We looking at drilling 202723 Sep 2025 08:45
The reporting period was dominated by operational and funding preparations for the drilling of Chuditch-2, which had been expected to commence during Q3 2025 but was ultimately delayed (as outlined below) and is now expected to be drilled during the first half of 2026