Currently, construction has commenced on a 530-km carbon steel pipeline that will traverse three provinces: Dornod, Sukhbaatar, and Dornogovi.
To put it in perspective, the pipeline will transport over 4100 tonnes of oil daily from Matad soum to Altanshiree soum under high pressure. Additionally, the amount of oil transported per day can be increased to 6500 tonnes, which equates to 2.4 million tonnes annually.
In addition to the pipeline project, the inauguration marks the official commencement of the EPC two and three packages, which were previously delayed due to the epidemic. These packages will be carried out by Megha Engineering and Infrastructures Ltd, India's leading provider of engineering, procurement, and construction services in the water management, power, and renewable energy sectors.
Further work will include the establishment of a pipeline and a thermal power plant, which will handle the transportation of raw materials required for the oil industry as well as the generation of electricity for their processing.