RE: Waffle30 Apr 2025 07:36
An initial exploration target of 100,000 to 200,000 tonnes of contained copper equivalent at circa 1.20%, open pittable and shallow underground, has been calculated by our team. Although this is a target, and there is both upside and downside risk to this number, the work undertaken thus far strongly suggests whatever happens with the drill bit, there is sufficient tonnage and grade to take this project into production on an industrial scale.