Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFirst Tin PLC Regulatory News (1SN)

Share Price Information for First Tin PLC (1SN)

Share Price is delayed by 15 minutes
Get Live Data
11.75    0.00 (0.00%)
Bid:
11.50
Ask:
12.00
Spread: 0.50 (4.348%)
Market Cap: £62.86m
1SN Live PriceLast checked at - London Stock Exchange

Intraday First Tin PLC Share Chart

Taronga Gravity Circuit Mineral Processing Update

7 Mar 2024 07:00

RNS Number : 8902F
First Tin PLC
07 March 2024
 

 

7 March 2024

First Tin Plc

("First Tin" or "the Company")

Taronga Gravity Circuit Mineral Processing Update

 

Results of New Gravity Circuit Testwork at ALS Laboratory Return Excellent Recoveries, Significantly Improving on Previous Testwork

 

 

First Tin PLC, a tin development company with advanced, low capex projects in Germany and Australia, is pleased to announce that additional mineral processing testwork for its Definitive Feasibility Study ("DFS") at its Taronga Tin Project ("Taronga") in Australia, has shown enhanced recoveries from the gravity circuit of the project.

 

ALS Laboratory in Burnie, Tasmania, one of the foremost laboratories for tin processing testwork worldwide, recently completed testwork on crushing preconcentrates of two samples from the Taronga project:

 

1. A "low grade" bulk sample, blasted from the old Newmont adit in the North zone, with a head grade of 0.11% Sn.

2. A composite "variability" sample of half core from throughout the deposit (both North and South zones), constructed to be close to the average composition and average head grade of the deposit, around 0.13% Sn.

Results highlights:

 

· Gravity circuit testwork on both the low grade bulk sample and the variability core sample crushing pre-concentrates has returned:

Low grade (0.11% Sn): 71.5% tin recovery to a 69.8% Sn concentrate

Variability (0.13% Sn): 72.5% tin recovery to a 60.1% Sn concentrate

· These results are significant improvements on the previous recoveries for the high grade bulk sample (0.18% Sn), due to optimising the flowsheet based on the earlier work.

· The results confirm that mineralisation with head grades at or below the average head grade of 0.13% Sn, return plus 70% recovery to the coarse tin gravity circuit.

· Inclusion of a fine tin circuit will be examined later and this should increase the overall recovery even further.

· Total recovery, including losses from the crushing pre-concentration, will be reported in the next few weeks.

Based on learning from the previous testwork on the "high grade" sample, the recent ALS testwork more closely followed the revised processing flowsheet, include size classification before the spiral circuit.

 

Results were excellent, with recoveries through the gravity circuit of 71.5% tin to a 69.8% Sn concentrate for the low grade sample and 72.5% tin to a 60.1% concentrate for the variability sample. 

 

These are both significant improvements on the previous high grade sample results, which returned a gravity circuit recovery of 66.4% tin to a 56.2% Sn concentrate. The new recoveries are close to those obtained by previous work conducted by Newmont and Aus Tin.

 

Additional work is being conducted on dressing of the variability sample concentrate, with the aim of increasing concentrate grade.

 

Both samples had previously been upgraded by crushing and screening at 2.8mm and thus overall recovery will be proportionately lower. End to end results including the crushing will be reported in the next few weeks.

 

It should be noted that the low grade sample has a lower head grade (0.11% Sn) than the average mined grade (0.13% Sn) and the variability sample has a head grade of 0.13% Sn, close to the average for the deposit. Hence assumptions drawn from this work may be conservative.

 

First Tin CEO, Bill Scotting commented: "This work builds on and improves the previous mineral processing testwork on the initial bulk sample. Optimisations by our team in Australia and the ALS Laboratory have successfully shown the deposit has a recovery of over 70% through the gravity circuit, confirming the previous Newmont testwork. The work also shows that gravity circuit recoveries for mineralisation that grades below the average grade being mined, remain above 70%, thus alleviating concerns that the previous testwork was only conducted on samples with above average head grade. Results for the full circuit, including crushing, will be reported in the next few weeks, and results of that are eagerly awaited."

 

The project is owned by First Tin's 100% owned Australian subsidiary, Taronga Mines Pty Ltd ("TMPL").

