RE: CH-1 Drill2 Mar 2023 08:46
Yes, I'm pleased because it probably lowers rig requirements and will therefore improve rig availability, but disappointed as the oil play was always a nice long-shot to have in the bag. Seems to me they just want to get going. No doubt there will be future oil play prospects, but getting to gas production is clearly the #1 target (particularly to keep the Tanzanian authorities sweet).
"The results of the initial 3D seismic processing and interpretation, to optimise the target location of the CH-1 well at the Cretaceous reservoir level, will be available by mid-March. Following a review by the Operator, the CH-1 well will no longer target the lower Jurassic zone. The processing of the seismic data is more than 80% complete."