There is so little volume of shares being bought and sold that the listing on AIM is pointless. The company will struggle to raise on AIM and may have to be taken into private hands.
Whatever happened to this -100k per drill19 Sep 2025 09:10
Future Plans for Project II
The results of JSR-01 DEEP are being incorporated into the subsurface model prior to an update of the Patardzeuli contingent resources. This will support full-field redevelopment plans through the deepening of existing vertical wells and the design and execution of horizontal wells.
Unswept oil in the field will be initially targeted by low-cost drilling techniques using the Company's recently upgraded A-80 service rig for an initial well-deepening programme across the field (with average costs per deepening operation anticipated to be in the USD 100k region). An opportunity set of 15 existing vertical wells is being ranked to define the optimal deepening candidates.
The current position of ADMARINE 510 is in Persian Gulf with coordinates 26.18577° / 50.67076° as reported on 2025-09-14 14:32 by AIS to our vessel tracker app. The vessel's current speed is 0 Knots and is currently inside the port of HIDD
The existing President who is rerunning for office is 92 years old. He sleeps most of the time and with an election looming the last thing on his mind will be signing off approval for Asher.
He current position of ADMARINE 510 is in Persian Gulf with coordinates 26.18577° / 50.67080° as reported on 2025-09-12 07:16 by AIS to our vessel tracker app. The vessel's current speed is 0 Knots and is currently inside the port of HIDD.
The current position of ADMARINE 510 is in Persian Gulf with coordinates 26.18574° / 50.67077° as reported on 2025-09-11 08:25 by AIS to our vessel tracker app. The vessel's current speed is 0 Knots and is currently inside the port of HIDD.