Enquiries:

 

First Tin

Via SEC Newgate below

Bill Scotting - Chief Executive Officer

 

Arlington Group Asset Management Limited (Financial Advisor and Joint Broker)

 

Simon Catt

020 7389 5016

WH Ireland Limited (Joint Broker)

Harry Ansell

020 7220 1670

SEC Newgate (Financial Communications)

Elisabeth Cowell / Molly Gretton

FirstTin@secnewgate.co.uk

 

Notes to Editors

First Tin is an ethical, reliable, and sustainable tin production company led by a team of renowned tin specialists. The Company is focused on becoming a tin supplier in conflict-free, low political risk jurisdictions through the rapid development of high value, low capex tin assets in Germany and Australia, which have been de-risked significantly, with extensive work undertaken to date.

Tin is a critical metal, vital in any plan to decarbonise and electrify the world, yet Europe has very little supply. Rising demand, together with shortages, is expected to lead tin to experience sustained deficit markets for the foreseeable future.

First Tin's goal is to use best-in-class environmental standards to bring two tin mines into production in three years, providing provenance of supply to support the current global clean energy and technological revolutions.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSSLFWMELSEFD
Date   Source Headline
25th Oct 20237:00 amRNSTaronga DFS Update
22nd Sep 20237:00 amRNSInterim Results
18th Sep 20237:00 amRNSEnd-to-End Mineral Processing Testwork at Taronga
14th Sep 20237:00 amRNSMineral Resource Estimate Upgrade at Taronga
11th Sep 20237:00 amRNSResults of Crushing Testwork
6th Sep 20237:00 amRNSBoard Changes
31st Aug 20237:00 amRNSApplication for Exploration Licence
29th Aug 20237:00 amRNSFinal results from Tin Beetle drilling at Taronga
23rd Aug 20237:00 amRNSNotice of Results
28th Jun 20237:00 amRNSTin Beetle Discovery at Taronga Tin Project
27th Jun 202312:20 pmRNSResult of AGM
12th Jun 20237:00 amRNSCompletion of Taronga Drilling and Assay Results
5th Jun 20237:00 amRNSTellerhäuser Permitting Process Update
16th May 20237:00 amRNSDirector/PDMR dealing
15th May 20237:00 amRNSTaronga Confirmatory Drilling Update
21st Apr 20237:00 amRNSPosting of Accounts and Notice of AGM
12th Apr 20237:00 amRNSFinal Results
3rd Apr 20232:49 pmRNSNotice of Results
3rd Apr 20237:00 amRNSTaronga Power Supply Update
27th Mar 20237:00 amRNSTellerhäuser Permitting Process Update
13th Mar 20237:01 amRNSTaronga Drilling and DFS Update
13th Mar 20237:00 amRNSTellerhäuser Drilling and DFS Update
27th Jan 20237:00 amRNSExtension of Taronga Tin Mineralisation
16th Jan 20234:40 pmRNSSecond Price Monitoring Extn
16th Jan 20234:35 pmRNSPrice Monitoring Extension
13th Jan 20234:40 pmRNSSecond Price Monitoring Extn
13th Jan 20234:35 pmRNSPrice Monitoring Extension
22nd Dec 20229:42 amRNSThe assay results at Tellerhauser
22nd Dec 20227:00 amRNSThe assay results at Tellehauser
6th Dec 202212:15 pmRNSDirector/PDMR dealing
6th Dec 202212:08 pmRNSDirector/PDMR dealing
28th Nov 20227:00 amRNSCritical metals grant from the NSW Government
1st Nov 20227:00 amRNSFirst Tin receives ESG Rating from Digbee
3rd Oct 20229:05 amRNSNon-Executive Director Appointment
21st Sep 20227:00 amRNSDrilling Commenced at Taronga Tin Project
20th Sep 20227:00 amRNSInterim Results
12th Sep 202212:40 pmRNSChange in Interim Results date
1st Sep 20227:00 amRNSPositive Intercepts from Gottesberg, Germany
19th Aug 20227:00 amRNSCommencement of DFS at Tellerhäuser
18th Aug 20227:00 amRNSNotice of Results and Investor Presentation
11th Aug 20227:00 amRNSCommencement of Deep Drilling at Tellerhäuser
3rd Aug 20227:00 amRNSCommencement of DFS at Taronga
12th Jul 20227:00 amRNSDirector/PDMR Shareholding
1st Jul 20227:00 amRNSResult of AGM
20th Jun 20227:00 amRNSGottesberg tin project update
13th Jun 20227:00 amRNSDirector/PDMR dealing
9th Jun 20227:00 amRNSMOU with ECOBAT’S Resources Freiberg (ERF)
1st Jun 20227:00 amRNSDirector/PDMR dealing
30th May 20227:00 amRNSFinal Audited Results
12th Apr 202211:45 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.