RE: Tick tock....transformation next week12 Mar 2021 15:21
http://www.canoverseas.com/wp-content/uploads/2021/02/COPL-Atomic-Corporate-Acquisition-Presentation-02-21.pdf
From this, the wording doesn't explicitly state but my reading is the WI x expected/actual BOPD
"A Game Changing Acquisition for COPL cont.
5
• The Operated oil fields are new (Young) oil producing assets, at the beginning of their 40+ year life, current
inclining production (see page 16) growth from gas/propane miscible flood implemented as a secondary recovery
scheme shortly after the delineation/development
• Barron Flats Unit (57.7% WI): Miscible Flood commenced December 2019. Production increased from c. 200
bbl./d to c. 1,400 bbl./d (2017 to Sept 2020) with a forecast 2P production rate plateau of 5,000 bbl./d (page
16) in 2022 (Ryder Scott Report).
• COPL re-simulated BFU plateau production (January 2021): 7,000 bbl./d at 10 MMCF/d gas injection
rate (page 17)
• Cole Creek Unit (66.7% WI): Field Limits defined by drilling, Miscible Flood to be commenced upon plateau of
Barron Flats Unit production. Forecast production rate plateau of c. 3,500 bbl./d under the 2P reserves case
(Ryder Scott Report) in 2026.