RE: Resource talk13 Jan 2024 23:19
Magicallena
A cracking post. Thanks. CUSN starts at around 44 minutes. The interviewer was well prepared, punchy and one of the best .
However, one point which I felt was left unclear was whether CUSN has all the permits it needs to get into production. I understand that it has.
Another point which RW brought out at the end was to correct an erroneous perception that South Crofty is linked to many other mines hydrologically. However, RW expects pumping to continue at a rate of 6,500 cubic metres a day once the mine is dewatered and will then need only one of the three pumping streams currently being used to dewater the mine. (De-watering is currently removing and treating up to 25,000 cu m a day)
It sounds as if exploration news may be coming through in April onwards. And it sounds as if CUSN has several parties interested in providing debt finance. Most encouraging.