RE: What is Left for 2022 ?23 Oct 2021 13:10
Chester hey,
Look at this and it shows all its Zoros list hope he does not mind me re posting :-)
October 2021
04/21. Juri JV commences.
14/05/21. Decline commences. (420m deep / 2.6km long).
15/07/21. Mine officially open.
09/21. Juri JV discovers gold @ Goliath / Outamind. 5 ASSAYS PENDING.
09/21. At Hav, additional significant grades identified between 1200m and 1450m.
Significant grades identified in N breccia Potential to expand the MMRE(inferred).
E breccia 600m extended strike length. 18 ASSAYS PENDING.
Q4/21 90,000m growth drilling continues into 2022.
12/10/21. Hav PFS. (Stage 4 of farm in, complete. NCM earns 70 % of Hav and qualifies for extra
5% at fair value).
10/21. Los Diablos / Parlay / Saddle reef ASSAYS PENDING.
28/10/21. NCM September quarterly results.
10/11/21. NCM AGM.
26/11/21. Firetower/Warrentinna mining rights expire.
09/12/21. NCM Interim report.
12/21. Option to buy additional 5% of Hav (deadline: 12/22).
12/21. GDXJ quarterly rebalance..
12/21. Option for NCM to take over management @ Juri JV.
H2/21. Drilling programme commences – Rudall.
27/01/22. NCM December quarterly results.
Q1/22. MRE(2)(Inferred) for extended SE Crescent and breccia / N. breccia zone.
2022. Drilling commences @ Ernest Giles.
Q4/22. D.F.S. Decision to be made to Bulk Mine (as a JV) by NCM / GGP.
[NCM loan of $50m runs out on completion of DFS].
[Decision to mine will result in payment of 145m shares to Pacific Trends Resources].
08/07/22. Bromus mining rights expire.
Q3/22. Exploration decline and ventilation shafts complete.
Q4/22. Bulk Mine decline commences. [1200m deep / 8km long].
Q4/22. Sub Level Caving construction (SLC)(Stoping)) commences.
10/22. Byrnecut contract for first decline terminates.
H1/24. SLC full commercial production commences (est; 2-3 years from start of 1st decline).
01/11/23. Panorama mining rights expire.
Q3/26. Block Cave Mine (BCM) construction begins (access and ventilation shafts).
2028. BCM production. (SLC and Bulk Mining, operating in tandem).
2031. Stoping estimated end of life based on:(13Mt/2MozAuEq/2Mt/yr).
2033. Stoping estimated end of life based on:(26Mt/2.9MozAuEq/3Mt/yr).
2053+. BCM estimated end of life.