RE: Happy Sunday8 Jan 2023 12:27
Easy, that is a very important point!!
My assumption was the same rig would do the fist CC recompletion, then move on to the two Fed deep horizontals, then come back to Cole Creek to complete the remaining 5/6 wells.
Doing both simultaneously is GREAT news for us, given the sensitivity of the negotiations that are ongoing.
So we have moved from not having enough tubular and no rigs booked to having all tubulars and TWO rigs on site!!!
Thanks for sharing, look like our prayers are being answered.