RE: No twitter deramping7 Dec 2018 08:02
In 2006, TLP-101V was drilled as a vertical well onshore, and encountered oil in the Pointe Indienne Formation
R1, R2 and R3 sandstones, but also in the deeper Mengo sandstone. Well TLP-101ST was deviated up to 75o
inclination to the southwest, encountering oil in the R1, R2 and R3 sandstones. The well was put on
production in 2007 from the R2 sandstone. Initial flow was 942 stb/d. At the end of September 2016 the
well was producing at a rate of 38 stb/d dry oil.