Oily Bloke14 May 2020 09:31
Not sure as much as you say but 3 time will do it at 900 dbd as previous RNS's
Given the knowledge of the Portland's true flow potential, plans are now being formulated to drill either the HH-1z sidetrack or HH-2 new drill as a horizontal Portland appraisal well, with a targeted* sustainable daily production rate of 720 to 1,080 bopd, 2 to 3 times the forecast calculated* HH-1 vertical well rate of 362 bopd. All planning permissions, Environment Agency permits and the HH-2 well cellar are in place for a horizontal well. If successful it is envisaged that all future Portland production will be via horizontal wells.
Intresting on old RN's which commented on Portland connectivity
Prior to the Kimmeridge production switch, which was necessary for the safe drilling and coring of HH-2/2z through the Portland reservoir, total aggregate Portland production reached 29,568 bbl, with HH-1 continuing to produce dry Portland oil at a stable rate of over 220 bopd. Preliminary Company analysis of the final Portland pressure build-up test, indicates that the Portland connected oil volume accessed by HH-1 has significantly increased from 7-11 million bbl to 11-14 million bbl, a robustly commercial volume
Give it a week or two and we will see some news
GLA