RE: Current cash build rate17 Nov 2021 20:16
Apologies, I used the wrong hedged quantity, in the interim results presentation I see that 100,000 MWH per month hedged, I had been using a figure quoted in an interview with AA. Hopefully correct this time!
Current net production rate = (12,700*0.6) = 7,620 boepd / 42.7 MMscf
Hedged quantity = ((100,000/30.5) * 3412 / 5600) = 1,998 boepd / 11.2 MMscf
Using 5.6Mcf = 1 BOE, and 1MWH = 3,412cf and Dutch TTF at E 95 per MWH
Unhedged Revenue = (42.7-11.2) * 1,000,000 * 95 / 3412 = E 877,052
Hedged Revenue = 11.2 * 1,000,000 * 25 / 3412 = E 82,063
Total Revenue = E 959,115 per day
Opex per day at $5.50 per boe = 7,620 * 5.5 * 0.88 = E 36,880
Operating Cash Flow = ( 959,115 - 36,880 ) = E 922,235 per day
Vista