The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1525
Bid: 0.15
Ask: 0.155
Change: 0.0025 (1.59%)
Spread: 0.005 (3.333%)
Open: 0.1575
High: 0.16
Low: 0.1525
Prev. Close: 0.1575
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Hickory-1 Well Flow Test Planning Update

21 Sep 2023 07:00

RNS Number : 1159N
88 Energy Limited
21 September 2023
 

This announcement contains inside information

 

88 Energy Limited

HICKORY-1 WELL FLOW TEST PLANNING UPDATE

Highlights

· Hickory-1 flow test to assess 647 million barrels of oil resources.1,2

· Upper Slope Fan System (Upper SFS) mapping complete, with reservoir zone more laterally extensive than previously considered. Resources in this zone have not yet been estimated and are additional to the pre-drill estimates referred to above.

· Stimulation and flow test modelling for each of the target intervals in Hickory-1 now complete.

· Rig-111 secured for flow test and ordering of long lead flow test items underway.

· Flow test planning and permitting remains on schedule with operations set to commence as early as possible in Q1 2024 in the Alaskan winter operational season.

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to announce that mapping of the recently identified Upper Slope Fan System (Upper SFS) across its Project Pheonix acreage has been finalised. Seismic interpretation and log correlation has revealed that the Upper SFS reservoir is more extensive than originally mapped, correlating over 4 miles (7km) to strong shows in the Icewine-1 well (previously interpreted/attributed to be part of the lower SMD-A package). Resources in this reservoir are not currently included in the Company's resource estimates as they have yet to be assessed.

The Upper SFS target remains an untested reservoir in nearby offset wells. The quality and strength of shows recorded during the drilling and logging of Hickory-1 remain amongst the best the Company has witnessed to date. Moreover, post-well geochemical analysis of Hickory-1 sidewall core data indicate fluid maturity to be in the early-peak oil window.

Figure 1: Mapping of the Upper SFS target indicates reservoir is more extensive than originally thought, correlating over 4 miles (7km) to strong shows in the Icewine-1 well.

 

1 Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

2 Mean unrisked resource - Net Entitlement to 88 Energy. Refer announcement released to ASX on 23 August 2022. Resources estimated pre-Hickory-1 drilling.

 

 

Figure 2: Mapping of the Upper SFS reservoir correlating to strong shows in the Icewine-1 well.

 

Industry leading simulation models have been built for each of the target intervals in Hickory-1, with the objective of ensuring a successful stimulation and flow test in each zone. The Hickory-1 simulation models incorporate high quality offset well data and operational lessons learnt in the area. As is typical for early stage appraisal and development operations, the largest gains in understanding are achieved in the initial stages of activity and analysis, with 88 Energy set to benefit from neighbouring offset well test results. As previously reported, Pantheon Resources have announced flow rates of 50-100 BOPD from a number of vertical wells and intervals in the adjacent northern acreage.

 

These vertical test results, although modest, provide critical information in understanding the reservoirs and also allow the design of long, horizontal wells that would be employed in any development scenario. Using unconventional completion techniques, horizontal development wells typically achieve 6-12 times the flow rates seen in vertical wells in analogue fields in the Texas Lower 48.

Figure 3: Imaged of modelled stimulation test designs and results.

Post-well analysis and flow test modelling of the Hickory-1 reservoirs have enabled accurate calculation of the quantum of completion fluids as well as the design of the completion string necessary for flow test operations. Sourcing and procurement of these long lead items is underway with operations scheduled for early Q1 2024. Permitting is on track with the Alaskan state authorities and All American Oilfield's recently upgraded Rig 111 drilling/workover module has been secured for the flow test program.

 

 

This announcement has been authorised by the Board.

 

 

Media and Investor Relations

 

88 Energy Ltd

Ashley Gilbert, Managing Director

Tel: +61 8 9485 0990

Email:investor-relations@88energy.com

Fivemark Partners, Investor and Media Relations

Michael Vaughan

Tel: +61 422 602 720

EurozHartleys Ltd

Dale Bryan

Tel: + 61 8 9268 2829

Cavendish Securities Plc

Tel: + 44 (0)207 908 6000

Derrick Lee 

Tel: +44 (0)131 220 6939

Pearl Kellie

Tel: +44 (0)131 220 9775

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

 

 

 

About Project Phoenix

Project Phoenix (88E 75.2% WI) is located on the central North Slope of Alaska and encompasses approximately 82,846 gross acres. It is situated on-trend to recent discoveries by Pantheon Resources Plc (LSE: PANR) in multiple, newly successful play types across top, slope and bottom-set sands of the Mid Schrader Bluff, Canning and Seabee formations. Hickory-1 results and independent mapping have demonstrated that these plays extend into the Phoenix acreage.

Project Phoenix holds an estimated unrisked conventional total of 647MMbbl of prospective oil resources (pre-drilling, mean unrisked, net to 88E), independently assessed by Lee Keeling and Associates (LKA) in Q3 2022 (see 88E ASX release dated 23 August 2022). The acreage was significantly de-risked by the recent Pantheon drilling and flow tests on their adjacent acreage to the North, coupled with data from Icewine-1 well logs (encountered 380 ft of net oil pay within SMD sands) and a modern 3D seismic data set (FB3D).

Project Phoenix is strategically located on the Dalton Highway with the Trans-Alaska Pipeline system running through the acreage providing an immediate export route and expediting future development.

 

Figure 4: Project Phoenix lease area, including mapped play fairways, Franklin Bluffs 3D area and Hickory-1 well location.

