RE: Could 6p be26 Apr 2019 14:22
Alan,
The pictures of the equipment on those lorries, which as I said I am assuming they were seen heading for Brockham. Are you saying that the equipment on those lorries is needed to run the plug? I can see what it looks like a piece of a flare to me.
If it is flare, then it will be used during testing. To me, and I am sure many others, if a piece of equipment is going to be used in testing ... then it is testing equipment.
And yes, the Angus plan it says that ordering of the testing equipment will be after stage 1 completion; reperforation, logging and water isolation.
And yes, the Angus plan said they will start on the 12th April ... they started on the 9th.
And yes, the Angus plan said the will do water isolation, then reperforation and recompletion ... but they slightly modified stage 1 and did reperforation first.
And yes ... plans can be optimised.