RE: From spinefx in hotcopper 25/2/1925 Feb 2019 11:29
They will be using LWD, logging while drilling so results will come as they drill!
The Nordic Rig#3 commenced drilling of the Winx-1 exploration well at 15:15 on the 15th February (AK time) - on schedule. The well was drilled to 600' prior to pulling out of hole to pick up the smart bottom hole assembly, with logging while drilling tools attached. At 11:45 17th February (AK time), Nordic Rig#3 was drilling ahead at 880'. The forward plan is to deepen the hole to ~2,500' before setting surface casing. See schedule below for additional details.