RE: Production Testing Should start Today23 Jul 2021 12:35
"The drill rig has been released, well completion activities are underway, and perforation / production testing of the well is on track to commence on or around 23 July 2021"
Glide, fair enough, I didn't read again I went from memory which was wrong. Doesn't change the fact that it should be flowing by now. 9 days to run completion, perforate and hook up to the production system. Don't know how much they perforated but they did it through tubing as they were running completion on 14th, so guessing just lower Cruze (70ft). Even if it was all 300ft, 9 days is a long time for these activities.
Anyway, we haven't been given any details of the testing so we don't know how long that will be. It will probably be a combination of flow and pressure build-up to get reservoir info, but there should be some early flow rates, albeit probably won't release until they have the volume data.