RE: 88e1 Apr 2023 13:40
Panr drilled their well to 14,000feet it was the bottom 1000feet where they had the sand blockage,
88e have decided to only drill to 11,000 feet instead of 12,500, was this to make sure they stay away from any problems,
I think this was a very good decision from the board,