 

 

Phoenix: Alaska North Slope

Unrisked Net Entitlement to 88E 1,6 Prospective Oil Resources (MMstb) 4,5

Prospects (Probabilistic Method)

Low (1U)

Best (2U)

High (3U)

Mean

COS3

Shelf Margin Delta (SMD A, B & C)

44

140

326

145

81%

Slope Fan System (SFS)

24

84

217

89

50%

Basin Floor Fan (BFF)

75

341

930

358

50%

Kuparuk (KUP)

24

56

98

56

72%

Prospects Total

 167

621

 1,570

647 2

 

 

1. These pre-drilling resources estimates are net to 88 Energy and have been calculated using a 75.227% working interest and a 16.5% royalty.

2. The unrisked means, which have been arithmetically summed, are not representative of expected total from the prospects and implies a success case in all reservoir intervals. 88 Energy cautions that the arithmetically summed 1U estimate may be a conservative estimate and the arithmetically summed 3U estimate may be optimistic when compared to a statistical aggregation of probability distributions.

3. COS represents the geological chance of success as assessed by 88 Energy and reviewed and endorsed by LKA. 

4. Prospects are subject to a phase risk (oil vs gas). The pre-drilling chance of oil has been assessed as 100% for all targets except for the Kuparuk Formation which has been assessed as 70%. Phase risk has not been applied to the unrisked numbers.

5. The Prospective Resources have not been adjusted for the chance of development. Quantifying the chance of development (COD) requires consideration of both economic and other contingencies, such as legal, regulatory, market access, political, social license, internal and external approvals and commitment to project finance and development timing. As many of these factors are outside the knowledge of LKA they must be used with caution.

6. Please refer to ASX announcement dated 23 August 2022 for further details in relation to the prospective resources estimate and associated risking with Phoenix.

7. It should be noted that the prospective resources and COS values were calculated prior to the drilling of Hickory-1.

 

Cautionary Statement: The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially movable hydrocarbons.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCZZGZLKGNGFZM
Date   Source Headline
20th Jan 20229:00 amRNSPrice Monitoring Extension
18th Jan 20228:20 amRNSQuarterly Activities Report and Appendix 5B
17th Jan 20227:00 amRNSMerlin-2 Operations Update
10th Dec 202111:06 amRNSSecond Price Monitoring Extn
10th Dec 202111:01 amRNSPrice Monitoring Extension
7th Dec 20217:00 amRNSIssue of Equity
6th Dec 20217:00 amRNSMERLIN-2 OPERATIONS UPDATE
30th Nov 20217:00 amRNSCorporate Presentation
24th Nov 20217:00 amRNSMerlin-2 Appraisal Well Location Selected
8th Nov 20218:24 amRNSResult of General Meeting
26th Oct 20217:00 amRNSMERLIN-2 APPRAISAL WELL – RIG CONTRACT EXECUTED
15th Oct 20217:49 amRNSQuarterly Report and Appendix 5B
7th Oct 20219:49 amRNSNotice of GM
2nd Sep 20217:00 amRNSCorporate Presentation
2nd Sep 20217:00 amRNSResult of Placing
31st Aug 20217:00 amRNSProposed placing to raise A$20 million
16th Aug 20217:00 amRNSMerlin-1 well confirms light oil
11th Aug 20217:00 amRNSInterim Report
4th Aug 20217:27 amRNSUmiat Oil Field - Update
2nd Aug 20217:00 amRNSStrengthening Board and Management
27th Jul 20217:00 amRNSQuarterly Report and Appendix 5B
15th Jul 20217:00 amRNS100% Working Interest in Project Peregrine
14th Jul 20217:00 amRNSMerlin-1 Testing Program Update
13th Jul 20214:41 pmRNSSecond Price Monitoring Extn
13th Jul 20214:35 pmRNSPrice Monitoring Extension
12th Jul 20217:51 amRNSIssue of Equity
6th Jul 20218:38 amRNSIssue of Equity
2nd Jul 20214:40 pmRNSSecond Price Monitoring Extn
2nd Jul 20214:35 pmRNSPrice Monitoring Extension
2nd Jul 20219:05 amRNSSecond Price Monitoring Extn
2nd Jul 20219:00 amRNSPrice Monitoring Extension
1st Jul 20214:41 pmRNSSecond Price Monitoring Extn
1st Jul 20214:36 pmRNSPrice Monitoring Extension
1st Jul 202110:11 amRNSIssue of Equity
1st Jul 20218:30 amRNSFull Repayment of Debt
30th Jun 20217:00 amRNS88 Energy Adopts Global Standard for ESG Reporting
28th Jun 20214:41 pmRNSSecond Price Monitoring Extn
28th Jun 20214:35 pmRNSPrice Monitoring Extension
28th Jun 20212:05 pmRNSSecond Price Monitoring Extn
28th Jun 20212:00 pmRNSPrice Monitoring Extension
28th Jun 202111:05 amRNSSecond Price Monitoring Extn
28th Jun 202111:00 amRNSPrice Monitoring Extension
28th Jun 20219:05 amRNSSecond Price Monitoring Extn
28th Jun 20219:00 amRNSPrice Monitoring Extension
24th Jun 20217:00 amRNSMerlin-1 Testing Program Update
21st Jun 20214:41 pmRNSSecond Price Monitoring Extn
21st Jun 20214:35 pmRNSPrice Monitoring Extension
21st Jun 20217:00 amRNSSale of Tax Credits and Full Repayment of Debt
7th Jun 20217:05 amRNSIssue of Equity
7th Jun 20217:00 amRNSAcquisition of Interest in Project Peregrine

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.