RE: ARA to use their existing drilling rig, hence no delay once the licence arrives?22 May 2024 16:09
Im pretty confident when needed, ARA can deploy a rig within a reasonable timeframe but lets manage some expectations, no rig gets mobilised and operational in this part of the world "quickly". (I Have deployed and move rigs and managed drill sites in Eastern Tanzania). Lots of variables.... access roads, availability of vehicles, support camps, drill rig, mud tanks, drilling chemicals and materials, drill string, drill bits. As LTH know......All good things come to those who wait....