Next steps.10 Feb 2024 16:34
Wireline logs and drill stem tests completed.
Secondary analysis of samples is a formality.
"Despite having an accurate, independent field PVT laboratory on site, the Company has collected duplicate samples where possible, and these will be sent to a second laboratory for independent verification."
Unless the independent lab on site has equipment malfunction, the results should be similar. I'm sure they would calibrate to check.
The company has held back information. Compare with nobles 4th December rns.
1. Reservoir thickness.
2. Formation pressure.
3. Formation permeability.
We don't have any indication of volume.
That information is typically released.
4.5% helium concentration from a 100m high pressure reservoir is worth a lot more than a 5m low pressure reservoir.
The company should release that information and schedule a flow test. The latter they can justify doing before lab results get back.
Debating averaging up here. I'll hold off untill the company releases more information.