the Company's Nominated Adviser and Broker.

For further information on Ariana you are invited to visit the Company's website at www.arianaresources.com.

Β 

Glossary of Technical Terms:

Β 

"Au" chemical symbol for gold;

Β 

"g/t" grams per tonne;

Β 

"JORC" the Joint Ore Reserves Committee;

Β 

"oz" Troy ounces;

Β 

Β 

Ends.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Β 
END
Β 
Β 
JVELBMATMTTMBMB
Date   Source Headline
29th May 202612:45 pmRNSResult of AGM and Updated Corporate Presentation
26th May 20268:30 amRNSRevised PFS for Optimised Dokwe Gold Project
26th May 20267:00 amRNSAgreement for Strategic Investment - Tranche 2 CDI
18th May 20267:00 amRNSSale of 13.6% Interest in Zenit for US$19.5m Cash
14th May 20267:00 amRNSResource Growth Potential Identified at Dokwe
7th May 20267:00 amRNSUpdate on Dokwe Project Feasibility Activities
30th Apr 20267:00 amRNSQuarterly Activities Report 31 March 2026
29th Apr 20267:00 amRNSNotice of AGM
14th Apr 20267:00 amRNSAppointment of New Non-Executive Chairman
31st Mar 202610:30 amRNSAppointment of Chief Financial Officer
31st Mar 20267:00 amRNSFinal Audited Results for the Year Ended 31 Dec 25
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
11th Mar 20267:00 amRNSHigh-Grade Intercepts Identified at Dokwe North
25th Feb 202612:00 pmRNSResult of GM
4th Feb 20267:00 amRNSSettlement of Outstanding Debt to RiverFort & TVR
2nd Feb 20267:00 amRNS-RAttendance at 121 Mining Investment, Cape Town
30th Jan 202611:00 amRNSQuarterly Activities Report 31 December 2025
23rd Jan 20261:32 pmRNSXinhai Strategic Investment and Notice of GM
21st Jan 20267:00 amRNSDrilling Results from Main & South Zones at Tavşan
8th Jan 20267:00 amRNSHolding(s) in Company
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
23rd Dec 20257:00 amRNSInitial Drilling Results - Dokwe Gold Project
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
22nd Dec 20257:00 amRNSBinding Definitive Agreement for Xinhai Investment
12th Dec 20257:00 amRNSDokwe Drilling Update
9th Dec 20257:00 amRNSTerm Sheet for Strategic Investment in Dokwe
3rd Dec 202511:00 amRNSTavsan First Pour
27th Nov 20257:00 amRNSKizilcukur Drilling Identifies Potential Extension
24th Nov 20259:15 amRNS-RMines and Money London Conference Attendance
13th Nov 20257:00 amRNSHigh-Grade Gold in Drilling Results at Tavsan Mine
4th Nov 20257:00 amRNSExploration Drilling Commences at >1Moz Dokwe
31st Oct 20257:00 amRNSQuarterly Activities Report
23rd Oct 20257:00 amRNSSignificant Dokwe Exploration Update
15th Oct 20257:00 amRNSRig Mobilisation for Drilling Programme at Dokwe
9th Oct 20257:00 amRNS-RPresentation at Marketopen's Investor Sundowner
8th Oct 20257:00 amRNSTavşan Mine is now Fully Operational
30th Sep 202512:00 pmRNS-RCorporate Presentation - September 2025
29th Sep 20257:00 amRNSInterim Results
16th Sep 20257:00 amRNSSummary of Projects with Drilling Planned at Dokwe
10th Sep 20257:00 amRNSCommence Trading on Australian Securities Exchange
8th Sep 202512:37 pmRNSDual Listing on ASX and Total Voting Rights
28th Aug 20257:00 amRNS-RAfrica Down Under Conference Attendance in Perth
22nd Aug 20258:45 amRNSResults of ASX Offer for Dual Listing
18th Aug 20259:30 amRNSDirector/PDMR Shareholding
15th Aug 20258:21 amRNSDual Listing – Close of ASX Offer
8th Aug 20257:00 amRNSASX Offer Open and Tavsan Update
29th Jul 202510:45 amRNSLodgement of ASX Dual Listing Prospectus
28th Jul 20258:36 amRNSDual Listing – Close of Institutional Bookbuild
14th Jul 20257:00 amRNSOperational Update: Tavsan
9th Jul 20251:35 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.